It's our aim to be the fi rst choice engineering and delivery partner for the building services industry”
Hotels & Leisure Sector Profile Contents
Company Review 2
Imtech Group Strength 3
Imtech UK Office Locations 4
Mission, Vision, Core Values & Culture 5
Hotels & Leisure Sector Coverage at a Glance 6
A Selection of Hotels & Leisure Sector Projects 7-8
Grosvenor Hotel / Apartments Case Study 9
Wembley Arena Case Study 10
Epsom Racecourse Case Study 11
Intercontinental Hotel Case Study 12
Health, Safety and Environmental 13
© 2009 IMTECH TECHNICAL SERVICES
PAGE 2 IMTECH TECHNICAL SERVICES COMPANY PROFILE
Gerard van de AastChief Executive OfficerImtech NV
Paul KavanaghGroup Chief ExecutiveImtech UK and International
Imtech UK Group Structure
Company Profi le
Royal Imtech NVWith some 27,400 employees, around 23,000 customers and annual revenue above
€5.1 billion, Imtech NV is a leading European technical services provider in the fields of
electrical services, ICT and mechanical services.
We enjoy strong presence in the buildings and industry markets of the Netherlands, Belgium,
Luxembourg, Germany, Austria, Eastern Europe, Scandinavia, the UK, Ireland and Spain, as well as
in the European ICT and traffic markets and the global marine market. Our shares are listed on the
Euronext Stock Exchange in Amsterdam where Imtech is included in the Midkap Index. Imtech’s
shares are listed on the Euronext Stock Exchange and are also included in the Dow Jones STOXX
600 index.
Imtech UK Imtech UK is a significant provider of technical services to the building, utilities and
process industries across the UK.
Imtech UK is part of the large international Imtech NV Group. UK and Irish Operations are led by
Paul Kavanagh who also sits on Imtech NV's Executive Council and is charged with driving the UK
business forward by building on its strong financial and technical platform to achieve its strategic
objective of being a major national player in the UK building services sector. With a management,
project and supervisory staff of approximately 2,300 personnel, a turnover in excess of £514 million
and underpinned by strong technical and delivery personnel Imtech UK has the flexibility to deliver
across a range of project types and market sectors and ultimately meet and exceed the demands of
its UK client base.
ROYAL IMTECH NV Gerard van de Aast
GROUP Chief Executive Offi cer
IMTECH UKPaul Kavanagh
Chief Executive Offi cer
IMTECH MARINE
IMTECH BOLASHAK
IMTECH TECHNICAL SERVICES
PEEK INFRA
IMTECHMEICA
Martin McEvoy(MD)Maritz Naude(FD)
IMTECHG&H
Darron Littlehales(MD)Neil Evans(FD)
IMTECHAQUA
John Wardley(MD)Bridget Hendry(FD)
IMTECHWATER, WASTE AND ENERGY
Bruno Speed(MD)Steve Urry(FD)
IMTECHSUIR
Eddie Walsh(MD)Pat O'Boyle(FD)
INVIRONan Imtech companyGarry Metcalfe(MD)Dipak Chauhan(FD)
IMTECHSMITH
Gary Dowd(MD) Alec Watt(FD)
IMTECH ICT
CAPULAan Imtech company
Roger TurnerMD)Michael Fawcett(FD)
PERSONABLE & PROFESSIONAL PAGE 3
Imtech Group Strength
We are a significant lead engineering provider of technical services to the building services, infrastructure and process industries
across the UK and Ireland. Operating through eight strategic business units and a network of local offices across the UK and the
Republic of Ireland, we have gained a reputation for delivering complex technical engineering solutions and installations across
all market sectors.
Tailoring our services to local needs and customers wishes is a key component of our business strategy, which is supported by
the resources and expertise of one of the UK’s leading players and further strengthened by being part of Imtech NV, a global
€5.1 billion business.
NEW BUILD EDUCATION TRANSPORTATION RETAIL PUBLIC COMMERCIAL DATA CENTRES ICT ENERGY
REFURBISHMENT RESEARCH & HEALTHCARE HOTEL & LEISURE RESIDENTIAL MAINTENANCE
SECTOR TRACK RECORD
YOUR LOCAL BUSINESS ORGANISATIONSECTOR TRACK RECORD
Project Values 1million - 25 million
LOCAL CULTURE AND DELIVERY
NATIONAL AGENDA FOR KEY CLIENTS
FINANCIAL & TECHNICAL STRENGTH
C5.1bn
IMTECH TECHNICAL SERVICES
UK GROUP SKILLS
£514m
IRELAND
WALES
LONDON
NORTH ENGLAND
SOUTH EAST ENGLAND
IMTECH TECHNICAL SERVICES
SPAIN GERMANY BELGIUM SCANDINAVIA THE NETHERLANDS UK IRELAND
IMTECH NV EUROPEAN TECHNICAL SERVICES CAPABILITIES
PAGE 4 IMTECH TECHNICAL SERVICES COMPANY PROFILE
1 2
3
8
4
56
7
11
12
13 9
10
14
15
Key Offi ce Locations Imtech UK H.Q. Imtech House Imtech (Meica) 33–35 Woodthorpe Road Head Office Ashford, Middlesex TW15 2RP Telephone No: 01784 229 900 Fax No: 01784 229 901 Imtech (Meica) Suites 69-72, 2nd Floor City Office 65 London Wall, London EC2M 5TU Telephone No: 020 7374 0766 Fax No: 0207374 0767
Imtech (G&H) Hooton Street Head Office Cartlton Road Nottingham NG3 5GL Telephone No: 0115 9505100 Fax No: 0115 9581200
Imtech (G&H) RCM Business Centres Northern Regional Office Sandbeds Trading Estate Dewsbury Road, Ossett West Yorkshire WF5 9ND Telephone No: 01924 277880 Fax No: 01924 277884
Imtech (Aqua) Aqua House Head Office South East Rose and Crown Road Swavesey, Cambridgeshire CB24 4RB Telephone No: 01954 234 600 Fax No: 01954 230 593
Imtech (Suir) Unit 9A Head Office Cleaboy Business Park Old Kilmeaden Road Waterford Telephone No: +353 (0) 51 359500 Fax No: +353 (0) 51 359599
Imtech (Suir) Block A, Unit 12 Dubin Office Orchard Business Centre Orchard Avenue City West Business Campus Dublin 24 Telephone No: +353 (0) 1 4691850 Fax No: +353 (0) 1 4105804 Inviron 3100 Park Square Head Office Solihull Parkway Birmingham Business Park Birmingham B37 7YN Telephone No: 0121 779 7005 Fax No: 0121 779 8222
Inviron Deben House London Office 1 Selsdon Way City Harbour London E14 9GL Telephone No: 0207 515 5511 Fax No: 0207 515 5551
Inviron Granite House Glasgow Office 31 Stockwell Street Glasgow G1 4RZ Telephone No: 0141 553 1991 Fax No: 0141 553 2002
Inviron Swallow House Washington Office Parsons Road Washington Tyne & Wear NE37 1EZ Telephone No: 0191 415 7007 Fax No: 0191 415 7101
Imtech (Process) Imtech House Head Office 5 Newlands Court Attwood Road, Burntwood, Staffordshire WS7 3GF Telephone No: 01543 496 600 Fax No: 01543 496 601
Imtech (Process) One Talbot Gateway Regional Office BP Energy Park Seaway Parade Baglan, Port Talbot SA12 7BR Telephone No: 01639 816 800 Fax No: 01639 816 944
Smith Group UK Calder House Head Office St. George's Park Kirkham, Lancashire PR4 2DZ Telephone No: 01772 471 111 Fax No: 01772 471 112
Imtech (Meica) 2nd Floor Oxford Office 23 Park End Street Oxford OX1 1HU Telephone No: 01865 242 472
Imtech (ICT) Viables 3, Jays Close Head Office Basingstoke, Hampshire RG22 4BS Telephone No: 01256 312 350 Fax No: 01256 312 377
Capula Orion House Head Office Stone Business Park Stone, Staffordshire ST15 0LT Telephone No: 01785 827 000 Fax No: 01785 825 900
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
16
17
17
PERSONABLE & PROFESSIONAL PAGE 5
Our Approach
We are committed to delivering real value to our clients and partners through our technical capabilities and expertise, and our
focus on designing and delivering innovative solutions.
Our technical capabilities have grown through our extensive experience of complex projects including responsibility for design
and build, open book procurement, value engineering and much more. We have demonstrated a track record designing
solutions which deliver lower operating costs and total cost of ownership for our clients. Our technical expertise is supported
by a structured approach to aftercare, and a specialised area of our business dedicated to service and maintenance.
These important areas of delivery for our customers are underpinned by our vision and values :
Vision, Mission and Values
Personable and Professional is our committed way of working with you. We are a team player, we strongly believe in
communications and Director accessibility to you our customer at all times. We are fully committed to the continuous technical
and professional training of all our staff and we never walk away from our responsibilities to you our client.
PERSONABLE AND PROFESSIONAL LEAR
NIN
G A
ND
GR
OW
ING
“To be the fi rst choice engineering
and delivery partner for the building services industry across the UK”
LEAD
ER
SH
IP A
ND
TE
AM
WO
RK SAFE AND GOOD NEIGHBOUR
Train, inspire, develop and reward our people to secure outstanding performance Provide opportunities for development and growth
Understand fully the needs of our UK based customersBuild excellent relationshipsBe responsive and deliver what we promise through:■ Engineering - right fi rst time■ Technical Innovation■ Excellent Delivery■ Experience and Continuous Improvement■ Open and Honest Dialogue■ Customer for Life
Customers
Build positive relationships Achieve mutual success - a joint commitment to excellenceUtilise fully the unique capabilities of our partners
PartnersStaff
Establish long term relationshipConduct business in a fair, reasonable and professional manner
Supply Chain
Deliver sustainable growth and targeted market shareSecure acceptable profi tability
Shareholders
Implement high standards of health and safetyPro-actively protect the environment through sustainable solutionsConduct our business honestly and with integrityOperate all our businesses in a safe and responsible way for our staff, co-workers and the public in general
Community
PAGE 6 IMTECH TECHNICAL SERVICES - HOTELS & LEISURE PROFILE
Broadway Media Centre
Scope of WorksMechanical, Electrical and Public Health installation
Project Value£800k
Main ContractorBluestone Plc
Intercontinental Hotel
Scope of WorksMechanical, Electrical and Public Health installation
Project Value£11m
Main ContractorJohn Sisk & Son Ltd.
Dakota Hotel and Innovate Offices
Scope of WorksMechanical, Electrical and Public Health installation
Project Value£2.4m
Main ContractorDawn Construction
Imperial War Museum
Scope of WorksMechanical, Electrical and Public Health installation
Project Value£3.5m
Main ContractorLaing O'Rourke
Center Parcs, Elveden Forest
Scope of WorksMechanical, Electrical and Public Health installation
Project Value£10.2m
Main ContractorClegg Construction
Grosvenor Hotel Apart's
Scope of WorksMechanical, Electrical and Public Health installation
Project Value£20m
Main ContractorJohn Sisk & Son Ltd.
Hotel and Leisure National Capability at a Glance
Dakota Hotel Sherwood Park Office
Scope of WorksMechanical, Electrical and Public Health installation
Project Value£1m
Main ContractorSimons Construction
Hotels and Leisure Sector Experience
PERSONABLE & PROFESSIONAL PAGE 7
Grosvenor Hotel Apart's Mechanical, Electrical 20,000 20 Months John Sisk & Son LtdPark Lane and Public Health services DSA to luxury apartments including Gardiner & Theobald shell and core works refurbishment
Inter-Continental Hotel Mechanical, Electrical 12,000 9 Months John Sisk & Son LtdHyde Park Corner and Public Health Services DGRLondon installation for major Gardiner & Theobald refurbishment project
Wembley Arena Mechanical, Electrical 6,200 15 Months John Sisk & Son LtdLondon Services installation Hilson Moran for prestigious grade II Gardiner & Theobald listed refurbishment project
Northumberland Hotel Mechanical, Electrical 8,000 16 Months CostainLondon and Public Health Services Elementa installation for major MDA Consulting hotel refurbishment
Central Park Leisure Centre Mechanical, Electrical 1,500 8 Months MowlemLondon and Public Health Services Siloch Dawson installation for leisure centre refurbishment project
St James Court Hotel Mechanical, Electrical and 2,700 12 Months FEBCRefurbishment Public Health services to Imtech MeicaWestminster apartments and suites Boyden & CoLondon
Novotel, Hammersmith Heating andchilled water 3,200 8 Months BovisPhase 1 distribution Mechanical NorthdaleWestminster services refurbishmentLondon
PROJECT SCOPE OF WORK VALUE CONTR. CONTRACTOR& EMPLOYER IN £000'S PERIOD /CONSTRUCTION MANAGER CONSULTANTS QUANTITY SURVEYOR
Bedford Corner Hotel Installation of Mechanical 1,600 11 Months Ballast WiltshireTottenham Court Road and Electrical services Integrated Design AssociatesLondon refurbishment Cyril Sweett Partnership
Gatwick Forte Crest Hotel Refurbishment of 379 1,200 12 Months Wates ConstructionGatwick Airport hotel bedrooms Marks Heeley & BrothwellLondon (plumbing and electrical) Director of Design, Forte Hotels
Craven Hill Gardens Hotel Mechanical, Electrical 2,000 12 Months John SiskLondon services installation David Bowditch Associates refurbishment Jestico & Whiles
Master works Development Mechanical, Electrical 4,200 9 Months Costain LtdCorporation and Public Health Services Lehr AssociatesClub Quarters design & build 256 bedroom Client16/18 Ludgate Hill hotel refurbishmentLondon
Royal Court Theatre Mechanical Services 1,400 9 Months SchalSloane Square installation for refurbishment Max FordhamsLondon of prestigious London Theatre
Wentworth Health Mechanical, Electrical and 2,100 12 Months Bovis Lend Leaseand Tennis Club Public Health servicesSurrey installation for private leisure facilities upgrade
Park Inn Heathrow Mechanical, Electrical and 8,000 19 Months Imtech Meica LtdRezidor Public Health refurbishment BCHF to 4 star hotel
PROJECT SCOPE OF WORK VALUE CONTR. CONTRACTOR& EMPLOYER IN £000'S PERIOD /CONSTRUCTION MANAGER CONSULTANTS QUANTITY SURVEYOR
PAGE 8 IMTECH TECHNICAL SERVICES - HOTELS & LEISURE PROFILE
Hotels and Leisure Sector Experience
PERSONABLE & PROFESSIONAL PAGE 9
The installation and commissioning of Mechanical, Electrical and Plumbing services to 129
apartments and 4 Penthouses, all receptions, Front of House and back of house areas.
Services include:
• LTHW, Chilled water pipework services
• Public Health Services
• Primary and secondary ductwork systems
• Electrical services, Fire Alarm installation
• Sprinkler Mist system
• BMS installation
The project comprises a six star standard refurbishment and fit out of levels 2-8 of a former
hotel building. The development contains 133 “super luxury” serviced apartments ranging
from studios to five bedroom penthouses, which will include fully fitted kitchens and butler
services to cater for mid to longer term guests. It will also be possible to connect adjoining
apartments, in some cases possibly taking over an entire floor.
The main reception and back of house areas are located on Level 2. The internal courtyard
will form the focal point of the development where guests are able to meet and relax with
friends and associates. A full service bar and restaurant is located within the internal
courtyard.
Work was sensitively programmed so as to minimize disturbance to guests at the Grosvenor
House Hotel and function rooms alongside and below the works. The lower part of the south
block contains function rooms including the Great Room, the largest ballroom in Europe,
lobbies and restaurants, all of which are run and operated by the Marriott. These levels
remained in full operation for the duration of the works.
CLIENT: Park Lane Properties Ltd
MAIN CONTRACTOR:John Sisk & Sons Ltd.
CONSULTING ENGINEER: DSA
PROJECT VALUE: £21,000,000
Grosvenor House HotelHotel & Leisure Sector Case Study
The Wembley Arena project was focused around the need to re-orientate the venue to
integrate with the wider Wembley Master plan proposals which include the new Football
Association International Stadium.
The project encompassed reconfiguring the building interior, including the main auditorium,
entrance foyer, restaurant facilities, dressing rooms and covered service yard. The project was
focused on reinstating some of the original characteristics of this Grade II listed building and
enhancing the customer experience within this high profile venue. Imtech was responsible
for delivering the mechanical and electrical services installation throughout the venue in
partnership with the developer Quintain Estate Developments, the operator Wembley London
Ltd, and their professional team to meet the strict deadlines sent within the budget and
quality constraints required for this prestigious development.
“I am writing to express my sincere thanks to you and your team for being so pro-active and
positive in the successful reopening of Wembley Arena. This was a major refurbishment and
reorientation project in a listed building that demanded attention to detail, a high degree of
coordination and an immensely committed workforce. In working with the main contractor,
Imtech's team rose admirably to all these demands, led by Kevin Joyce on site, to whom I
extend a special thank you. The project is significant for Quintain. It is the first public
building within a world class piece of public realm, within what will eventually be a new
district for London - the creation of New Wembley. To have reopened Wembley Arena on
time, to budget and to a high level of specification is a credit to everybody involved. I hope
that I will have the opportunity to work with you, Kevin and the rest of your team again, in
the not too distant future.”
David Crump
Head of Construction and Project Management
(Quintain Estates Development plc)
PAGE 10 IMTECH TECHNICAL SERVICES - HOTELS & LEISURE PROFILE
CLIENT: Quintain Estates Development plc.
CONSTRUCTION MANAGER/CONTRACTOR: John Sisk & Son Ltd.
CONSULTING ENGINEER: Hilson Moran Partnership
QUANTITY SURVEYOR: Gardiner & Theobald
PROJECT VALUE: £5,500,000
Wembley ArenaHotel & Leisure Sector Case Study
PERSONABLE & PROFESSIONAL PAGE 11
Imtech Smith were responsible for the complete mechanical and electrical installation to the
new 11,000 seat grandstand at the world famous Epsom Racecourse.
The building features a new main betting hall with bars and catering, which can also host
conferences, banqueting and events. Three first floor function rooms with seating for up to
600 people have flexible uses for conferences and functions, and the second floor comprises
14 private boxes plus a 'Super Box' for just over 100 people for smaller events and race days.
Energy efficiencies include a ground source heat pump, solar control glass, PIR lighting
controls, aerated taps and low flush toilets.
A crucial element was to partially rebuild the grandstand in time for the 2008 Derby Festival,
which was achieved by completing the 4000 capacity terrace area. The event is attended by
around 100,000 people, and work was carefully choreographed to ensure the Festival went
ahead as normal, and with minimal impact on the existing facilities.
This project which was secured by competitive tender and consisted of a full mechanical and
electrical supply and install.
Scope of works included:
• Lighting, Power
• Fire Alarm, CCTV
• Lightning Protection Systems
• Boosted Water System
• Heating,Ventilation and A/C
• Above Ground Drainage
• Ground Source Heat Pump
CLIENT:Epsom Racecourse
MAIN CONTRACTOR:Willmott Dixon
CONSULTING ENGINEER: Smith Group
PROJECT VALUE:£3,400,000
Epsom RacecourseHotel & Leisure Sector Case Study
The intercontinental hotel on Park lane in Mayfair is situated in one of the most
prestigious addresses in London, boasting views across Hyde park and Mayfair. The Hotel
is world renowned for its five star accommodation and service and is the flag ship property
for the Intercontinental Hotel group more commonly associated with the Holiday inn chain
of hotels across the world.
The project consisted of the refurbishment of 447 guest rooms made up of standard,
superior, general suites and special suites which included for 2 spa guest and 6 major suites
and a VIP lounge.
In the early stages of the contract speed of setting up site and carrying out extensive
validation surveys of the already installed services was of the upmost importance, this was
required in that we could confirm that services had been installed to the appropriate
standards and to ensure a smooth start to the installation processes.
Imtech Meica provided the complete M & E package to the rooms including speciality
services which include television, Audio visual, internet, air conditioning and security as
well as the general electrical, mechanical and public health installations.
During the construction phase installation peaked at 25 rooms per week with close
coordination and planning with John Sisk to ensure each guest room was completed in line
with the standards required for a hotel that has exacting quality standards for its clients.
The challenge on this project was to have operational rooms back into service as quickly as
possible. This was successfully carried out with the first 100 guest rooms put into service
within 5 months of starting on site. Then each floor was progressively handed over to the
hotel on a floor by floor basis whilst maintaining services to the upper operational floors.
The final guest room was completed within 12 months.
"The InterContinental was a difficult project with exacting standards. This was made even
harder for both of us due to the extremely short lead period, following the demise of the
previous main contractor who had commenced the installations. It is a credit to your team
that they were able to establish true requirements so quickly, which ultimately led to the
Hotel being operational by their target dates.
I must also thank you for being an integral part of the quality delivery team. Both the
client's team and final operational team from the Hotel have been highly complimentary
of the overall product. The standards were kept to a true 5-star finish throughout all the 447
bedrooms."
Graham Sturge
Regional Director for John Sisk & Sons
PAGE 12 IMTECH TECHNICAL SERVICES - HOTELS & LEISURE PROFILE
CLIENT: Intercontinental Hotels Group
MAIN CONTRACTOR:John Sisk & Son Ltd.
CONSULTING ENGINEER: BSG
M&E CONTRACTOR: Gardiner & Theobald
PROJECT VALUE: £11,000,000
Intercontinental HotelHotel & Leisure Sector Case Study
PERSONABLE & PROFESSIONAL PAGE 13
CSR and Working Safely
Why Working Safely and Protecting the Environement is Important to us
Imtech Technical Services Ltd. recognises that it has a responsibility to you our customers,
our employees and to the wider environment.
People are our biggest asset and the protection of their human rights, development of their
talents and active involvement in the planning and direction of their work is critical to the
organisations ongoing commercial success - we are nothing without them!
As well as employees they are friends - we recognise our duty to protect them whilst at work
and to contribute to the protection of the environment around them.
With this in mind Imtech Technical Services Ltd. were one of the first UK building services
contractors to gain accreditation to the environment standard of ISO 14001: 1996.
Early involvement at feasibility stage allows a greater opportunity to design a sustainable
solution. Our aim is to embrace 'Green' technology where possible in order to contribute
to the long term protection of our environment.
Corporate Social Responsibility
Imtech is increasingly involved in the implementation of environmentally sound and
sustainable technical solutions:
• Sustainable engineering solutions - for example the Innovate Building in Leeds, which
was awarded the highest BREEAM rating of any building in the UK at the time.
• Exploitation of energy generation from renewable energy sources and bio energy
• Decreased emissions of greenhouse gases and fine particles
• Realisation of clean water solutions and preventing water pollution
There is commitment at Board level to focus on how Imtech’s primary business activities can
contribute towards sustainable development, and to conduct ourselves in ways that make an
important contribution towards a sustainable and liveable society.
This commitment has resulted in a number of successful recent inititives, including:
• The development of company-wide Business Principles and HR principles
• ISO 14001 certification in many parts of the business
• First official Imtech participation in the Carbon Disclosure Project
• QHSE: Quality, Health, Safety en Environment à Safetecq® campaign
• A Corporate Citizenship programme: “Shared Success in Developing Countries”
• A process establishing a benchmark measure for CO² and equivalent emissions in
Imtech Technical Services offices, and a programme of activities to reduce these
emissions.
Royal Imtech NV
ISO 9001:2008ISO 14001:2004OHSAS 18001:2007
QUALITY, ENVIRONMENTALAND OCCUPATIONAL HEALTH& SAFETY APPROVED SYSTEM
November 2012