Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth...

20
Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager Deft, Inc. August, 2012

Transcript of Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth...

Page 1: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager

Implementation of Rare Earth Primers and Pretreatments

for Military Applications

Dr. Eric Morris Technical Manager

Deft, Inc.

August, 2012

Page 2: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager

Report Documentation Page Form ApprovedOMB No. 0704-0188

Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering andmaintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information,including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, ArlingtonVA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if itdoes not display a currently valid OMB control number.

1. REPORT DATE AUG 2012 2. REPORT TYPE

3. DATES COVERED 00-00-2012 to 00-00-2012

4. TITLE AND SUBTITLE Implementation of Rare Earth Primers and Pretreatments for Military Applications

5a. CONTRACT NUMBER

5b. GRANT NUMBER

5c. PROGRAM ELEMENT NUMBER

6. AUTHOR(S) 5d. PROJECT NUMBER

5e. TASK NUMBER

5f. WORK UNIT NUMBER

7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Deft, Inc.,17451 Von Karman Avenue,Irvine,CA,92614

8. PERFORMING ORGANIZATIONREPORT NUMBER

9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S)

11. SPONSOR/MONITOR’S REPORT NUMBER(S)

12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited

13. SUPPLEMENTARY NOTES ASETSDefense 2012: Sustainable Surface Engineering for Aerospace and Defense Workshop, August27-30, 2012, San Diego, CA. Sponsored by SERDP/ESTCP.

14. ABSTRACT

15. SUBJECT TERMS

16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT Same as

Report (SAR)

18. NUMBEROF PAGES

19

19a. NAME OFRESPONSIBLE PERSON

a. REPORT unclassified

b. ABSTRACT unclassified

c. THIS PAGE unclassified

Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18

Page 3: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager

Chrome-Free Primer Success

• F-35 JSF Program – Lockheed, Northrop, BAE – F-15’s, F-22’s, Apache’s, E3’s, T-45 (3 weeks)

Photo Courtesy of: http://www.jsf.mil/gallery/

Page 4: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager

Total NC Systems Flying • Spray Applied, Total Non-Cr Conversion Coating

USAF F-15 Fleet Royal Norwegian AF Sea King Trial

USAF C-130

Page 5: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager

RE System Performance Spirit’s Data

• Performance of RECC Systems

RECC/093 1000+ Hrs Spirit

RECC/NCP 2000 Hrs Spirit

RECC/093 2000 Hrs Deft

Page 6: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager

F-15 System Performance Battelle’s Data

F-15 System F-15 System

• System Testing – Comparison of N.S.S. to Beach Exposure

15 Months - Daytona 3000 N.S.S.

Page 7: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager

F-15 System Performance Battelle’s Data

• Comparison of NCr to RE Primer/APC – 15 Months Daytona

Non Cr6+ System F-15 System

Visible Oxidation No Visible Oxidation

Page 8: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager

F-15 System Performance Lockheed’s Data

• RECC 1015/3021/02GN093/99GY01

No Report of Change by LM During Exposure

Close-Up

Exposed in 2008

Page 9: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager

Non-Cr System For F-15’s

• Over 100 F-15’s Treated – T.O. 1F -15A-23

Page 10: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager

Technical Information

RECC deposits darker in areas of unpassivated / exposed metal (Areas of weakened passivation, rivets, abrasion, etc are conversion coated)

(Areas of previous passivation are reinforced for adhesion/max corrosion protection)

Page 11: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager

Benefits of Deft NC System • Rivet Rash on Singapore F-15

– Current Cr System

Page 12: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager

Benefits of Rare Earth NC System

No erosion observed No Rivet Rash

• No Erosion on Inlet/Rivet Rash Resolved • NOANG

Page 13: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager

C-130 Applications

• Second of Three USAF C-130’s

Photo Courtesy of Eric Morris

Page 14: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager

Deft RECC Application

• C-130 Robins AFB

Page 15: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager

Northrop Grumman Evaluation Candidate 2 – 1001, 3030XD, 3050X 14 Days NSS

Bare Al 2024-T3

Page 16: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager

Optical Microscope Characterization

• Self-Healing Characteristics – After 4 Days S.S.

– CeCC Al 2024-T3 At 50 X Magnification

Barrier Coating/No Healing Barrier and Self-Healing

Page 17: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager

Non-Chrome Conversion Coating Process

WASTE RINSE WATER

COLD DI WATER

IMMERSION RINSE

HOT DI WATER IMMERSION

RINSE

AQUEOUS DE GREASER

(BRULIN 81 5 GD)

Typical Immersion Conversion Coating Process

Deox

idiz

er

DI

WAT

ER

IMM

ERSI

ON

RIN

SE

DI

WAT

ER

IMM

ERSI

ON

RIN

SE

CO

NVE

RSIO

N C

OAT

ING

(A

LODI

NE

600)

DI

WAT

ER

IMM

ERSI

ON

RIN

SE

DI

WAT

ER

IMM

ERSI

ON

RIN

SE

HEATED HEATED HEATED

WASTE RINSE WATER WASTE RINSE WATER (Chromated)

WASTE RINSE WATER

BENEFITS • Eliminate HEATED Aqueous Cleaning Tank, Support GhG initiative. • Reduce the number of Tanks, reducing cycle time and waste rinse water. • Eliminate the use of CHROMATED conversion coating. Reduce chrome WASTE. • Safer Working Environment.

1 2 5 3 4 6 7 8 9 11 12 10

De

grea

se/D

EOXI

DIZE

R

(ALD

OX

V)

DI

WAT

ER

IMM

ERSI

ON

RIN

SE

DI

WAT

ER

IMM

ERSI

ON

RIN

SE

DI

WAT

ER

IMM

ERSI

ON

RIN

SE

O

ptio

nal S

eal

IMM

ERSI

ON

RIN

SE

1 2 3 5 6 4

AQUEOUS DEGREASER

(BRULIN 815 GD)

Deft Immersion Conversion Coating Process

Page 18: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager

Deft Clean 4000 Performance

• Deft Clean 4K brightens ferrous and non-ferrous parts

Treated Parts

Parts to be treated

Page 19: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager

Future Direction

• New NC System – Spray Applied Bare 2024 / 02-Type / Deft APC

Page 20: Implementation of Rare Earth Primers and Pretreatments for ... · Implementation of Rare Earth Primers and Pretreatments for Military Applications Dr. Eric Morris Technical Manager

Performance-Bottom Line

• Active Duty Environment – 200-400 F – Mach 2+

Photos Courtesy of Google images