Indonesia DC500kV Schedule(2015.03.30)

1
Indonesia PLN JAVA - SUMATRA Interconnection Transmission Line Project, JICA ODA LOAN NO. IP-556 Package 3 500kV DC Overhead Transmission Line Schedule 2015/3/30 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 T-01 AdbLM AG(Osaka) mid/04/2015 AG-VINA end/06/2015 Tower Load Test (+3mB.E. +3mL.E.) T-02 AdbLM/s AG&SCIMT mid/05/2015 AG-VINA mid/08/2015 T-03 AdbLM/e AG&SCIMT end/05/2015 AG-VINA end/09/2015 T-04 AdbLM/e/s AG&SCIMT end/06/2015 AG-VINA mid/11/2015 T-05 AdbHV AG&SCIMT early/06/2015 AG-VINA end/12/2015 T-06 AdbHV/s AG&SCIMT early/07/2015 AG-VINA mid/02/2016 T-07 BdbLM AG(Osaka) end/05/2015 AG&SCIMT end/07/2015 Tower Load Test (+3mB.E. +3mL.E.) T-08 BdbLM/e AG(Osaka) mid/07/2015 AG(Okayama) end/09/2015 T-09 BdbHy AG(Osaka) mid/08/2015 AG&SCIMT end/09/2015 T-10 BdbVh AG(Osaka) end/09/2015 AG(Okayama) end/11/2015 T-11 CdbLM T-12 CdbLM/e T-13 CdbHy T-14 CdbVh T-15 CdbHy/s T-16 DdbLM T-17 DdbLM/e T-18 DdbHy T-19 DdbVh T-20 EdbLM T-21 EdbLM/e T-22 EdbHy T-23 EdbVh T-24 FdbLM/e T-25 FdbVh T-26 AdbHV/s T-27 SerLt T-28 TerLt T-29 RerLt Oct./2017 - Mar./2018 Finish Other Apr./2015 - Sep./2015 Oct./2015 - Mar./2016 Apr./2016 - Sep./2016 Oct./2016 - Mar./2017 Apr./2017 - Sep./2017 No. Type Basic Design Finish Shop DWG. Basic Design (AG,Osaka) Shop DWG.AGVINABasic DesignAG&SCIMTShop DWG.AG&SCIMTShop DWG.(AG,Okayama) for Tower Load for Tower Load

description

Indonesia DC500kV

Transcript of Indonesia DC500kV Schedule(2015.03.30)

  • Indonesia PLN JAVA - SUMATRA Interconnection Transmission Line Project, JICA ODA LOAN NO. IP-556Package 3 500kV DC Overhead Transmission LineSchedule 2015/3/30

    4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3

    T-01 AdbLM AG(Osaka) mid/04/2015 AG-VINA end/06/2015 Tower Load Test(+3mB.E. +3mL.E.)

    T-02 AdbLM/s AG&SCIMT mid/05/2015 AG-VINA mid/08/2015

    T-03 AdbLM/e AG&SCIMT end/05/2015 AG-VINA end/09/2015

    T-04 AdbLM/e/s AG&SCIMT end/06/2015 AG-VINA mid/11/2015

    T-05 AdbHV AG&SCIMT early/06/2015 AG-VINA end/12/2015

    T-06 AdbHV/s AG&SCIMT early/07/2015 AG-VINA mid/02/2016

    T-07 BdbLM AG(Osaka) end/05/2015 AG&SCIMT end/07/2015 Tower Load Test(+3mB.E. +3mL.E.)

    T-08 BdbLM/e AG(Osaka) mid/07/2015 AG(Okayama) end/09/2015

    T-09 BdbHy AG(Osaka) mid/08/2015 AG&SCIMT end/09/2015

    T-10 BdbVh AG(Osaka) end/09/2015 AG(Okayama) end/11/2015

    T-11 CdbLM

    T-12 CdbLM/e

    T-13 CdbHy

    T-14 CdbVh

    T-15 CdbHy/s

    T-16 DdbLM

    T-17 DdbLM/e

    T-18 DdbHy

    T-19 DdbVh

    T-20 EdbLM

    T-21 EdbLM/e

    T-22 EdbHy

    T-23 EdbVh

    T-24 FdbLM/e

    T-25 FdbVh

    T-26 AdbHV/s

    T-27 SerLt

    T-28 TerLt

    T-29 RerLt

    Oct./2017 - Mar./2018Finish Other

    Apr./2015 - Sep./2015 Oct./2015 - Mar./2016 Apr./2016 - Sep./2016 Oct./2016 - Mar./2017 Apr./2017 - Sep./2017No. Type Basic Design Finish Shop DWG.

    Basic Design(AG,Osaka) ShopDWG.AGVINABasic DesignAG&SCIMT ShopDWG.AG&SCIMT ShopDWG.(AG,Okayama)

    for TowerLoad