    o 'uel 0il Systems

    o &atural Bas Systems

    o 0ther 3describe4

    • Describe level and type of design experience and responsibilities in various

    types of edical Bas Systems * "+uipment including but not limited to:o edical air, vacuum, oxygen

    o 7aste nesthesia Bas Disposal 37BD4

    o Specialty Bases

    o Storage systems, alarm and peripherals 3booms, hoses, etc)4

    o 0ther 3describe4

    • Describe level and type of design experience and responsibilities in varioustypes of specialty design areas/systems including but not limited to:

    o >aboratory systems

    o 6itchen systems

    I have designed kitchen ventilation system using various methods suchas -H, or updraft factor or heat dissipation) Selecting scrubbers, airbalancing to maintain negative pressure,

    o -lean !oomo 0ther 3describe4

    • Describe the level and type of experience and responsibilities in the following

    areas of proCect design and proCect management, as applicable:o -onceptual design 3including examples of innovative ideas that may

    have been implemented/incorporated4)I am pro9cient in draft design basis report, make schemes for design ,space planning for e+uipment, concept energy modelling-ondensate recovery(rimary pumping systemBeothermal energy!adiant cooling

    o >eading or managing a proCect discipline design team 3i)e) mechanical

    engineering team4, including a discussion of challenges, successes andopportunities for improvement)I did manage design team when I was with umbai airport wherein Iused to get design schedule) y greatest challenge was to designcondensate recovery system wherein there was di@erence in opinionfrom my consultant during value engineering) I had to convenience himby doing calculation and bringing together cooling tower and chillervendors carry out the analysis and get it cleared)

     5he success I could see when 9nally it got implemented and validated 5here is always opportunites for improvement for me comes withlearning experience and lesson learned in any other proCect)I did

    o >eading or managing a proCect 3as proCect manager4, including a