www.ipamc.org Ben Stevens OMDEC Inc  Improving Equipment Reliability using a CMMS/EAM Improving Equipment Reliability using a CMMS/EAM Ben Stevens, OMDEC Inc - IPAMC 2006

Transcript of Improving Equipment Reliability Using a CMMS-EAM com

8/8/2019 Improving Equipment Reliability Using a CMMS-EAM com

http://slidepdf.com/reader/full/improving-equipment-reliability-using-a-cmms-eam-com 1/9

www.ipamc.orgBen Stevens OMDEC Inc – 

Improving Equipment Reliability using a CMMS/EAM

Improving Equipment

Reliability using a CMMS/EAM

Ben Stevens, OMDEC Inc -

IPAMC 2006

8/8/2019 Improving Equipment Reliability Using a CMMS-EAM com

http://slidepdf.com/reader/full/improving-equipment-reliability-using-a-cmms-eam-com 2/9

www.ipamc.orgBen Stevens OMDEC Inc – 

Improving Equipment Reliability using a CMMS/EAM

CMMS/EAM EvolutionPhase 0 – Manual

operation, no

CMMS

Phase 1:

Automate Forms:

Work OrdersPurchase Orders

Issue slips

Time cards

Specifications

Project led by IT;

KPI’s are IT

efficiency,database type

35%

Phase 2:

Automate Processes:

Work Request/Work

Order

Work Order/ 

Material Issue

Work Order/ 

Purchasing

Project led by IT;

KPI’s are IT

efficiency,

database type,

degree of 

integration

40%

Phase 3:

Use of Workflow,

Work Management

Emergence of EAMMerge and

eliminate tasks

Streamline

functions

Project led by

Business Unit;

KPI’s are cost

reduction,materials usage

employee

productivity

20%

Phase 4:

Analysis,

Information,

Knowledge Base,

Integration with

intelligent agents

to improve the

quality of the

Maintenance Plan

Project led by

Maintenance;

KPI’s are equipment

reliability, number of failures, quality of 

maintenance, use of 

best practices

5%

8/8/2019 Improving Equipment Reliability Using a CMMS-EAM com

http://slidepdf.com/reader/full/improving-equipment-reliability-using-a-cmms-eam-com 3/9

www.ipamc.orgBen Stevens OMDEC Inc – 

Improving Equipment Reliability using a CMMS/EAM

Cost of Failure

Cost of Failure =

Cost of Repair +

Cost of Lost Revenue +Penalty Costs

8/8/2019 Improving Equipment Reliability Using a CMMS-EAM com

http://slidepdf.com/reader/full/improving-equipment-reliability-using-a-cmms-eam-com 4/9

www.ipamc.orgBen Stevens OMDEC Inc – 

Improving Equipment Reliability using a CMMS/EAM

Failure Costs

8/8/2019 Improving Equipment Reliability Using a CMMS-EAM com

http://slidepdf.com/reader/full/improving-equipment-reliability-using-a-cmms-eam-com 5/9

www.ipamc.orgBen Stevens OMDEC Inc – 

Improving Equipment Reliability using a CMMS/EAM

470,000

193,000

Run Risk

470:361 =1.3:1

193:40 =

5:1

Risk

Ratio

60 days

28 days

Failure

time

15%

25%

Failure

Probab

30 days

250,00061,000,000week20,000ukoTurbine

100,0000,000,0005 hours5,000iigata

Diesel

Failure

Cost

Repair

Risk

Outage

cost per

Hour

Repair

Time

Repair

Cost

Unit

The Risks of Equipment Failure

8/8/2019 Improving Equipment Reliability Using a CMMS-EAM com

http://slidepdf.com/reader/full/improving-equipment-reliability-using-a-cmms-eam-com 6/9

www.ipamc.orgBen Stevens OMDEC Inc – 

Improving Equipment Reliability using a CMMS/EAM

8/8/2019 Improving Equipment Reliability Using a CMMS-EAM com

http://slidepdf.com/reader/full/improving-equipment-reliability-using-a-cmms-eam-com 7/9

www.ipamc.orgBen Stevens OMDEC Inc – 

Improving Equipment Reliability using a CMMS/EAM

8/8/2019 Improving Equipment Reliability Using a CMMS-EAM com

http://slidepdf.com/reader/full/improving-equipment-reliability-using-a-cmms-eam-com 8/9

www.ipamc.orgBen Stevens OMDEC Inc – 

Improving Equipment Reliability using a CMMS/EAM

Cost

Time

Run

Risk 

Run

Risk 

Repair

Risk 

Repair

Risk 

Next Scheduled

Outage

Risk versus Time in Equipment

Failure

8/8/2019 Improving Equipment Reliability Using a CMMS-EAM com

http://slidepdf.com/reader/full/improving-equipment-reliability-using-a-cmms-eam-com 9/9

www.ipamc.orgBen Stevens OMDEC Inc – 

Improving Equipment Reliability using a CMMS/EAM

Aug 1 Sep 1 Oct 1 Nov 1

20

15

10

5

Maximum Acceptable

Level of risk 

Next Planned

shutdown date

Predicted Risk 

Ratio level

Risk Ratio

Equipment Failure Risk Ratio