IMPLEMENTATION OF THE UPGRADING OF INFORMAL …

20
IMPLEMENTATION OF THE UPGRADING OF INFORMAL SETTLEMENTS GRANT 2020/21 Department: Co-operative Governance, Human Settlements & Traditional Affairs Northern Cape Sustainable Human Settlements

Transcript of IMPLEMENTATION OF THE UPGRADING OF INFORMAL …

IMPLEMENTATION OF THE UPGRADING OF

INFORMAL SETTLEMENTS GRANT – 2020/21

Department:

Co-operative Governance, Human

Settlements &

Traditional Affairs

Northern Cape

Sustainable Human Settlements

PRESENTATION OUTLINE

o Programme Overview

o Provincial Context of Informal Settlements

o Regional Breakdown

o District Segmentation according to categories

o Institutional Arrangements

o Status quo on the Provision of Basic Services

o Programme Implementation Plan

o COVID 19 Interventions

o Grant allocations

o Conclusion2

Xxx ha

27.8%

Xxx ha

7.3%

Xxx ha

3.4%

PROVINCIAL CONTEXT

High

Low

Legend

ZF Mgcawu

NamakwaPixley Kaseme

Frances Baard

Informal Settlements

No of IS: 33 No of HH:: 12 158

No of IS: 43No of HH: 15 340

No of IS: 5 No of HH: 340 No of IS: 27

No of HH: 6 478

No of IS 43 No of HH: 16 637

Total No of Settlements

151

Total No of Households

55 329

John Taolo

Gaetsewe

PROGRAMME OVERVIEW

4

151

55329

113 113 380

10000

20000

30000

40000

50000

60000

Est. No of IS No. of HH Total IS CATEGORISED No. UGRADING PLANS No. of IS WITHOUT

UPGRADING PLANS

PROGRAMME OVERVIEW CONT.

5

A B1 B2 C TOTAL

No oF IS 30 84 30 7 151

No of HH 1134 34935 4266 411 40746

30 84 30 7 1511134

34935

4266

411

40746

CATEGORIES OF INFORMAL SETTLEMENTS

No oF IS No of HH

GRANT ALLOCATIONS

NUSP CATEGORIES TOTAL NO. OF SETTLEMENTS ALLOCATION

A 0 0

B1 9R94 290 859,00

B2 0 0

C 1 R1000 000,00

TOTAL 6R95 290 859,00

6

REGIONAL BREAKDOWN

CATEGORY FRANCES

BAARD

JOHN

TAOLO

ZF

MGCAWU

PIXLEY KA

SEME

NAMAKWA TOTAL

A 0 0 0 0 0 0

B1 2 0 4 3 0 9

B2 0 0 0 0 0 0

C 0 0 1 0 0 1

TOTAL 2 0 5 3 0 10

7

INSTITUTIONAL ARRANGEMENTS

INSTITUTION ROLES & RESPONSIBILITIES

COGHSTA o Compilation of HSDG business plan in

consultation with municipalities

o Funding of upgrading projects

o Monitoring the implementation of UISP

o Title deeds administration

o Beneficiary administration in partnership with

municipalities

o Construction of top structures

HDA o Technical support to COGHSTA and local

municipalities

o Implementation support on key settlements

o Land acquisition for IS upgrading

MUNICIPALITIES o Provision of temporary and interim services

o Provision of other municipal services

o Land tenure administration

o Beneficiary administration

o Town planning in certain projects

8

1

Municipality Settlement

Name

Water Sanitation Solid Waste

Removal

Area

Lighting

Health

Services

Access

Provision

Socio-

Economic

Status

Any Other

Service

Provided

Coordinates

and HH

numbers

Kgatelopele Danielskuil Adjacent

standpipes

within a 5

Km radius

Conventional

sanitation

within a 5 Km

radius

Adjacent

collection

once a week

High mast Clinic within

a 5Km radius

Gravel road Police station,

primary &

secondary

schools,

community

hall & library

within a 5Km

radius

Awaiting

response

from Public

Works to

purchase

the

property.

The no of

HH is

2 500

Sol Plaatje Ivory Park

1175

Standpipes

within a

2Km radius

Conventional

sanitation

within a 2 Km

radius

Adjacent

collection

once a week

High mast Clinic within

a 2Km radius

Gravel road Police station,

primary &

secondary

schools,

community

hall & library

within a 1 Km

radius

Contractor

appointed.

The no of

HH is 1175

Phokwane Ganspan

531

Standpipes

within a

2Km radius

Conventional

sanitation

within a 2 Km

radius

Adjacent

collection

once a week

High mast Clinic within

a 2Km radius

Gravel road Police station,

primary &

secondary

schools,

community

hall & library

within a 3 Km

radius

Contractor

appointed.

The no of

HH is 531

STATUS QUO ON PROVISION OF BASIC

SERVICES

1

Municipality Settlement

Name

Water Sanitation Solid Waste

Removal

Area

Lighting

Health

Services

Access

Provision

Socio-

Economic

Status

Any Other

Service

Provided

Coordinates

and HH

numbers

Dawid Kruiper Makweta

500

Adjacent

standpipes

within a 1

Km radius

Conventional

sanitation

within a 1 Km

radius

Adjacent

collection

once a week

High mast Clinic within

a 1Km radius

Gravel road Police station,

primary &

secondary

schools,

community

hall & library

within a 1Km

radius

Contractor

appointed.

The no of

HH is 500

Dawid Kruiper Pabalelo

North East

980

Adjacent

standpipes

within a 1

Km radius

Conventional

sanitation

within a 1 Km

radius

Adjacent

collection

once a week

High mast Clinic within

a 1Km radius

Gravel road Police station,

primary &

secondary

schools,

community

hall & library

within a 1Km

radius

Contractor

appointed.

The no of

HH is 980

Dawid Kruiper Smarties

234

Adjacent

standpipes

within a 1

Km radius

Conventional

sanitation

within a 1 Km

radius

Adjacent

collection

once a week

High mast Clinic within

a 1Km radius

Gravel road Police station,

primary &

secondary

schools,

community

hall & library

within a 1Km

radius

Contractor

appointed.

The no of

HH is 234

STATUS QUO ON PROVISION OF BASIC

SERVICES CONT.

1

Municipality Settlement

Name

Water Sanitation Solid Waste

Removal

Area

Lighting

Health

Services

Access

Provision

Socio-

Economic

Status

Any Other

Service

Provided

Coordinates

and HH

numbers

Kai Garib Gamakor

1500

Adjacent

standpipes

within a

3Km radius

Conventional

sanitation

within a 3 Km

radius

Adjacent

collection

once a week

High mast Clinic within

a 3Km radius

Gravel road Police station,

primary &

secondary

schools,

community

hall & library

within a 3Km

radius

Contractor

appointed.

The no of

HH is 1500

Emthanjeni Britstown Adjacent

standpipes

within a 3

Km radius

Bucket system Adjacent

collection

once a week

High mast Clinic within

a 3 Km

radius

Gravel road Police station,

primary &

secondary

schools,

community

hall & library

within a 3 Km

radius

Contractor

appointed.

The no of

HH is 500

Thembelihle Goutrou Adjacent

standpipes

within a 1

Km radius

Conventional

sanitation

within a 1 Km

radius

Adjacent

collection

once a week

High mast Clinic within

a 1Km radius

Gravel road Police station,

primary &

secondary

schools,

community

hall & library

within a 1Km

radius

Contractor

appointed.

The no of

HH is 500

STATUS QUO ON PROVISION OF BASIC

SERVICES CONT.

1

Municipality Settle

ment

Name

Water Sanitatio

n

Solid

Waste

Removal

Area

Lightin

g

Health

Services

Access

Provisio

n

Socio-

Economic

Status

Any

Other

Service

Provided

Coordin

ates and

HH

number

s

Siyancuma Breipal

500

Adjace

nt

standpi

pes

within

a 1Km

radius

Conventi

onal

sanitatio

n within a

2 Km

radius

Adjacent

collection

once a

week

High

mast

Clinic

within a

5Km

radius

Gravel

road

Police

station,

primary &

secondary

schools,

communit

y hall &

library

within a

5Km

radius

Contract

or

appoint

ed.

The no

of HH is

500

STATUS QUO ON PROVISION OF BASIC

SERVICES CONT.

1

Municipality Settlement Land

Feasibili

ty

Settleme

nt Plan

Land

Status

Layout

Status

General

Plan

Output

For

2020/21

Budget Progress

Sol Plaatje Ivory Park 1175 Yes Yes Municipalit

y

Approved Approved Water &

sanitation

R11 891

500

Contractor on site

Water supply: 0

Sewer network: 0

Storm water 0

Phokwane Ganspan 531 Yes Yes Municipalit

y

Approved Approved Water &

sanitation

R20

627874

Contractor on site

Water supply: 0

Sewer network: 0

Storm water 0

Dawid Kruiper Makweta 500 Yes Yes Municipalit

y

Approved Approved Water &

sanitation

R11 588

466

Contractor on site

Water supply: 0

Sewer network: 0

Storm water 0

Dawid Kruiper Pabalelo North

East 980

Yes Yes Municipalit

y

Approved Approved Water &

sanitation

R3 603

393,36

Contractor on site

Water supply: 0

Sewer network: 0

Storm water: 0

Dawid Kruiper Smarties 234 Yes Yes Municipalit

y

Approved Approved Water &

sanitation

R20 116

000

Contractor on site

Water supply: 0

Sewer network: 0

Storm water: 0

PROGRAMME IMPLEMENTATION PLAN –

CATEGORY B1

1

Municipality Settlement Land

Feasibili

ty

Settleme

nt Plan

Land

Status

Layout

Status

General

Plan

Output

For

2020/21

Budget Progress

Kai Garib Gamakor 1500 Yes No Municipalit

y

Approved Not

approved

Water &

sanitation

R7000

000

Contractor on site

Water supply: 0

Sewer network: 0

Storm water 0

Emthanjeni Britstown Yes No Municipalit

y

Not

Approved

Not

Approved

Registere

d

township

R2000

000

Service provider

on site

Town planning in

progress

Thembelihle Goutrou Yes No Municipalit

y

Not

Approved

Not

Approved

Registere

d

township

R2000

000

Service provider

on site

Town planning in

progress

Siyancuma Breipal 500 Yes Yes Municipalit

y

Approved Approved Water &

sanitation

R15 463

626

Contractor on site

Water supply: 0

Sewer network: 0

Storm water 0

PROGRAMME IMPLEMENTATION PLAN –

CATEGORY B1 CONT.

1

Municipality Settlement Land

Feasibili

ty

Settleme

nt Plan

Land

Status

Layout

Status

General

Plan

Output

For

2020/21

Budget Progress

Kgatelopele Danielskuil No No Public

works

Not

approved

Not

approved

Feasibility

study

R1000

000

Awaiting response

from Public Works

for the purchase

of the land

PROGRAMME IMPLEMENTATION PLAN –

CATEGORY C

Municipality

Settlement

Planned

Intervention Timeframe Budget Progress Outstanding

Outputs

Comment

Phokwane Nkandla Supply &

installation of 15

10 000lt Water

Tanks

3 weeks R1 140 903.50 15 water tanks

supplied & installed

None None

Phokwane Nkandla Supply &

installation of

500 VIP toilets

3 weeks R9 801 519.00 Excavations: 500

Tops: 340

Bottoms: 370

Accessories: 340

Tops: 160

Bottoms: 130

Accessories:

160

None

Sol Plaatje Lerato Park Installation of 50

Temporary

Communal Water

Supply

3 weeks R3 968 991.16 50 temporary

communal water

taps completed

None None

PROGRAMME IMPLEMENTATION PLAN –

COVID19 INTERVENTIONS

1

Municipality Settlement Number of

Households

Planned

Intervention

Sol Plaatje

Rhythm City

500

De-densification

of settlements by

construction of

Transitional

Reallocation

Areas

Lerato Park 5314

Gasegonyana Promise land 3600

Tsantsabane Postmasburg 4460

PROGRAMME IMPLEMENTATION PLAN –

COVID19 INTERVENTIONS

GRANT ALLOCATIONS

o HSDG: The grant did not reduce. R 319 888

000 was allocated.

o TRG: The grant was reduced by 65% from R 11

383 000 to R 3 940 000. The net result is that

the backlog will not be wiped.

18

CONCLUSION

1. COGHSTA, HDA, DHS & SISHAKA currently

updating the provincial strategy & pipeline;

2. The next step is to develop and update

upgrading plans for all settlements over and

above the initial 6 NUSP municipalities; and

3. Specific focus on prioritizing UISP projects

based on upgrading plans developed.

19

THANK YOU

RE A LEBOGA

ENKOSI

DANKIE

SIYABONGA

20