![Page 1: Incremental Power Generation > for Simple Cycle Gas ...quest-lb.com/admin/all/uploads/1434452889-Turbine Inlet Air Cooling Systems (TIAC) .pdfTURBINE INLET AIR COOLING (TIAC) Incremental](https://reader033.fdocuments.net/reader033/viewer/2022041714/5e49dbf38915305b55586cdf/html5/thumbnails/1.jpg)
TURBINE INLET AIR COOLING (TIAC)
Incremental Power Generation > for Simple Cycle Gas turbinesOr> for Combined Cycle Power plants
6/4/2015 1
![Page 2: Incremental Power Generation > for Simple Cycle Gas ...quest-lb.com/admin/all/uploads/1434452889-Turbine Inlet Air Cooling Systems (TIAC) .pdfTURBINE INLET AIR COOLING (TIAC) Incremental](https://reader033.fdocuments.net/reader033/viewer/2022041714/5e49dbf38915305b55586cdf/html5/thumbnails/2.jpg)
Executive Summary• At peak Demand in summer, combustion turbine output is reduced by up
to 25%, removing vital capacity when it is most needed
• We Propose to construct and manage a Turbine Inlet Cooling Project (TIAC) for Power plant. The chillers would utilise waste exhaust gas/a steam from the turbines to cool the inlet air and so enable the turbines to operate at ISO capacity even during hot summer days and nights, 24/7.
Benefits of the Project:
Substantial Combined Cycle Output Increase up to 23% at 46⁰C
Turbine Life Extension through low inlet air temperature
Lower O&M and less spare parts.
Power Plant Capacity Enhancement and Base Load Improvement.
CAPEX Savings up to 67%, O&M Savings up to 86% versus the purchase of a new Turbine.
6/4/2015 2
![Page 3: Incremental Power Generation > for Simple Cycle Gas ...quest-lb.com/admin/all/uploads/1434452889-Turbine Inlet Air Cooling Systems (TIAC) .pdfTURBINE INLET AIR COOLING (TIAC) Incremental](https://reader033.fdocuments.net/reader033/viewer/2022041714/5e49dbf38915305b55586cdf/html5/thumbnails/3.jpg)
Proposal
QUEST Deliverables:• TIAC System Equipment Provision.• Installation & Commissioning.• Operation & Maintenance of the TIAC System.• Performance Guarantee.• Provision of Incremental power (up to 25%)
End User (Power Plant Facility Owner)Deliverables:• EPC Contract• Space required for the TIAC System.• Branch steam / or NG and condenser water lines connections
for the TIAC System.
6/4/2015 3
![Page 4: Incremental Power Generation > for Simple Cycle Gas ...quest-lb.com/admin/all/uploads/1434452889-Turbine Inlet Air Cooling Systems (TIAC) .pdfTURBINE INLET AIR COOLING (TIAC) Incremental](https://reader033.fdocuments.net/reader033/viewer/2022041714/5e49dbf38915305b55586cdf/html5/thumbnails/4.jpg)
Indicative Deal Terms to End User
• EPC Contract
• Provision of Inlet Air Temperature at 15°C .
• O & M managed QUEST
• Incremental power Generation (ISO Output) delivered 24 hours /day, year round operation
6/4/2015 4
![Page 5: Incremental Power Generation > for Simple Cycle Gas ...quest-lb.com/admin/all/uploads/1434452889-Turbine Inlet Air Cooling Systems (TIAC) .pdfTURBINE INLET AIR COOLING (TIAC) Incremental](https://reader033.fdocuments.net/reader033/viewer/2022041714/5e49dbf38915305b55586cdf/html5/thumbnails/5.jpg)
Projects Pictures
6/4/2015 5
![Page 6: Incremental Power Generation > for Simple Cycle Gas ...quest-lb.com/admin/all/uploads/1434452889-Turbine Inlet Air Cooling Systems (TIAC) .pdfTURBINE INLET AIR COOLING (TIAC) Incremental](https://reader033.fdocuments.net/reader033/viewer/2022041714/5e49dbf38915305b55586cdf/html5/thumbnails/6.jpg)
Gas Turbine Capacity Enhancement through TIAC
Gas Turbine
Cooling
6/4/20156
Turbine capacity Enhancement up to 25%
![Page 7: Incremental Power Generation > for Simple Cycle Gas ...quest-lb.com/admin/all/uploads/1434452889-Turbine Inlet Air Cooling Systems (TIAC) .pdfTURBINE INLET AIR COOLING (TIAC) Incremental](https://reader033.fdocuments.net/reader033/viewer/2022041714/5e49dbf38915305b55586cdf/html5/thumbnails/7.jpg)
BROAD Exhaust Gas Driven Chillers –
BZE500 – 1650 TR Exhaust Gas Chiller – TIACExhaust gas driven Absorption Chiller –TIAC System
6/4/2015 7
![Page 8: Incremental Power Generation > for Simple Cycle Gas ...quest-lb.com/admin/all/uploads/1434452889-Turbine Inlet Air Cooling Systems (TIAC) .pdfTURBINE INLET AIR COOLING (TIAC) Incremental](https://reader033.fdocuments.net/reader033/viewer/2022041714/5e49dbf38915305b55586cdf/html5/thumbnails/8.jpg)
Exhaust gas driven Abs. Chiller -TIAC System
6/4/2015 8
![Page 9: Incremental Power Generation > for Simple Cycle Gas ...quest-lb.com/admin/all/uploads/1434452889-Turbine Inlet Air Cooling Systems (TIAC) .pdfTURBINE INLET AIR COOLING (TIAC) Incremental](https://reader033.fdocuments.net/reader033/viewer/2022041714/5e49dbf38915305b55586cdf/html5/thumbnails/9.jpg)
BROAD Exhaust Gas Driven Chillers –
Exhaust gas driven Abs. Chiller - TIAC System
6/4/2015 9
![Page 10: Incremental Power Generation > for Simple Cycle Gas ...quest-lb.com/admin/all/uploads/1434452889-Turbine Inlet Air Cooling Systems (TIAC) .pdfTURBINE INLET AIR COOLING (TIAC) Incremental](https://reader033.fdocuments.net/reader033/viewer/2022041714/5e49dbf38915305b55586cdf/html5/thumbnails/10.jpg)