IMPROVING RAILOPERATIONS WITH
LEADING-EDGECONTROLSYSTEMS
SMART RAIL ASIA 2014
NOVEMBER 27TH, BANGKOK
JOFFREY LAUTHIERHEAD OF SALES, ASIA PACIFIC
RAIL CONTROL SOLUTIONS
INTRODUCTION TO BOMBARDIER
THE WORLD’S ONLY MANUFACTURER OF BOTH PLANES AND TRAINS
Corporate office in Montréal, Canada
Listed on the Toronto Stock Exchange (BBD)
Listed on the Dow Jones Sustainability World index
$18 billion revenues, $72 billion backlog
70,000+ people worldwide
AEROSPACE
Business aircrafts: Learjet, Challenger, Global
Commercial aircrafts: QSeries, CRJ Series, CSeries
TRANSPORTATION
Rolling Stock
E&M Systems Integration
Signalling Systems
Maintenance Services
PAGE 2 | SMART RAIL ASIA 2014 | IMPROVING RAIL OPERATIONS WITH LEADING-EDGE CONTROL SYSTEMS
BOMBARDIER TRANSPORTATION IN ASIA PACIFIC
46 LOCATIONS IN 29 CITIES
BANGKOK
Regional Headquarter- Rail Control Solutions- Rolling Stock
450+ staff
Delivering projects acrossAsia Pacific
Offices
Manufacturing sites
Engineering sites
Service sites
Countries with BT locations and projects
PAGE 3 | SMART RAIL ASIA 2014 | IMPROVING RAIL OPERATIONS WITH LEADING-EDGE CONTROL SYSTEMS
Bombardier TransportationSignal (Thailand) Ltd.
3354/16-19 6th Floor, ManoromBuilding, Rama IV RoadKlongton, KlongtoeyBangkok 10110
Tel: +66 2672 8290
RAIL CONTROL SOLUTIONS
COMPLETE RANGE OF IN-HOUSE SIGNALLING PRODUCTS
EBI Linkwayside equipment
EBI Comradio block centre
EBI Tracktrain detection
EBI Lightsignals
EBI Switchpoint machines
EBI Screencontrol room
EBI Starvehicle telematics
EBI Gatelevel crossings
EBI Drivedriver assistance system
EBI Lockcomputerised interlocking
EBI CabATC onboard equipment
EBI Tooldesign and maintenance
PAGE 4 | SMART RAIL ASIA 2014 | IMPROVING RAIL OPERATIONS WITH LEADING-EDGE CONTROL SYSTEMS
120 kph
250 kph
350 kph
SPEED
100,000pphpd
CAPACITY
ERTMSLevel 2
ERTMSLevel 1No ATP
ERTMSLevel 3
Mass Transit
Commuter
High Speed Rail
TRAIN CONTROL SYSTEMS TODAY
DOMAIN OF APPLICATION
CBTC
Interoperabilityachieved
Technology andperformance
lagging
MAINLINE MASS TRANSIT
High-performance
Proprietary
WHY EUROPEAN RAIL TRAFFIC MANAGEMENT SYSTEM?
ERTMS IS BEING ADOPTED WORLDWIDE AS THE DE-FACTOSTANDARD SIGNALLING SYSTEM FOR RAILWAYS
42 COUNTRIES
ASIA PACIFIC
• Australia
• China
• India
• Kazakhstan
• Malaysia
• New Zealand
• South Korea
• Taiwan
PAGE 7 | SMART RAIL ASIA 2014 | IMPROVING RAIL OPERATIONS WITH LEADING-EDGE CONTROL SYSTEMS
WHY ERTMS LEVEL 2?
EUROPEAN TRAIN CONTROL SYSTEM
OPERATIONS
• Standardization of cross-border operations
• Increased capacity, shorter headways
• Highest safety levels: SIL-4
• Reduced wayside equipment, reducedmaintenance
DRIVER MACHINE INTERFACE
• Harmonised presentation of ERTMS andSTM information
• Ergonomics compatible with interoperableoperational rules
• Reduced risk of driver error
• More information available to the driverallowing for optimised driving
PROCUREMENT
• Compatibility: increased suppliercompetition, reduced costs
• Long-established, proven system andcomponents
• Future-proof: stable specifications, largeinstalled base, multiple suppliers
PAGE 9 | SMART RAIL ASIA 2014 | IMPROVING RAIL OPERATIONS WITH LEADING-EDGE CONTROL SYSTEMS
ON THE CHINESE VERY-HIGH SPEED LINES
PAGE 10 | SMART RAIL ASIA 2014 | IMPROVING RAIL OPERATIONS WITH LEADING-EDGE CONTROL SYSTEMS
ERTMS LEVEL 2 AND CTCS LEVEL 3
• First revenue service in 2009 on the Wuhan-Guangzhou lineat 350 kph
• 12,580 km of track, 88% of VHS track in operation
• 470 trains equipped, 768 million km travelled
BOMBARDIER ERTMS LEVEL 2 TECHNOLOGY
WHAT IS ERTMS LEVEL 2?
PAGE 11 | SMART RAIL ASIA 2014 | IMPROVING RAIL OPERATIONS WITH LEADING-EDGE CONTROL SYSTEMS
RADIO TRANSMISSION: GSM-R, TETRA, WiMAX OR LTE?
ALTERNATIVES TO GSM-R
ERTMS level 3 operations inKazakhstan
Taiwan High-Speed Railcommercial internet access
Shuo Huang Railway in China
COMPATIBILITY WITH EXISTING NATIONAL ATP SYSTEMS
PAGE 13 | SMART RAIL ASIA 2014 | IMPROVING RAIL OPERATIONS WITH LEADING-EDGE CONTROL SYSTEMS
UNISIG and the European TEN-Tproject started to develop ATOstandards for ERTMS
AUTOMATIC TRAIN OPERATIONS
FULLY-AUTOMATIC OPERATION WITH ATO TECHNICALLY POSSIBLE
OPTIMAL SPEED CONTROL
• Optimal Speed Control
• Energy efficient driving
• Shorter headways
• Optimised mixed-traffic network
• Better recovery from disruptions
STATION ENTRY MANAGEMENT
• Accurate stopping
• Selective door opening
• Platform Screen Doors interface
• Automatic turn-back
ATO FOR COMMUTER LINES
• Bangkok SRT Red Lines
• Guangzhou Intercity Lines
• Melbourne Metro / Dandenong Corridor
• Sydney ATCS
PAGE 14 | SMART RAIL ASIA 2014 | IMPROVING RAIL OPERATIONS WITH LEADING-EDGE CONTROL SYSTEMS
FAST FORWARD TO ERTMS LEVEL 3
MOVING BLOCK, COMMUNICATION BASED TRAIN CONTROL
FROM LOW-DENSITY LINES
• Radio-based, no conventionaltrain detection
• Low lifecycle cost benefits:50% CAPEX, 50% OPEXreduction
• Sweden: Västerdal LineKazakhstan: Uzen–Boloshak,Zhetygen–Korgas
TO HIGH-CAPACITY
COMMUTER LINES
• Short headways thanks tomoving block principles
• Higher availability due toreduced wayside components
PAGE 15 | SMART RAIL ASIA 2014 | IMPROVING RAIL OPERATIONS WITH LEADING-EDGE CONTROL SYSTEMS
120 kph
250 kph
350 kph
SPEED
100,000pphpd
CAPACITY
ERTMSLevel 3
ERTMSLevel 2
ERTMSLevel 1No ATP
ERTMSLevel 3
Mass Transit
Commuter
High Speed Rail
THE EVOLUTION OF TRAIN CONTROL
ERTMS–CBTC CONVERGENCE
CBTC
• interoperable
• high-capacity moving blocksignalling
• standardized AutomaticTrain Operation
ERTMS LEVEL 3
HIGH-SPEED RAIL SIGNALLING
CONVERGENCE WITH COMMUNICATION-BASED TRAIN CONTROL
ERTMS LEVEL 2:DE-FACTO STANDARD
• in-cab movement authority, no signals
• standard, interoperable
• compatibility with legacy train protectionsystems through STM
ALTERNATIVES TO GSM-R EXIST
• where spectrum availability is an issue
• when higher performance is required
AUTOMATIC TRAIN OPERATION
• precision stopping at platforms
• high-performance driving style
ERTMS LEVEL 3: THE FUTURE
• short-headway, high-capacity operations
• no high-maintenance train detection
ETCS-CBTC CONVERGENCE
PAGE 18 | SMART RAIL ASIA 2014 | IMPROVING RAIL OPERATIONS WITH LEADING-EDGE CONTROL SYSTEMS
Seattle-TacomaInt’l Airport
USA
SacramentoInt’l Airport
USA
San FranciscoInt’l Airport
USA
McCarran Int’l AirportLas Vegas
USA
Dallas/Fort WorthInt’l Airport
USA
SEPTALight Rail
USA
KingstonTest Track
Canada
PittsburghTest Track
USA
PhoenixInt‘l Airport
USA
São PauloMetro Line 5
Brazil
King Abdulaziz Int’l Airport, JeddahKingdom of Saudi Arabia
King AbdullahFinancial District Monorail, RiyadhKingdom of Saudi Arabia
Dubai International AirportUnited Arab Emirates
Metro MadridLines 1 and 6
Spain
Shenzhen MetroLine3China
Guangzhou MetroPearl River LineChina
Tianjin Metro Lines 2 & 3China
Yong-InAdvanced Rapid TransitSouth Korea
Wenshan-Neihu LineTaiwan
TiradentesMonorail
São PauloBrazil
Klang ValleyMass Rapid
TransitMalaysia
Munich AirportGermany
Heathrow Int‘l AirportGatwick Int’l Airport
United Kingdom
Lines in Revenue
Operation 19
Lines being
implemented 10
Bangkok MRT – Purple LineThailandBangkok BTS – Green Lines(two) Thailand
Delhi Metro Line 7India
Total 29
Test Tracks (2)
Üsküdar-Ümraniy-Çekmeköy Line
Turkey
COMMUNICATIONS-BASED TRAIN CONTROL
COMMUTER
METRO
LRT
MONORAIL
OPEXOPEX
COMMUNICATIONS-BASED TRAIN CONTROL
PAGE 19 | SMART RAIL ASIA 2014 | IMPROVING RAIL OPERATIONS WITH LEADING-EDGE CONTROL SYSTEMS
CAPEXCAPEX
PERF.PERF.
CBTC
A RANGE OF APPLICATIONS
CBTC ARCHITECTURE: SOMETIMES TOO COMPLICATED?
PAGE 20 | SMART RAIL ASIA 2014 | IMPROVING RAIL OPERATIONS WITH LEADING-EDGE CONTROL SYSTEMS
CBTC ARCHITECTURE: SOMETIMES TOO COMPLICATED?
PAGE 21 | SMART RAIL ASIA 2014 | IMPROVING RAIL OPERATIONS WITH LEADING-EDGE CONTROL SYSTEMS
COMMUNICATIONS-BASED TRAIN CONTROL
MOVING BLOCK TECHNOLOGY
HIGH-PERFORMANCE
• Shorter headways, increasedcapability to recover from disruptions
• Higher availability
SIGNALLING UPGRADES
• Conveniently deployed on top ofconventional signalling
• Shadow testing
LOWER LIFE-CYCLE COST
• Reduced wayside equipment
• More radio = less cables
• CBTC mature and suitable to awide range of rail applications
• Many architectural andfunctional choices to fitoperations
• Flexible CITYFLO andINTERFLO solutions to meetrequirements
CBTC BENEFITS
PAGE 22 | SMART RAIL ASIA 2014 | IMPROVING RAIL OPERATIONS WITH LEADING-EDGE CONTROL SYSTEMS
120 kph
250 kph
350 kph
SPEED
100,000pphpd
CAPACITY
ERTMSLevel 3
ERTMSLevel 2
ERTMSLevel 1No ATP
ERTMSLevel 3
Mass Transit
Commuter
High Speed Rail
THE FUTURE OF TRAIN CONTROL
ERTMS LEVEL 3 / SHIFT2RAIL NEXT GENERATION TRAIN CONTROL (NGTC)
(CBTC)
• Single interoperable signalling solution
• High-capacity or low life-cycle costs
• No matter the type of rail operations
Q&A?
Joffrey LauthierHead of Sales, Asia Pacific