INDOOR PLAYGROUND DESIGNER/ MANUFACTURER Montrose ...

11
INDOOR PLAYGROUND DESIGNER/ MANUFACTURER Montrose Community Recreation Center REQUEST FOR PROPOSALS RFP–15–2 for Indoor Playground Designer/Manufacturer MONTROSE, COLORADO September 1, 2015 Proposal Statements Due 2:00 PM October 2nd, 2015

Transcript of INDOOR PLAYGROUND DESIGNER/ MANUFACTURER Montrose ...

Page 1: INDOOR PLAYGROUND DESIGNER/ MANUFACTURER Montrose ...

INDOOR PLAYGROUND DESIGNER/ MANUFACTURER

Montrose Community Recreation Center

REQUEST FOR PROPOSALS RFP–15–2

for

Indoor Playground Designer/Manufacturer

MONTROSE, COLORADO

September 1, 2015

Proposal Statements Due 2:00 PM

October 2nd, 2015

Page 2: INDOOR PLAYGROUND DESIGNER/ MANUFACTURER Montrose ...

INDOOR PLAYGROUND DESIGNER/ MANUFACTURER

Montrose Community Recreation Center

Introduction The Montrose Recreation District, Colorado (Owner) hereby solicits proposals for the design, fabrication, and installation of an indoor play structure and accessory items at their proposed new recreation center. The center will be constructed at 16350 Woodgate Road, Montrose, Colorado. Building construction began in June and is expected to be complete in September of 2016. Barker Rinker Seacat Architecture (BRSA) is the architect of the project.

Project Description The final design of the Montrose Recreation District’s Community Recreation Center is the result of several previous planning assignments where Barker Rinker Seacat Architecture was contracted to help with developing a program, design, and building community support for the new recreation facility. The final design encompasses 80,000 sq. ft., equally divided between Aquatics and Sports and Fitness portions of the building. It features a 5500 s.f. leisure pool, a 10 lane 25 yard x 8 lane 25 meter competitive pools, three basketball courts, 2 racquetball courts, a large family game area, children’s indoor play area, a therapy space operated by the local hospital, second level fitness, track, exercise class room and support spaces. The combined pools will be the largest public pool on the western slope and is designed to include both a highly competitive and recreational uses to increase the use by all the residents of the district and tourists. The mission of the indoor playground is to create an interactive play environment with a very creative design. The ability of the playground designer/ manufacturer to create a play structure that maximizes the number of children on the structure at one time as well as utilize the indoor space for maximum enjoyment by its participants, is an important consideration. The recreation district would like to reach a broad age range of children including the 2-5 year olds and the 6-10 year olds. A standard outdoor play structure will not be acceptable for this proposal. A themed structure is desired. The design of this structure must meet all ADA (Americans with Disabilities Act) requirements for play structures.

Building Concept The building was inspired by the unique and breathtaking natural features that surround the region. Montrose prides itself as the home of the Black Canyon and this is reflected in the building’s exterior which takes it’s cue from the “Painted Wall” of the Black Canyon. Views from the new facility look south and east towards the San Juan’s and the Cimarron Mountain Ranges. Inside there are references to Montrose’s railroad beginnings and the climbing wall references the Black Canyon in its color. The space allocated for the play structure and accessory items has been designed by BRSA to reflect these vertical focal points on the horizon and thus become a focal point of the facility.

Indoor Playground Theme There are two possible themes that tie to the building, mountains and agriculture. Mountains: As stated above the building is inspired by the nearby topographical features of the region and this would also be an appropriate theme for indoor play. Kids love the mountains. They love to climb, romp, play, giggle and generally let loose. This indoor play area is for them. Agriculture: With the completion of the Gunnison Tunnel in 1909, Montrose became an

Page 3: INDOOR PLAYGROUND DESIGNER/ MANUFACTURER Montrose ...

INDOOR PLAYGROUND DESIGNER/ MANUFACTURER

Montrose Community Recreation Center

agricultural hub. Since then, farming has been a major part of Montrose’s way of life. Directly adjacent to the indoor play area is the Child Watch Room which has an agricultural theme that focuses on growth. The Owner’s desire for the indoor playground component of the recreation center includes the incorporation of an imaginative play structure and accessory items (exhibits) that take advantage of the unique volume of the proposed room and create an environment that supports either a mountain theme or agricultural theme. Additionally, it should appeal to kids of all ages but have a particular focus on younger kids. To emphasize these themes, the District requests the playground designer/ manufacturer propose an overall design concept that displays a playful mountain or farm environment. All designs supporting either theme will be considered. Playground designers/ manufacturers should incorporate fun, colorful, stimulating, playful, and safe exhibits that may include, but not be limited to:

Fake soft rocks and logs on which to climb Playground structure depicting a mountain or rocks, railroad or mine Caves and/ or a tunnel to explore under the mountain Slides Swings Climbing area Narrow gauge railroad Log RR depot “play house” Climbable haystacks Vegetables (especially corn) Farm Animals Farm house/Barn Farm equipment such as tractors, combines and plows Sounds of nature (wind, quaking aspens, crackling of a fire, animals noises, running

river) The playground designer/ manufacturer will be required to work with the Owner and BRSA to develop the design of the structure and accessory items. Once a final design is approved, the manufacturer will prepare construction drawings for the playground structure and accessory items and coordinate the installation with the Construction Manager/ General Contractor (CMGC) and the associated subcontractors constructing the recreation center. The playground designer/ manufacturer will be responsible for maintaining the schedule set by the CMGC and Owner for successful completion of the project. The successful playground designer/ manufacturer will execute a subcontractor agreement with the CMGC and will be completely liable and responsible for the design, fabrication, shipping, erection, and safety of the proposed play structure and accessory items. The District is tax exempt so no taxes will apply. Any and all costs incurred by the respondent in the preparation and delivery of the proposal is the responsibility of the respondent and will not be reimbursed by the Montrose Recreation District. Included with this Request for Proposal are floor plans, sections, and 3D views prepared by BRSA (4 sheets) that illustrate the space allocated for the indoor play structure. The proposed location and shell configuration are fixed. The District’s budget for the design, fabrication, and installation, complete with accessory items, is $50,000. Items such as storage cabinetry, lighting,

Page 4: INDOOR PLAYGROUND DESIGNER/ MANUFACTURER Montrose ...

INDOOR PLAYGROUND DESIGNER/ MANUFACTURER

Montrose Community Recreation Center

power requirements, etc., will be provided under the building construction contract. Please make note in your proposal if the components of your play unit meet I.P.F.M.A. certification (International Play Equipment Manufacturers Association), as well as Consumer Product Safety Commission Guidelines and ASTM standards as required by the state of Colorado. The flooring system should also meet or exceed CPSC and ASTM standards for playground equipment surfaces. Safety flooring has already been incorporated into the building GMP so the designer/manufacturer does not need to carry this cost.

Proposal Submissions Submit an electronic copy by email to [email protected] as well as the following number of copies of your written proposals in a sealed envelope no later than 2:00 p.m., October 2nd, 2015. Facsimile proposals will not be accepted. Five (5) copies to:

Ken Sherbenou Executive Director – Montrose Rec. District PO Box 63 Montrose CO 81402

One (1) copy to:

Andy Stein Design Manager Barker Rinker Seacat Architecture 3457 Ringsby Court, Unit 200 Denver, CO 80216 Phone: (303) 455-1366 Email: [email protected] Please direct all questions to Andy Stein. CAD layouts can be provided upon request.

Preliminary Schedule Issue Request for Proposal ............................................................. September 1st, 2015 Proposal Due Date ................................................................ October 2nd, 2015 at 2pm Proposal Review and possible interview period ......... October 2nd-October 16th, 2015 Selection and Contract Award .........................................................October 23rd, 2015

Submission Requirements Proposals are required to provide responses to the following outline of questions and requirements. Proposals should be in the form of 8-1/2 x 11 bound reports with optional foldouts when necessary. A. FIRM ORGANIZATION

Page 5: INDOOR PLAYGROUND DESIGNER/ MANUFACTURER Montrose ...

INDOOR PLAYGROUND DESIGNER/ MANUFACTURER

Montrose Community Recreation Center

1. Identify the firm name and business location (include branch locations). 2. Provide a brief description of the firm (year established, type of ownership). 3. List the services available from your firm. 4. List the staff organization chart of your firm, indicating the size of the firm and number

of employees. 5. Submit proof of liability insurance.

B. PRELIMINARY DESIGN & BUDGETING 1. Identify your approach to developing design concepts for a play structure. 2. Describe your process for cost estimating at this phase. 3. Define the fees associated with the preliminary design of the structure. The District’s

intent is to contract with an indoor play structure manufacturer for complete design, fabrication, and installation, but will retain the option to terminate the contract at the completion of the preliminary design phase.

4. Indicate what material (plans, elevations, renderings) will be provided to convey design concept.

5. Include samples of past projects.

C. DESIGN DOCUMENTATION, FABRICATION & INSTALLATION 1. Identify your method for construction/fabrication, documentation for review and approval

by the District. 2. Provide a sample of construction/fabrication drawings from a similar project. 3. Describe how you define and document final cost for the play structure and how you

make adjustments to the design to control costs. 4. Indicate how you will coordinate your efforts with the General Contractor with respect to

minor changes to the building design and scheduling of installation. D. REVIEW OF PROPOSED DESIGN & BUDGET

1. Provide your comments to the proposed design concept described in the project description and as shown on the attached drawings.

2. Provide your comments to the proposed budget. Identify types of components and finishes that can be provided within this budget. Please provide alternative options that would allow the client to add options with an associated cost.

3. The preliminary schedule presented in this Request for Proposal is an estimate for the time frames required to accomplish each task. Review and comment on the feasibility of the schedule and indicate where adjustments in each time frame may be required.

E. Provide the following information for five projects (completed within the last 10 years).

Include projects of comparable scope, program, and budget. 1. Name and location of the project 2. Brief description 3. Photographs and drawings of the design 4. Type of facility in which play structure was installed 5. Number of children play structure can accommodate at one time 6. Name, address, and telephone number of the Owner (indicate contact person) 7. Actual construction schedule 8. Original construction budget 9. Final construction cost

Page 6: INDOOR PLAYGROUND DESIGNER/ MANUFACTURER Montrose ...

INDOOR PLAYGROUND DESIGNER/ MANUFACTURER

Montrose Community Recreation Center

Selection Process The Montrose Recreation District Board and staff along with members of the design team will review the proposals submitted and select the firm that will best accomplish the design, fabrication, and installation of the indoor play structure. The Montrose Recreation District and Barker Rinker Seacat Architecture want to thank all respondents in advance for their interest, effort, and creative input into the new Montrose Recreation Center project.

Page 7: INDOOR PLAYGROUND DESIGNER/ MANUFACTURER Montrose ...

1 0 3/16”38”

4 6 1/4”

34”41”

3”

2 0 1/2”

1"

1"

3 9 1/4”

7"4"1" 20”

3”

MONTROSE COMMUNITY REC CENTER INDOOR PLAY

A1

1 0 3/16”38”

4 6 1/4”

34”41”

3”

2 0 1/2”

1"

1"

3 9 1/4”

7"4"1" 20”

3”

F.E.C.

F.E.C.

F.E

.C.

F.E

.C.

F.E

.C.

UP

LOWER LEVEL PLAN

ENTRY

INDOOR PLAY

Page 8: INDOOR PLAYGROUND DESIGNER/ MANUFACTURER Montrose ...

J

13 1814 1615

106A

106C

104A

PARTY ROOM A

106A

PARTY ROOM B

106B

CHILD WATCH

105

FIRE EXTINGUISHER

CABINET

WATER

FOUNTAIN

HATCH INDICATES RECESSED FLOOR SLAB EXTENT

2

AX- 008

R 1

2' -

6"

R 12' - 6 1/8"

5' - 2 1/2"

17' -

2 3

/4"

7' -

4 1

/4"

5' -

11 5

/8"

R 1

2' -

6"

R 12' - 6 1/8"

5' - 2 1/2"

25' - 2 11/16"

0' - 2 1/2"

PLAY ROOF

127' - 0"

ENTRY LEVEL

102' - 0"

8' -

0"

EXTERIOR WALL IS SHOWN

TRANSPARENT FOR CLARITY

ANGLED EXTERIOR

STOREFRONT

INTERIOR STOREFRONT

SEPARATES CHILD WATCH

LOBBY

TO INDOOR PLAY

MONTROSE COMMUNITY REC CENTER INDOOR PLAY

ENLARGED INDOOR PLAY

INDOOR PLAY SECTION

3D CUT AWAY OF INDOOR PLAY

Page 9: INDOOR PLAYGROUND DESIGNER/ MANUFACTURER Montrose ...

ACRYLICCLOUDSHANGING FROMSTRUCTURE

VINYL WALLCOVERING

3D VIEW FROM CHILDWATCH

Page 10: INDOOR PLAYGROUND DESIGNER/ MANUFACTURER Montrose ...

MONTROSE COMMUNITY REC CENTER INDOOR PLAY

ENLARGED INDOOR PLAY CONCEPT 1

1.2.

2.

CONCEPT 1:FREESTANDING PLAY STRUCTURE

MAY INCLUDE BUT NOT LIMITED TO:1. FREESTANDING STRUCTURE2. SMALLER FEATURES3. SLIDE(S)4. CLIMBING FEATURE5. TUNNEL OR CAVE6. OTHER PLAY ELEMENTS

STRUCTURE SHOULD TAKEADVANTAGE OF THE TALL CEILINGSPACE

FREE STANDING FEATURE

Page 11: INDOOR PLAYGROUND DESIGNER/ MANUFACTURER Montrose ...

MONTROSE COMMUNITY REC CENTER INDOOR PLAY

ENLARGED INDOOR PLAY CONCEPT 2

1.

2.2.

CONCEPT 1:FREESTANDING PLAY STRUCTURE

MAY INCLUDE BUT NOT LIMITED TO:1. WALL BASED STRUCTURE2. SMALLER FEATURES3. SLIDE(S)4. CLIMBING FEATURE5. TUNNEL OR CAVE6. OTHER PLAY ELEMENTS

STRUCTURE SHOULD TAKEADVANTAGE OF THE TALL CEILINGSPACE

WALL BASED FEATURE