Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354...
Transcript of Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354...
![Page 1: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/1.jpg)
Implementation of best practices to
reduce NRW in the Bahamas
Sofia KanellopoulouNRW Specialist
![Page 2: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/2.jpg)
The Bahamas
• 700 islands and over 2,000 rocks and cays
• Population 380,000• Capital: Nassau, New
Providence
![Page 3: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/3.jpg)
NASSAU, NEW PROVIDENCE
▪ Population: approx. 280,000 (70%)
▪ Area: 207 km2 (34 km x 11 km)
▪ Highest Elevation: 98 feet, approx. 30 m
▪ Water Supply Network: 1300 km
▪ Active Customers: 45,000
![Page 4: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/4.jpg)
Water Supply Situation in New Providence (The Bahamas) up to 2012:
▪ Over 90% of the water came from desalination plants
▪ NRW 58% (31,000 m3/day)
▪ Average water price: $2.7 per m3 compared to $0.3 per m3 in the U.S)
▪ For almost three decades Water & Sewerage Corporation (WSC) was coping with increasing levels of water losses.
▪ WSC realized that a long term comprehensive approach should be taken.
![Page 5: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/5.jpg)
Project Overview
10 years Performance Based Project (2012-2021):
holistic approach (design, implementation, and maintenance)
to deliver the results and to ensure maintaining the efficiency of the water network for the long term.
Project size: USD83 Million (USD51M financed by the IDB)
![Page 6: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/6.jpg)
TARGETS:
▪ To Reduce NRW to 2.5 MIGD (11,360 m3/day) by end of year 5 & To Increase average system pressure to 25 psi (1.72 bar)
▪ To Reduce NRW to 2.0 MIGD (9,090 m3/day) by end of year 7
▪ To Maintain NRW at 2 MIGD (9,090 m3/day) until the end of the project
![Page 7: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/7.jpg)
Strategy and action plan with respect to:
Project outline Baseline Survey
Data gathering, economical analysis, testing and surveys
Water Balance & NRW reduction Strategy Plan
Leak detection and
repair
DMA & Pressure
Management
Infrastructure replacement
Commercial losses (Illegal connections,
Meters)
NRW management
software (NETBASE)
![Page 8: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/8.jpg)
Baseline Survey
▪ 2011 NRW 29,990 m3/day:
– Significantly higher than the RFP (22,720 m3/day) - 2009
– average system pressure also higher – 24.6 psi (1.70 bar)
– N1 (pressure/leakage exponent) – 0.9
▪ 2013 NRW 31,220 m3/day (2012 water balance data)
– average system pressure also higher–25.1 psi (1.73 bar)
– N1 (pressure/leakage exponent) – 0.9
![Page 9: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/9.jpg)
Components of NRW Reduction Strategy (1)
▪ Introduction of improved materials for service connections and leak repairs
▪ Selective service line replacement – 15,000 services
▪ Disconnection of inactive services ~10,000
▪ Selective mains replacement – 25,000 feet (WSC)
▪ Large revenue meter right sizing, replacement
![Page 10: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/10.jpg)
Components of NRW Reduction Strategy (2)
▪ Advanced pressure management
– Control from critical point
– I2O controllers
▪ Replacement of all PRVs and bulk meters
▪ District metering (DMAs)
▪ Control of zone boundaries
▪ Netbase advanced network management
▪ Leak detection and repairs (2 surveys a year)
![Page 11: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/11.jpg)
Components of NRW Reduction Strategy (3)
▪ Clean, exercise system valves
▪ GSM data loggers
▪ Hydraulic modelling
▪ System optimization
▪ SCADA
▪ GIS data improvement
▪ Allocate customers to DMAs
▪ Water efficiency education – schools program
▪ Customer win-back program
![Page 12: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/12.jpg)
SCADA Implementation
▪ Installed at each WSC plant
▪ Control of Pumps
▪ Monitor pumps, flows, levels, pressures, power
▪ SCADA servers installed in WSC Control Room and in Miya project office (read only)
![Page 13: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/13.jpg)
Netbase – Distribution Management System
✓ Network Information
✓ Configuration Tool
✓ LATIS
✓ Sumdat
✓ Leakage and Water Balance
✓ Campaigns
✓ Events
✓ Levels of Service Pressure
✓ Hydraulic Modeling
✓ Area Performance
✓ Asset Performance
SAP-EAM (Work Order Data)
CSIS (Customer Complaints
GIS (Asset / Maps)
SAP (Billing)
CORPORATE
DATA SOURCE
DMA
BAs/ HAs Gauging Points
TIME SERIES
DATA
DATA WAREHOUSE
NETBASE Spatial Database (Loading,
Updating, Integration)
NETBASEAPPLICATIONS
•Near real-time monitoring of water resources and decision support toolto manage the network resources
•Data mining for leak detection and sensors for precise leak localization
![Page 14: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/14.jpg)
NRW reduction plan
6,876,42
5,97
4,87
3,77
2,5 2,5
2 2 2
0,45
1,55
2,65
3,653,92 3,92
4,42 4,42 4,42 4,42
25,1
21
22
2525
18
19
20
21
22
23
24
25
26
0
1
2
3
4
5
6
7
8
2013 2014 2015 2016 2017 2018 2019 2020 2021
NRW (Migd) NRW saving acumolative Average Annual Pressure (psi)
![Page 15: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/15.jpg)
WORKS
![Page 16: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/16.jpg)
Technical Works (2013-2017)
Activities Number of works
Replaced active service connections 17,077
Disconnections of inactive service connections
5,724
Leak repairs on mains 866
Total leaks repaired (ALC) 4,976
Pipes replaced by WSC due to heavy leakage (out of 52,000 ft proposed)
approx. 34,000 ft
![Page 17: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/17.jpg)
Pressure Zones/DMAs (2013-2016)
Activities Number
Pressure Zones 36
• PRVs 33
• Gravity Supplied 1
• Supplied directly by PS 2
DMAs 89
![Page 18: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/18.jpg)
Pressure Zones
![Page 19: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/19.jpg)
Separation into DMAs
![Page 20: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/20.jpg)
Replacement of Large Customers meters(Bulk meters 2” up to 6”)
▪ Replaced 47 old bulk meters with
ARAD ultrasonic meters (OCTAVE)
▪ High precision meter (according to MID R500, Q3/Q1=500)
▪ Body from stainless steel 316
▪ Check valve installed
![Page 21: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/21.jpg)
Intensive Leakage Detection
Causes of Leaks:
▪ Inappropriate materials
![Page 22: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/22.jpg)
▪ Bad installation (no specifications
followed, pipes very shallow, no
suitable bedding/backfilling materials)
▪ Lack of proactive
maintenance
![Page 23: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/23.jpg)
![Page 24: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/24.jpg)
![Page 25: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/25.jpg)
Leak Detection (1)
▪ 14 local staff recruited and trained by IWA Water Loss leak detection expert
▪ Team led by experienced local
leakage inspector (14+1)
▪ Work prioritized based on DMAs with highest leakage
▪ Illegal connections, stuck meters, missing meters, disconnected
services etc.
![Page 26: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/26.jpg)
Leak Detection (2)
▪ Difficulties in finding leaks due to
– Low pressure
– Plastic materials
– Heavy traffic (noise)
– Electric interference
▪ Methodology
– Sounding of meters
– Sounding of pipes and pinpointing the leaks
– Step testing to detect the areas of high leakage
– Gas detection (used) & tethered technology (investigator)
– 2 equivalent surveys of New Providence annually
![Page 27: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/27.jpg)
Results&
Conclusions (2018)
![Page 28: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/28.jpg)
P.Fanner, 2018
![Page 29: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/29.jpg)
Project is Delivering!
KPI 2013 2017
NRW m3/day 31,354 11,680
NRW % 57.8 26.3ILI - 27.5 8.1
NRW l/conn/day 670 236Real Losses I/conn/day 628 173Apparent Losses I/conn/day 42 63
Average Pressure bar 1.73 1.65P.Fanner, 2018
![Page 30: Implementation of best practices to reduce NRW in the Bahamas · KPI 2013 2017 NRW m3/day 31,354 11,680 NRW % 57.8 26.3 ILI-27.5 8.1 NRW l/conn/day 670 236 Real Losses I/conn/day](https://reader030.fdocuments.net/reader030/viewer/2022011910/5f7e94fae1922f453d6e3ffb/html5/thumbnails/30.jpg)
Project is Delivering!
▪ Exceeding initial performance targets
▪ Recovered from dangerous situation due to intermittent supply operation – 2013
– Pressure management savings reduced
▪ WSC pleased with progress
– Now have few breaks to repair!
– Remote control of pressures
– Improved customer service
– Improved infrastructure
– WSC now using the improved materials
– SCADA / Netbase