Autumn 2018 DEGAS Partners IN STRICTEST CONFIDENCE DEGAS November 2018 Overview

Transcript of IN STRICTEST CONFIDENCE - evo rail · IN STRICTEST CONFIDENCE DALI Programme The Dali Programme was...

Page 1: IN STRICTEST CONFIDENCE - evo rail · IN STRICTEST CONFIDENCE DALI Programme The Dali Programme was born out of years of mmWave development to trial it in trackside-to-train backhaul

Autumn 2018DEGAS Partners

IN STRICTEST CONFIDENCE

DEGAS

November 2018

Overview

Page 2: IN STRICTEST CONFIDENCE - evo rail · IN STRICTEST CONFIDENCE DALI Programme The Dali Programme was born out of years of mmWave development to trial it in trackside-to-train backhaul

Autumn 2018DEGAS Partners

IN STRICTEST CONFIDENCE

Introduction

2

Po

or

Mo

bile

C

ove

rag

e

Inve

stm

en

ts in

on

-tr

ain

Wi-

Fi

mm

Wa

ve

De

ve

lop

me

nt

Ma

ntr

a P

roje

ct

DA

LI P

rogra

mm

e

De

ga

s P

rog

ram

me

SW

R &

Glo

ba

l E

xplo

itation

2015 2016 2017 2018 2018/19 2019/20

First Group have invested heavily to solve the long

standing trackside-to-train communications for a

connected customer experience from station-to-

station

This is not just about calls but a creating a home or

work like experience, where even on the busiest

trains customers can enjoy being fully connected.

Page 3: IN STRICTEST CONFIDENCE - evo rail · IN STRICTEST CONFIDENCE DALI Programme The Dali Programme was born out of years of mmWave development to trial it in trackside-to-train backhaul

Autumn 2018DEGAS Partners

IN STRICTEST CONFIDENCE

Mobile versus Ultrafast

2G

3G (500kbps)

4G (12Mbps)On-train throughput: <2Mbps

3

4G/LTE-A (~50Mbps)

5G (~200Mbps)

Ultrafast/5G’esque

On-train throughput >1Gbps

We need ~150Mbps as

FOC for customer Wi-Fi

and train data. So, could

have >>500Mbps available

for top-up, NR, etc!

Today

Page 4: IN STRICTEST CONFIDENCE - evo rail · IN STRICTEST CONFIDENCE DALI Programme The Dali Programme was born out of years of mmWave development to trial it in trackside-to-train backhaul

Autumn 2018DEGAS Partners

IN STRICTEST CONFIDENCE

Trackside poles, stanchions and

lighting posts (tiny

antennas/equipment with extremely

low loading and power consumption

Track-to-train

AP-2-2AP-2-1

4

AP-1-2AP-1-1

www

Train

Netflix

Amazon

Work

Page 5: IN STRICTEST CONFIDENCE - evo rail · IN STRICTEST CONFIDENCE DALI Programme The Dali Programme was born out of years of mmWave development to trial it in trackside-to-train backhaul

Autumn 2018DEGAS Partners

IN STRICTEST CONFIDENCE

6

Results

Train front unit

Train rear unit Handover delay(Resolved)

False association impacts throughput(Resolved)

MCS (forward facing ant.)

T/put (forward facing ant.)

MCS (rear facing ant.)

T/put (rear facing ant.)

Date: 05/09/18

Range: Secret

Speed: 20>100kph

T/put: >1<6Gbps

…and these are the poor results!

Page 6: IN STRICTEST CONFIDENCE - evo rail · IN STRICTEST CONFIDENCE DALI Programme The Dali Programme was born out of years of mmWave development to trial it in trackside-to-train backhaul

Autumn 2018DEGAS Partners

IN STRICTEST CONFIDENCE

‘Overage’

‘Overage’ presents an opportunity to not only delight customers but engage a wider

market to making a step change in rail travel:

7

▪ The TOC will require bandwidth for its customer

obligation to offer 50Mb/customer per day FOC

▪ Customer are highly likely to top-up. This may be

direct at cost or via their MNO, Sky or other

package, if they have secured that bandwidth to

offer it FOC to their customers. Or, other services

have bought the capacity to server the captured

audience

▪ There are many potential customer groups, e.g.

BTP/CCTV, NR, Mobile Operators, etc.

FOC 50Mb of Wi-Fi

passenger/day

Passenger top-up

MNO leased bandwidth

Amazon Prime

NR data, OTMR, GPS, etc.

Overage

FOC 15

0M

bp

s>

50

0M

bp

s

Page 7: IN STRICTEST CONFIDENCE - evo rail · IN STRICTEST CONFIDENCE DALI Programme The Dali Programme was born out of years of mmWave development to trial it in trackside-to-train backhaul

Autumn 2018DEGAS Partners

IN STRICTEST CONFIDENCE

DALI Programme

The Dali Programme was born out of years of mmWave development to trial it in trackside-to-

train backhaul delivery with the aim of deliver an exceptional Customer Experience (CX) through

Ultrafast Wi-Fi.

This has so far proven, at Network Rail’s test track, that mmWave can successfully deliver

Ultrafast Wi-Fi. However, Dali is about the total solution at is at a TRL Level 7/8 now, and will be

at 8/9 by the time we deliver SWR.

8

DEGAS

Trials/Testing

(2nd Gen Kit)

ExploitationGo-to Market Vehicle

Potential

Partnering

SWR Build

(2 years)

SWR Design

(6-9 months)

SWR

Kick-off

Strategic Partnership

BWT & FG

First small strategic

section live by YE-

19!!!

Oct-

18

Jan-1

9

Dec-1

9

DevOpsDALI Trial

(RIDC)

Page 8: IN STRICTEST CONFIDENCE - evo rail · IN STRICTEST CONFIDENCE DALI Programme The Dali Programme was born out of years of mmWave development to trial it in trackside-to-train backhaul

Autumn 2018DEGAS Partners

IN STRICTEST CONFIDENCE

SWR

9

Route Length 650 miles Stations Operated 186

Weekly Services 11,000+ No. of Trains 370+

Annual Ridership 230 million Average journey time 34-41 minutes

Today, an average

peak time customer

gets <<1Mbps