Indonesian Policy of Supplying Natural Gas & LNG for Power ... GENERAL OF · PDF...
date post
03-Feb-2018Category
Documents
view
223download
2
Embed Size (px)
Transcript of Indonesian Policy of Supplying Natural Gas & LNG for Power ... GENERAL OF · PDF...
11
Kementerian ESDM Republik Indonesia
Indonesian Policy of Supplying Natural Gas & LNG for
Power, Industries & Shipping
IGN Wiratmaja
Director General of Oil & Gas Ministry of Energy & Mineral Resources
6th Annual LNG Transport, Handling & Storage Forum 2016
Bali, 14 September 2016
22
Kementerian ESDM Republik Indonesia
+ 5,000 km
INDONESIA AS A MARITIME COUNTRY
33
Kementerian ESDM Republik Indonesia
1. Indonesia Oil & Gas Balance
3
44
Kementerian ESDM Republik Indonesia
dalam MMSCFD
PROYEKSI PRODUKSI GAS BUMI 2015 2050
55
Kementerian ESDM Republik Indonesia
2019MULAI IMPOR GAS
National Energy Agency Forecast: Gas demand in 2025 will make up to 20% of National Energy Mix (7,134 BOED), or 8,249 BBTUD
NERACA GAS BUMI INDONESIA 2015 2030
66
Kementerian ESDM Republik Indonesia
PEMANFAATAN GAS BUMI INDONESIA 2016
Kelistrikan14.98%
Pupuk10.50%
Industri22.10%
Lifting Minyak3.02%
City Gas0.05%
BBG Transportasi0.06%
Ekspor Gas Pipa11.80%
LNG Ekspor29.10%
LNG Domestik5.91%
LPG Domestik2.50%
1,024.60
718.09
1,510.91
206.20
3.13 3.78
1,136.39
758.76
1,814.76
321.05
3.51 8.50
-
200
400
600
800
1,000
1,200
1,400
1,600
1,800
2,000
Kelistrikan Pupuk Industri Lifting Minyak City Gas
BB
TU
D
Realisasi Penyaluran Gas Pipa untuk DomestikTahun 2016
Realisasi (BBTUD) Kontrak
Status s.d. Mei 2016
77
Kementerian ESDM Republik Indonesia
535
4.000
3.500
1.500
1.000
2.500
3.000
2.000
500
5.500
4.500
5.000
785
5.3154.550
1.810
2.230
3.270
2.190
2.190
1.085
3.950
2.120
2.195
1.435
2.270
2.600
2.025
+4%
2.065
15 Years
AVE CAGR
OE Production
4%
In mboepd
In 2015 the gap between national supply and demand begins.
0
2012 2013 2014 2015 2020 2025 2030 2040 2050
National Supply National Demand
|source : ESDM, SKK Migas, Upstream Team Projection 4
NATIONAL OIL & GAS DEMAND & PRODUCTION
88
Kementerian ESDM Republik Indonesia
15 Years
CAGR Average
7%
Gas
Consumption
Industry (98,26%)
Household (0,11%)
Commercial (1,34%)
Transportation (0,29%)
In mmscfd
In 2021 the gap between national supply and demand begins.
18.000
16.000
14.000
12.000
10.000
8.000
6.000
4.000
2.000
4.1003.640
5.800
9.100
3.995
7.0008.130 8.145
3.650 3.910
5.700
8.1108.165
13.600+7%
3.400
11.300
16.300
2.500
0
2012 2013 2014 2015 2020 2025 2030 2040 2050
National Supply National Demand|source : ESDM, SKK Migas, Upstream Team Projection
NATIONAL GAS DEMAND & PRODUCTION
99
Kementerian ESDM Republik Indonesia
2. Gas Infrastructure Development
9
1010
Kementerian ESDM Republik Indonesia
EXISTING
ROADMAP
2016 2030
Infrastruktur Gas Bumi Existing & Rencana
KEBUTUHAN INVESTASI
(Miliar USD)
Pipa
12
Liquefac
tion
25.6
SPBG +
CNG
1.93 TOTAL
48.2Regasific ation
6.1
Jargas
2.2
LPG
0.4
1111
Kementerian ESDM Republik Indonesia
Cluster I Papua dan Papua BaratCluster II Maluku, Maluku Utara, Sulawesi Utara, Sulawesi Tengah Cluster III Nusa Tenggara Timur, Nusa Tenggara Barat, Sulawesi SelatanCluster IV Natuna dan Kalimantan Barat
CLUSTER II (MALUKU)
Pembangkit 130 MMSCFD [875MW]
Smelter 100 MMSFD
Industri 55 MMSCFD
Rumah Tangga 1 MMSCFD
CLUSTER I (PAPUA)
CLUSTER II (MALUKU)
CLUSTER III (NUSA TENGGARA)
CLUSTER IV (NATUNA)
CLUSTER I (PAPUA)
Pembangkit 138M MSCFD [630 MW]
Industri 288 MMSCFD
Rumah Tangga 1 MMSCFD
CLUSTER III (NUSA TENGGARA)
Pembangkit 183 MMSCFD [1750 MW]
Smelter 100 MMSCFD
Rumah Tangga 1 MMSCFD
CLUSTER IV (NATUNA)
Pembangkit 49 MMSCFD [495 MW]
Rumah Tangga 1 MMSCFD
VIRTUAL PIPELINE CLUSTER CONCEPT
1212
Kementerian ESDM Republik Indonesia
Primary Hub Sorong
CLUSTER I (PAPUA)
Pembangkit 31 LokasiFSRU/FSU/FRU 3 LokasiLand Based Regas 8 LokasiIso Tank Regas System 8 Lokasi
Rencana Pembangkit 630 MW
Kebutuhan Gas 138 MMSCFD
Liquefaction Plant
Secondary Hub/Land based Storage
Smelter
FSRU
PLTGU/MGU
PLTG/MG
MPP
Land based Regas Terminal
LNG Iso tank Regas System
Small Vessel Route
Isotank Barge Route
FSU
Primary Hub Jayapura
Primary Hub JayapuraTotal Pembangkit : 11 (250 MW)Gas Demand : 50 MMSCFDIsotank : 90 Iso/ 2 weeks
LNG Vessel : 8000 m3
Frequency : 2 x 2 weeksTravel : 1,600 km
Primary Hub SorongTotal Pembangkit : 9 (200 MW)Gas Demand : 46 MMSCFDIsotank : 144 Iso/ 2 weeksTotal Distance : 2,200 km
Primary Hub TimikaPembangkit : 11 (180 MW)Gas Demand : 41 MMSCFDIsotank : 180 Iso/ 2 weeks
LNG Vessel : 8000 m3
Frequency : 2 x 2 weeksTravel : 700 km
LNG Vessel : 8000 m3
Frequency : 1 x 2 weeks
Travel : 1,600 km
LNG Vessel : 8000 m3
Frequency : 1 x 2 weeksTravel : 1,000 km
Primary Hub Timika
1313
Kementerian ESDM Republik Indonesia
CLUSTER II (MALUKU)
Rencana Pembangkit 875 MW
Kebutuhan Gas 130 MMSCFD
Kebutuhan Gas Smelter 100 MMSCFD
Pembangkit 24 LocationFSRU/FSU/FRU 3 LocationLand Based Regas 5 LocationIso Tank Regas System 10 Location
Primary Hub Maba
Primary Hub AmbonPembangkit : 9 Plant (200 MW)Gas Demand : 32 MMSCFDIsotank : 255 EA / 2 weeks
Primary Hub MabaPembangkit : 12 (225 MW)Gas Demand : 147 MMSCFDSmelter : 1 Plant (100 MMSCFD)Isotank : 198 EA / 2 weeks
Primary Hub ManadoPembangkit : 3 (450 MW)Gas Demand : 46 MMSCFDIsotank : N/A
LNG Vessel : 8000 m3
Frequency : 1 x 2 weeksTravel : 580 km
Primary Hub Manado
LNG Vessel : 8000 m3
Frequency : 1 x 2 weeksTravel : 1, 000km
Primary Hub Ambon
Liquefaction Plant
Secondary Hub/Land based Storage
Smelter
FSRU
PLTGU/MGU
PLTG/MG
MPP
Land based Regas Terminal
LNG Iso tank Regas System
Small Vessel Route
Isotank Barge Route
1414
Kementerian ESDM Republik Indonesia
CLUSTER III (NUSA TENGGARA)
Pembangkit 30 LocationFSRU/FSU/FRU 4 LocationLand Based Regas 12 LocationIso Tank Regas System 7 Location
Rencana Pembangkit 1,750 MW
Kebutuhan Gas 183 MMSCFD
Kebutuhan Gas Smelter 100 MMSCFD
Primary Hub Makassar
Primary Hub Lombok
Primary Hub Pomala
Primary Hub Kupang
Primary Hub MakassarPembangkit : 2 (900 MW)Gas Demand : 36 MMSCFDIsotank : N/A
Primary Hub KupangPembangkit : 10 (215 MW)Gas Demand : 34 MMSCFDIsotank : 162 Iso/ 2 weeks
Primary Hub PomalaPembangkit : 8 (145 MW)Gas Demand : 34 MMSCFDSmelter : 1 Plant (100 MMSCFD)Isotank : 126 Iso/ 2 weeks
Primary Hub LombokPembangkit : 10 (490 MW)Gas Demand : 79.5 MMSCFDIsotank : N/A
LNG Vessel : 8000 m3
Frequency : 2 x 2 weeksTravel : 620 km
LNG Vessel : 8000 m3
Frequency : 2 x 2 weeksTravel : 750 km
LNG Vessel : 8000 m3
Frequency : 4 x 2 weeksTravel : 1,400 km
Liquefaction Plant
Secondary Hub/Land based Storage
Smelter
FSRU
PLTGU/MGU
PLTG/MG
MPP
Land based Regas Terminal
LNG Iso tank Regas System
Small Vessel Route
Isotank Barge Route
1515
Kementerian ESDM Republik Indonesia
CLUSTER IV (NATUNA)
Pembangkit 5 LocationFSRU/FSU/FRU 1 LocationLand Based Regas 1 LocationIso Tank Regas System - Location
Rencana Pembangkit 495 MW
Kebutuhan Gas 49 MMSCFD
Primary Hub PontianakPembangkit : 5 (495 MW)Gas Demand : 49 MMSCFD
Primary Hub Pontianak
LNG Vessel : 8000 m3
Frequency : 1 x 2 weeksTravel : 475 km
Liquefaction Plant
Secondary Hub/Land based Storage
Smelter
FSRU
PLTGU/MGU
PLTG/MG
MPP
Land based Regas Terminal
LNG Iso tank Regas System
Small Vessel Route
Isotank Barge Route
1616
Kementerian ESDM Republik Indonesia16
Existing Ports in Indonesia
Commercial Ports 112
Non-Commercial Ports 1,129
Special Purpose Terminals 1,045
Total 2,289
LNG Fueled ShipBased on Indonesian Regulation* (referring to Marine Safety Committee 95,
International Marine Organization):
Sulphur Content for marine fuel must not exceed 3,5% m/m** before
January 1st 2020 and 0,5% m/m after January 1st 2020
Commercial Ports
Commercial Shipping Route
Pioneer Shipping Route
*) Transportation Ministerial Regulation No. 29 / 2014 about Maritime Environment Pollution Prevention
**) m/m: microgram/mililiter
Existing Ships in Indonesia
Passenger Ship 535
Cargo Ship 20,346
Fishing Ship 16,028
Total 36,909
LNG for Marine Potential
LNG for Marine Transportation
1717
Kementerian ESDM Republik Indonesia
GAS INFRASTRUCTURE ROAD