Indian Reservation RoadBridge Program
23 CFR 661
IRRCC MeetingFebruary 22, 2006Tulsa, Oklahoma
This Presentation will cover:
Status of IRRBP Projects Funding
Update to the 23 CFR 661
IRRBP Regulations
IRRBP Projects Funded in FY 05 45 bridge projects funded:
17 BIA owned projects 28 Non-BIA owned projects
$22.8 million used $19 million TEA-21 bridge funds $3.8 million of FY 05 STEA funds
$9.2 million rolled back to the IRR Program
SAFETEA-LU FY05 IRRBP Funding
$14,000,000/yr per SAFETEA-LU Net $11,970,000
(lost $2,030,000 due to 14.5% ob limit)
carried over into FY 06
FY 06 IRRBP Projects(as of 2/15/06)
20 bridge projects funded: 4 BIA owned projects 16 Non-BIA owned projects
$10.1 million used FY05 Carryover Funds
$1.87 million remaining
Status of IRRBP Funding in FY 06
$14 million for FY 06 Net $12.06 million after Ob limit and
rescission $1.87 million remaining from FY 05
carryover
Total available = $13.93 million
Changes to IRRBP Result from SAFETEA-LU
$14,000,000 for FY05 through FY09 Use to carry out planning, design,
engineering, preconstruction, construction, and inspection of projects
Bridges must be structurally deficient or functionally obsolete
Funds for design based on availability Funds for construction and inspection after
PS&E approval.
Update to the 23 CFR 661 – IRRBP Regulations:
Issues
How to handle Preliminary Engineering? Should the 80% - 20% split for BIA and non-BIA
owned bridges be kept? Is 1st come - 1st served basis working? Should there be a funding ceiling for design and
construction?
Annual IRRBP Funding
$14 million (before takedown)
Preliminary Engineering
(10%)
Construction (90%)
Up to 80% for BIA bridges
Not less than 20% for Non-BIA
Up to 80% for BIA bridges
Not less than 20% for Non-BIA
Deadline by May 1st then funds would be available to Non-BIA
projects
Flexible use of funds after May
1st
Deadline by May 1st then funds would be
available to BIA projects
Deadline by May 1st then funds would be available to Non-BIA
projects
Flexibile use of funds after May
1st
Deadline by May 1st then funds would be
available to BIA projects
Not to exceed $100,000 for each
project
Not to exceed $100,000 for each
project
100% funding for BIA bridges
$1 million project limit
Minimum 20% Match Req'd
Minimum 20% Match Req'd
Preliminary Engineering
(10%)
Up to 80% for BIA bridges
Not less than 20% for Non-BIA
Deadline by May 1st then funds would be available to Non-BIA
projects
Flexible use of funds after May
1st
Deadline by May 1st then funds would be
available to BIA projects
Not to exceed $100,000 for each
project
Not to exceed $100,000 for each
project
Minimum 20% Match Req'd
FY 06 IRRBP FUNDING FOR DESIGN
FY 06 IRRBP FUNDING FOR CONSTRUCTION
Construction (90%)
Up to 80% for BIA bridges
Not less than 20% for Non-BIA
Deadline by May 1st then funds would be available to Non-BIA
projects
Flexibile use of funds after May
1st
Deadline by May 1st then funds would be
available to BIA projects
100% funding for BIA bridges
$1 million project limit
Minimum 20% Match Req'd
Update to the 23 CFR 661 – IRRBP Regulations:
What’s new? Definitions – PE, PS&E, Approach roadway Eligibility Criteria Contents for an application for PE
What’s Next? Looking for comments/recommendations from
BIA and IRRCC. (Due by March 10)
Update to the 23 CFR 661 IRRBP Regulations:
Then What? Review comments, prepare Interim Final
Regulation, and provide to IRR Coordinating Committee
Publish Interim Final and request public comments
Review comments and prepare Final Regulation Publish Final Regulation
QUESTIONS?
Russell Garcia, P.E.IRR Program EngineerFederal Lands Highway
Washington D.C.(202) 366-9815