Incheon Bay - Birds Koreabirdskorea.org/Habitats/YSBR/Downloads/Birds-Korea...Ganghwa Tidal Power...
4
Period Total Cost Generation Capacity Generation Type Annual Power Generation Spring Tide Range Area Seawall length Generator Participants Classification - Municipal Office in charge: Incheon, Ganghwa County - Company: Korea Midland Power Co. Ltd - Construction: Daewoo E&C Consortium 2007-2017 2.352 Trillion Won 840 MW Ebb generation 1,556 GWh 8.97 m 79.4km2 8.4km 30 MW X 28 Ea 2005-2017 3.4 Trillion Won 1,440 MW Ebb generation 2,676 GWh 7.20 m 196km2 20.9km 30 MW X 48 Ea Ganghwa - Ministry of Land, Transport & Maritime Affairs - Korea Hydro & Nuclear Power Co. Ltd. - GS E&C Incheon Bay
Transcript of Incheon Bay - Birds Koreabirdskorea.org/Habitats/YSBR/Downloads/Birds-Korea...Ganghwa Tidal Power...
PeriodTotal CostGenerationCapacity
GenerationType
Annual PowerGenerationSpring Tide
RangeArea
Seawall lengthGenerator
Participants
Classification
- Municipal Office incharge: Incheon,Ganghwa County
- Company: KoreaMidland Power Co. Ltd
- Construction: DaewooE&C Consortium
2007-20172.352 Trillion Won
840 MW
Ebb generation
1,556 GWh
8.97 m
79.4km28.4km30 MW X 28 Ea
2005-20173.4 Trillion Won
1,440 MW
Ebb generation
2,676 GWh
7.20 m
196km220.9km30 MW X 48 Ea
Ganghwa
- Ministry of Land,Transport & MaritimeAffairs
- Korea Hydro &Nuclear Power Co. Ltd.
- GS E&C
Incheon Bay