INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri...

25

Transcript of INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri...

Page 1: INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered
Page 2: INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered

INDEX

S. NO. PARTICULARS1.0 EXECUTIVE SUMMARY2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATIONi IDENTIFICATION OF PROJECT AND PROJECT PROPONENTii BRIEF DESCRIPTION OF THE NATURE OF PROJECTiii NEED FOR THE PROJECT & ITS IMPORTANCE TO THE COUNTRY/ REGIONiv DEMAND – SUPPLY GAPv IMPORTS VS. INDIGENOUS PRODUCTIONvi EXPORT POSSIBILITYvii DOMESTIC/EXPORT MARKETSviii EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT3.0 PROJECT DESCRIPTIONI TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT PROJECTS, IFANYII LOCATION (MAP SHOWING GENERAL LOCATION, SPECIFIC LOCATION, ANDPROJECT BOUNDARY & PROJECT SITE LAYOUT) WITH COORDINATESIII DETAILS OF ALTERNATIVE SITE CONSIDEREDIV SIZE AND MAGNITUDE OF OPERATIONV PROJECT DESCRIPTION WITH PROCESS DETAIL4.0 SITE ANALYSIS5.0 PLANNING BRIEF6.0 PROPOSED INFRASTRUCTURE7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN8.0 PROJECT SCHEDULE & COST ESTIMATES9.0 ANALYSIS OF PROPOSAL

Page 3: INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered

Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha Near Village: Chak 27-28 BLD, Tehsil: Khajuwala,District: Bikaner (Rajasthan)

Pre-Feasibility Report

Shri Ratan Lal Godara S/o Shri Hira Ram Godara 1

PRE – FEASIBILITY REPORT

1.0 EXECUTIVE SUMMARY

This is a new Gypsum Mining Project (M.L. No. 39/2013, Area: 4.7250 ha) for mineral Gypsum

with production capacity-90,000 TPA Near Village: Chak 27-28 BLD, Tehsil: Khajuwala,

District: Bikaner (Rajasthan). LOI was issued in favor of Shri Ratan Lal Godara S/o Shri Hira

Ram Godara dated 24.11.2014 followed by letter dated o8.05.2015. Extension of LOI issued

vide letter number DMG/BIKA/CC-3/P.1 (1)39/2013/1765 dated 17.06.2015 (Copy of the same

annexed as Annexure-I) Mining Plan with progressive Mine Closure Plan has been approved

by Superintending Mining Engineer Mines & Geology Dept. Bikaner, vide letter no.

SME/BKN/CC-II/ M.P/M.L-39/13/3944 dated 24.06.2015. (Copy enclosed as Annexure-II)

Table-1

Salient features of the Project

S. No. Particulars Details

A. Mining Lease Details

1. Name of the Project Gypsum Mining Project

2. Mineral Gypsum

3. Mining Lease Number M.L. No. 39/2013

4. Mining Lease Area Area 4.725 ha

5. Lease Holder (Proposed) Shri Ratan Lal Godara S/o Shri Hira Ram Godara

6. Lease Validity 30 Years

B Location

7. Village Chak 27-28 BLD

8. Tehsil Khajuwala

9. District Bikaner

10. State Rajasthan

11. Latitude & Longitude Geographical Extents:

Latitude- 28°24'5. 84"N to 28°24'12.82"N

Longitude- 72°24'5.4"E to 72°24'13.82"E

Page 4: INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered

Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha Near Village: Chak 27-28 BLD, Tehsil: Khajuwala,District: Bikaner (Rajasthan)

Pre-Feasibility Report

Shri Ratan Lal Godara S/o Shri Hira Ram Godara 2

S. No. Particulars Details

12. Toposheet No. 44D/04

C. Other Details

13. Cost of the project Rs. 10.0 Lacs

14. Cost for Environmental

Protection Measures

Rs. 0.50 lac

15. Cost of Plantation Rs. 0.20 lacs

16. ESR/ CSR Cost Rs. 0.50 lacs per annum

17. Cost for Laboures Rs. 0.60 lacs per annum

18. Seismic Zone II

2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION

(i) Identification of Project and Project Proponent

Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered

office at R/O D-7 Antodya Nagar, District- Bikaner (Rajasthan).

(ii) Brief Description of the Nature of Project

This is a new mining project & will be done by semi mechanized open cast method. As per

amendment in EIA Notification dated 15.01.2016, the project is falling under Cat. A {as the

said mining project is nearby to one MLA > 50 ha i.e. 1000 ha (Environmental clearance for

the project has already been granted) and to be dealt at the level of MoEFCC, New Delhi}.

(iii) Need for the Project & Its Importance to the Country/ Region

Gypsum will be used for manufacturing of Plaster Of Paris for captive use.

(iv) Demand – Supply Gap

Gypsum will be used for manufacturing of Plaster Of Paris for captive use.

(v) Imports vs. Indigenous Production

Gypsum produced in the proposed mine will be used only for Plaster of Paris

Manufacturing factories owned by lessee.

(vi) Export Possibility

There is no export possibility as this mine will be captive to the Plaster Of Paris

manufacturing factories owned by lessee.

Page 5: INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered

Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha Near Village: Chak 27-28 BLD, Tehsil: Khajuwala,District: Bikaner (Rajasthan)

Pre-Feasibility Report

Shri Ratan Lal Godara S/o Shri Hira Ram Godara 3

(vii) Domestic/Export Markets

Gypsum produced in the proposed mine will be used only for Plaster of Paris

Manufacturing factories owned by lessee.

(viii)Employment Generation (Direct and Indirect) due to the Project

Approx. 07 skilled, semiskilled and unskilled manpower will be employed required in the

mine.

2.0 PROJECT DESCRIPTION

(i) Type of Project Including Interlinked And Independent Projects, If Any

Shri Ratan Lal Godara S/o Shri Hira Ram Godara has a Gypsum Mining Project, M.L.

No. 39/2013, Area 4.725 ha Near Village: Chak 27-28 BLD, Tehsil: Khajuwala, District:

Bikaner (Rajasthan).

Interlinked Project: -No Interlinked Project is there.

(ii) Location (map showing general location, specific location, and project boundary &

project site layout) with coordinates

Page 6: INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered

Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha Near Village: Chak 27-28 BLD, Tehsil: Khajuwala,District: Bikaner (Rajasthan)

Pre-Feasibility Report

Shri Ratan Lal Godara S/o Shri Hira Ram Godara 4

Figure1: Location Map

Page 7: INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered

Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha Near Village: Chak 27-28 BLD, Tehsil: Khajuwala,District: Bikaner (Rajasthan)

Pre-Feasibility Report

Shri Ratan Lal Godara S/o Shri Hira Ram Godara 5

(iii) Details of Alternate Sites Considered

No alternative site has been taken into consideration due to availability of mineral

resources in the area.

(iv) Size and magnitude of operation

Production of Gypsum (Production Capacity- 90,090 TPA) from this mine is proposed

and the mining will be done by opencast semi mechanized method by using earth

movers like JCB.

(v) Project Description with Process Detail

(1) Salient features along with project vicinity details of the Mining project is

given below:

Table - 2

Salient Features of the Project

S. No. Particulars Details

1. Name of the Project Gypsum Mining Project

2. Mineral Gypsum

3. Mining Lease Number M.L. No. 39/2013

4. Mining Lease Area Area 4.725 ha

5. Lease Holder (Proposed) Shri Ratan Lal Godara S/o Shri Hira Ram Godara

6. Lease Period 30 years

7. Geological reserve 415800 tonnes

8. Mineable reserve 360360 Tonnes

9. Life of Mine 4 years

10. Elevation Range in the area 100 AMSL -102 AMSL

11. General ground level 100 AMSL

12. Ground Water table 70 m bgl

13. Ultimate Working Depth 4.5 meter from surface level

Mining will not intersect ground water table

Source- Approved Modified Mining Plan with progressive mine closure plan.

(2) GEOLOGY OF THE AREA –

Gypsum in this region found in three formations-

1. Pleistocene to recent formation- Desert gypsum (Gypsite) in sand alluvium.

2. Vindhyan sand stone formation- Interbedded bands and beds of rock gypsum.

Page 8: INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered

Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha Near Village: Chak 27-28 BLD, Tehsil: Khajuwala,District: Bikaner (Rajasthan)

Pre-Feasibility Report

Shri Ratan Lal Godara S/o Shri Hira Ram Godara 6

3. Post Delhi deposits- Selenite crystalline deposits in various salts lakes of western rajasthan.

Regional Geology

Age Formation Rock type

Recent Quarternary

Sediments

Sands and sandy alluvium calcareous

Grit, kankar amd semi consolidated

Conglomerate and selenite.

Pleistocene Bap Boulders

and

lambariyan

Diamictite

Associate pebbles, cobbles, boulders and

erratices of granite, quartzite.rhyolite and

dolomite.

ESTIMATION OF RESERVES

Proved 311850 tonnesProbable 103950 tonnesMineable Reserves 360360 tonnes

(3) Method of Mining

The mining will be done by opencast semi mechanized method by using earth movers

like JCB. The overburden and mineral will be excavated with the help of JCB. The

mineral Gypsum is overlain by sand dunes so far the exploitation of mineral there is

requirement of removal of the over burden and stack sand cover separately at the

appropriate location. Since the deposit occurs at a depth of 0.10-0.50 cm and the

thickness of the deposit is sufficient to be economically mineable. The height of the

bench will be kept 4.0 meters in mineral. Overburden will be removed and

transportation of Gypsum from mining pit to trucks and dumpers. Drilling and blasting

will not be required.

Table-3 EXTENT OF MECHANIZATION

S.No. Machinery Number

1. JCB 1

2. Tractor 2 (on hare basis)

3. Dumper 2 (on hire basis)

Source: Approved Modified Mining Plan with Progressive Mine Closure Plan

5. PROPOSED YEAR WISE PRODUCTION DETAILS OF THE NEXT YEARS

Page 9: INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered

Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha Near Village: Chak 27-28 BLD, Tehsil: Khajuwala,District: Bikaner (Rajasthan)

Pre-Feasibility Report

Shri Ratan Lal Godara S/o Shri Hira Ram Godara 7

The proposed Year-wise production plan for next years is mentioned in the table given

below:

Table – 4

Year Wise Production for Modified Mining Plan with Progressive Mine Closure Plan

Year Gypsum (Tonnes)

1st Year 90090

2nd Year 90090

3rd Year 90090

4th Year 90090

Total 360360

Source: Approved Modified Mining Plan with Progressive Mine Closure Plan

6. WASTE GENERATION & DISPOSAL

Around 8190 cu.m of overburden will be generated during mining operation.

Table – 5

Year Wise Waste Generation of Modified Mining Plan with Progressive Mine Closure Plan

Year Waste in Cum

I 8190

II -

III -

IV -

Total 8190

Source: Approved Modified Mining Plan with Progressive Mine Closure Plan

7. CONCEPTUAL PLAN

At the end of life of mine, 4.0950 ha. area will be excavated, out of which 4.0950 ha will be

backfilled & used for agriculture purpose, 0.0025 ha area will be under infrastructure and 0.6275

ha area will be covered under green belt on around the lease periphery.

Page 10: INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered

Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha Near Village: Chak 27-28 BLD, Tehsil: Khajuwala,District: Bikaner (Rajasthan)

Pre-Feasibility Report

Shri Ratan Lal Godara S/o Shri Hira Ram Godara 8

Table No.:6

Post Mining Plan (Conceptual) Land Pattern of ML Area (Ha.)

S. No. Description

Land Use (In ha)

PlantationWater

Body

Public

UseUndisturbed Total

1. Top Soil Dump - - - - -

2.External Waste Dump - - - - -

3. (a) Excavation (Voids) - - - -

(b) Excavation (Backfilling)* - - 4.0950 - 4.0950

4. Road - - - - -

5. Built Up Area - - 0.0025 - 0.0025

6. Township Area - - - - -

7. Afforestation 0.6275 - - 0.6275

8. Mineral Storage - - - - -

9. Undisturbed Area - - -

Total 0.6275 - 4.0975 - 4.725

*At the end of life of mine 4.0950 ha of excavated area will be backfilled & developed as fertile land for

agriculture purpose.

(vi) Raw Material Required Along With Estimated Quantity, Likely Source, Marketing Area of

Final Products, Mode of Transport of Raw Material and Finished Product.

This is a Gypsum Mining Project. No raw material will be required to dependent industries.

(vii) Resources Optimization/ Recycling and Reuse Envisaged in the Project, if any, should be

briefly Outlined

No waste water will be generated from mining operation.

Domestic sewage water generated from office toilet will be disposed in soak pits via

septic tank.

(viii) Availability of Water Its Source, Energy /Power Requirement and Source

A. Water requirement:

Total Water requirement estimated will be about 3 KLD for spraying and domestic

uses and will be sourced from nearby villages.

Page 11: INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered

Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha Near Village: Chak 27-28 BLD, Tehsil: Khajuwala,District: Bikaner (Rajasthan)

Pre-Feasibility Report

Shri Ratan Lal Godara S/o Shri Hira Ram Godara 9

B. Power requirement:

No electrical energy will be required since mine will be operated in one shift only.

(ix) Quantity of Waste to Be Generated (Liquid and Solid) And Scheme for Their

Management/Disposal:

Around 8190 cu.m of overburden will be generated during mining operation. After

removal of mineral the land will be used for agriculture purpose.

3.0 SITE ANALYSIS

(i) Connectivity

The lease area about 98.0 km away from the Bikaner district in SE Direction from mine

site. Nearest Town is Khajuwala ~38 km from mine site in NE direction, nearest railway

station is Bikaner Railway Station at a distance of ~98.0 km in SE direction from Mine

site and nearest airport is Jodhpur Airport, Jodhpur at a distance of ~247 Km in SSE

direction. The lease area is well connected through roads.

(ii) Land Form, Land Use and Land Ownership

Existing Land Use Pattern

The total ML area of 4.725 ha comprises of Private Waste Land (Under possession of

lessee)

(iii) Topography

The lease area is showing almost flat topography. The general slope of the area is

towards south west direction. The elevation of the lease area ranges from 100 AMSL

to 102 AMSL.

Existing Land Use Pattern {Agriculture, Non-Agriculture, Forest, Water Bodies

(Including Area Under CRZ)}, Shortest Distances From The Periphery Of The Project

To Periphery Of The Forests, National Park, Wild Life Sanctuary, Eco Sensitive Areas,

Water Bodies (Distance From The HFL Of The River), CRZ. In Case Of Notified

Industrial Area, A Copy Of The Gazette Notification.

Table – 7

Environmental Settings

S. No. Particular Details

1. Nearest Village Chak 27-28 BLD is ~ 1.0 km in NE direction

2. Nearest city/ town Khajuwala ~38 km from mine site in NE direction.

Page 12: INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered

Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha Near Village: Chak 27-28 BLD, Tehsil: Khajuwala,District: Bikaner (Rajasthan)

Pre-Feasibility Report

Shri Ratan Lal Godara S/o Shri Hira Ram Godara 10

3.Nearest Railway Station Bikaner Railway Station at a distance of ~98.0 km in SE

direction from Mine site

4.Nearest Airport Jodhpur Airport, Jodhpur at a distance of ~247 Km in SSE

direction

5. Archaeological Important Place None, within 10 km radius area of mine site.

6. Ecological Sensitive Areas

(National Park, Wildlife Sanctuary,

Biosphere Reserve etc.)

There is no National Park, Wild Life Sanctuaries, Biosphere

Reserves, Tiger Reserves, Wildlife Corridors, etc. within 10

km radius

9. Reserved/Protected Forest within

10 km radius

None, within 10 km radius area of mine site.

10. Nearest River / water body None, within 10 km radius area of mine site.

Source: SOI Toposheet

Page 13: INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered

Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha at Village: Chak 27-28 BLD, Tehsil: Khajuwala, District: Bikaner (Rajasthan)Pre-Feasibility Report

Shri Ratan Lal Godara S/o Shri Hira Ram Godara 11

Figure 2: Key plan

Page 14: INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered

Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha at Village: Chak 27-28 BLD, Tehsil: Pugal,District: Bikaner (Rajasthan)

Pre-Feasibility Report

Shri Ratan Lal Godara S/o Shri Hira Ram Godara 12

(iv) Existing Infrastructure:

There is a small mine office cum rest shelter is available at site and some

vegetations existing in the lease area which will be cleared when required. Total

lease area is Private Waste land.

4.0 PLANNING BRIEF

(i) Planning Concept (Type of Industries, Facilities, and Transportation etc.) Town

and Country Planning/Development Authority Classification

This is an Open Cast semi-mechanized mining Project

(ii) Population Projection

07 Manpower required will be engaged from nearby areas. No significant influx

of people is anticipated in the area.

(iii) Land Use Planning

The proposed mining lease area is 4.725 ha. The area comprises of Private waste

land.

LAND: STAGE WISE LAND USE AND RECLAMATION AREA (in Ha.)

S. No. Land use Category Present 4th YearEnd of life of

mine

1 Top Soil Dump - - -

2 Waste Dump (External) - - -

3 Excavation (Voids Only) - - -

4 Road - -

5 Built up Area - 0.0025 0.0025

6 Township Area - - -

7 Afforestation - 0.6275 0.6275

8 Reclamation (Backfilled)* - 4.0950 4.0950

9 Mineral stack - _ -

10 Processing (Crushing) - - -

11 Undisturbed Area 4.725 _

Total 4.725 4.725 4.725

*At the end of life of mine 4.0950 ha of excavated area will be backfilled & developed as fertile

land for agriculture purpose,

Page 15: INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered

Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha at Village: Chak 27-28 BLD, Tehsil: Pugal,District: Bikaner (Rajasthan)

Pre-Feasibility Report

Shri Ratan Lal Godara S/o Shri Hira Ram Godara 13

(iv) Assessment of Infrastructure Demand (Physical & Social)

Lessee will assess the demand of infrastructure (Physical & Social) in nearby

area of the proposed mine site and same will be developed under social work.

(v) Amenities/Facilities

Lessee will develop the Amenities/Facilities in the nearby area of the proposed

mine site as per requirement of local people of the nearby area under corporate

social responsibility programs.

5.0 PROPOSED INFRASTRUCTURE

(i) Residential Area (Non Processing Area)

This is not required as mine workers will come from nearby villages. Rest shelter

to the workers already exists in the major mining lease of the lessee.

(ii) Green Belt

Green belt will be developed on the periphery of the lease area as well as

outside of the lease area equal to 33% of the lease area.

(iii) Connectivity

The lease area about ~98.0 km away from the Bikaner district in SE Direction

from mine site. Nearest city is Khajuwala ~38 km from mine site in NE direction,

nearest railway station is Bikaner Railway Station at a distance of ~98.0 km in SE

direction from Mine site and nearest airport is Jodhpur Airport, Jodhpur at a

distance of ~247 Km in SSE direction. The lease area is well connected through

roads.

(iv) Water Management (Source & Supply of water)

Total Water requirement estimated is about 3 KLD for spraying and domestic

uses and will be sourced from nearby villages.

(v) Sewerage System

Domestic sewage water generated from office toilet will be disposed in soak

pits via septic tank. Outside discharge is not envisaged.

(vi) Industrial Waste Management

No industrial waste water will be generated from this mining operation.

Page 16: INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered

Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha at Village: Chak 27-28 BLD, Tehsil: Pugal,District: Bikaner (Rajasthan)

Pre-Feasibility Report

Shri Ratan Lal Godara S/o Shri Hira Ram Godara 14

(vii) Solid Waste Management

Around 8190 cu.m of overburden will be generated during mining operation.After removal of mineral the land will be used for agriculture purpose.

(viii) Power Requirement & Supply/Source

No electrical energy will be required since mine will be operated in one shift only.

6.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN

(i) Policy To Be Adopted (Central/State) In Respect Of The Project Affected

Persons Including Home Ousters, Land Ousters And Landless Laborers (Brief

Outline To Be Given).

Not Applicable as the lease area falls in Private waste land and there is no

habitation in the area.

7.0 PROJECT SCHEDULE & COST ESTIMATES

(i) Likely Date Of Start Of Construction And Likely Date Of Completion (Time

Schedule For The Project To Be Given)

The mining activity will be started after obtaining statutory clearances/consents

from respective authority.

(ii) Estimated Project Cost Along With Analysis In Terms Of Economic Viability of

the Project

Cost of the project Rs. 10.0 Lacs

Cost for Environmental Protection

Measures

Rs.0.50 lacs

ESR/ CSR Cost Rs. 0.60 lacs per annum

Cost for Laboures Rs. 0.50 lacs per annum

8.0 ANALYSIS OF PROPOSAL

Gypsum Mining Project will result in growth of the surrounding areas by increasing

direct and indirect employment opportunities in the region including ancillary

development and supporting infrastructure. Special emphasis on Financial and

Social benefits will be given to the local people including tribal population, if any, in

the area.

Development of social amenities will be in the form of medical facilities, and

providing books and school uniforms to the poor students of nearby schools.

Page 17: INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered

Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha at Village: Chak 27-28 BLD, Tehsil: Pugal,District: Bikaner (Rajasthan)

Pre-Feasibility Report

Shri Ratan Lal Godara S/o Shri Hira Ram Godara 15

No major adverse effect on environment is envisaged as the required mitigation

measures are inbuilt in the project.

9.0 ENVIRONMENTAL MANAGEMENT PLAN

9.1.1 AIR POLLUTION CONTROL MEASURES

Green belt will be developed on the periphery of the lease area.

Periodical water spraying on the haul roads will be done.

9.1.2 WATER MANAGEMENT

No waste water will be generated during the mining activities.

The rain water collected in mining pit will be used for plantation, dust

suppression requirements.

9.1.3 NOISE POLLUTION CONTROL MEASURES

Proper maintenance of all machines will be carried out which will reduce noise

generation during operations.

Workers will be exposed to high noise levels provided with ear muffs/plugs &

will be persuaded to use the same.

Adequate silencers will be provided in all the diesel engines.

Green belt will be developed around the lease boundary to minimize noise

propagation.

Periodic noise level monitoring will be done.

9.1.4 LAND RECLAMATION

Total mining lease area is 4.725 hectares.

At the end of End of the life of mine, total excavated area will be used as fertile

land for agricultural purpose.

9.1.5 SOLID WASTE MANAGEMENT

Around 8190 cu.m of overburden will be generated during mining operation. Afterremoval of mineral the land will be used for agriculture purpose.

9.1.6 GREEN BELT DEVELOPMENT

At the end of life of mine 0.6275 ha area will be covered under green belt on

around the lease periphery.

Local species will be preferred for plantation.

Page 18: INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered

Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha at Village: Chak 27-28 BLD, Tehsil: Pugal,District: Bikaner (Rajasthan)

Pre-Feasibility Report

Shri Ratan Lal Godara S/o Shri Hira Ram Godara 16

Tree guards will be provided for protection from animals.

Green belt will be developed on the periphery of the lease area and outside the

lease area equal to 33% of the lease area.

Page 19: INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered
Page 20: INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered
Page 21: INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered
Page 22: INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered
Page 23: INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered
Page 24: INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered
Page 25: INDEX [environmentclearance.nic.in]environmentclearance.nic.in/writereaddata/Online/... · Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered