Increase Your Manufacturing Efficiency with QAD’s Planning and Scheduling Workbenches
Gary Wasserman – Applications Specialist
What Do The Analysts Say?
“Best-in-Class manufacturers are 49% more likely to have real-time visibility between manufacturing operations and customer orders.”Matthew Littlefield, AberdeenGroup, Manufacturing Operations Management: Capitalizing on the Economic Recovery, March 2010
Planning and Scheduling Trends
• Integration
• Visibility
• Automation
• Tool/Process standardization
Planning & Scheduling Phases
DaysWeeksMonthsSales & Operations
Planning
Master Scheduling & Material Planning
Production Scheduling
Resource planning based on forecast & sales projections
Factoring materials, tools, personnel, machine setup times, defining job start
and completion times, job sequence.
Balancing supply/demand/capacity – defining job due dates
The Scheduler’s Challenge
QAD Planning and Scheduling Workbenches
Master Scheduler’s Challenge
Finance
Engineering
Executives
Manufacturing
Sales
There’s too much cash tied up in inventory!
There’s a new product introduction scheduled for the fall! But we need more time for design!
Service levels are down. I need more inventory! Whatever it takes to keep the customer happy!
ROI must improve; the stockholders are not happy!
There are too many changes! Provide fixed schedules and the correct parts and delivery will improve.
Production Scheduler’s Challenge
Finance
MaterialsManufacturing
Sales
High variances to “plan” (extra setup, downtime, labor), you need to optimize your production schedule.
You can’t change the schedule on short notice and expect the materials to be available.
Drops in a new high priority order due tomorrow, which order can be moved?
Labor / machine resources not available for 2nd shift – what are you going to do about this?
Common Planning & Scheduling Situation
The QAD Solution
QAD Planning and Scheduling Workbenches
CRP
Master Scheduling
Master Scheduling Flow
Discrete Scheduling
Repetitive Scheduling
Production Scheduling Flow
Period - > Month - > Week - > Day - > Shift - > Interval - > hour
• Initial plan is created by MRP
Demand Received
• Balance demand / supply /resources to ensure a feasible and level production plan.
Production Planned • Sequence
production orders by item attributes and resource allocations to Optimize shop floor
Production Scheduled
• Verify materials available
• Release orders• Print work orders and schedules
Production Dispatched • Monitor Production
& Manage Production Order
Production Reported
Base
MSW
PSW
Production Planned (MSW)
• Capacity & Load Planning• Manage Scheduling Horizon• Apply Data Groupings/Filters• Select Views (daily-weekly-monthly)• Apply Totaling (KYB)• Apply Leveling (KYB)
Production Planned (Base)
• Auto-Firm• Manage Production Order
Header Attributes Operation Attributes Date & Times
Production Planned
Production Scheduled
Production Dispatched
Production ReportedDemand received
CAC
MRP MSW PSW Base Base
CAC
Capacity FrameDisplays capacity information per selected resource in the Schedule Grid- Balance your planned and required capacity.
Supply/Demand FrameProvides demand & supply information per selected item in the Schedule Grid.- Primary information used for scheduling decision making.
Schedule GridThe primary context of the workbench. - View and modify your production schedules for each item.
MSW Screen Overview
Supporting PanelsEnables master scheduling action and decision making.
Represents over 30 maintenance programs and reports!
MSW Screen Overview
Production Order Sequence GridSchedule and sequence production orders by item attributes
Production Order BrowseSearch & group data per user specification
Drag & Drop the orders to the desired position on the Sequence Grid.
Production Order MaintenanceView and maintain all order details
PSW Screen Overview
Monitor Material Shortages
Planning and Scheduling Process Support
Release Production Orders by Work Center
Planning and Scheduling Process Support
Manage Materials for Work Center
Planning and Scheduling Process Support
Demo
QAD Planning and Scheduling Workbenches
Master Scheduling Workbench Value
• Reduces master scheduling time and complexity
• Compresses manufacturing response• Provides ability to create an effective
master schedule• Enables to be proactive
Production Scheduling Workbench Value
• Reduces production scheduling time and complexity
• Provides ability to create an “optimized” production schedule
• Removes need for spreadsheets