General data3
ITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy
Name of the School
ITIS MERLONI Hi h S h l
Type of school
ITIS MERLONI High School
Hi h S h lHigh School
Number of students Owner
public398
Location
Municipality of Fabriano (AN), ItalyL S l d'A i t 2
Year of construction
1968Largo Salvo d'Acquisto 2Altitude: 325 m AMSL
1968
4
General dataITIS “A M l i” Hi h S h l M i i li f F b i (AN) I l
Building typology Heated area (m2 )
ITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy
4 floors building 11549 m2
Heating degree days : 2198 (DPR 412/1993 – base 20)Cooling degree days (base 26): xxxxxxx
Site
Urban Mountain
5
Current SituationITIS “A M l i” Hi h S h l M i i li f F b i (AN) I lITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy
6
Current Situation
Renovation needs Building use
ITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy
High Priority: energy efficiency + building facade safety + waterproofing in the roofSchedule for High school:
Standard Use: From 9th of September till 14th of June
High Priority: energy efficiency + building facade safety + waterproofing in the roof
Reduce Use: From 15th of June till 12th of August
From 19th of August till 6th of September
2nd, 3rd, 4th of January
12th, 16th of April
23rd, 24th, 27th, 30th , 31st of December
Main Building: Monday till Friday: 07:30 to 22:30
Saturday: 07:30 to 14:00
Gymnasium: Monday till Friday: 07:00 to 13.30 and 16:00 to 21:00
Saturday: 07:30 to 13:30
7
Current SituationITIS “A M l i” Hi h S h l M i i li f F b i (AN) I l
Building envelope: WallsBrick Wall with air gap
ITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy
Building envelope: RoofRoof without Insulation insulation
Building envelope: GroundfloorGround floor consists of concrete
Building envelope: WindowsReplacement in Summer 2015 in 4 facades
Old window: Single‐glazed windows with wooden framesUw = 5.9 W/m².K/
New window: Aluminium Frame with thermal break ‐ Low‐e Double Glazed (Argon 16 mm)Uw = 1.1 W/m².K
8
Current SituationITIS “A M l i” Hi h S h l M i i li f F b i (AN) I lITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy
Building envelope: WindowsR l t i S 2015 i f dReplacement in Summer 2015 in some facades
Old window: Single‐glazed windows with wooden framesUw = 5.9 W/m².K
N i d Al i i F ith th l b k L3
4
New window: Aluminium Frame with thermal break ‐ Low‐e Double Glazed (Argon 16 mm)
Uw = 1.1 W/m².K
1
2
1
1
2 3
9
Current SituationITIS “A M l i” Hi h S h l M i i li f F b i (AN) I lITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy
10
Current Situation
Airtightness: No measurements
ITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy
Heating/Cooling: Radiators, manual control, no sectors
V til ti N h i l V til tiVentilation: No mechanical VentilationVentilation by opening windows
Lighting: Fluorescent tubes T8 controlled by users
Appliances: Lab: PC, Projector, PrinterOffice: PC, Printer, Copy Machine
DHW: Not available
Cooking: No cooking
Current final energy consumption kWh/m2 conditioned area (from
*111.56 kWh/m² y for heating*12 51 kWh/m² y for electricitykWh/m2 conditioned area (from
bills, metering etc.):
12.51 kWh/m y for electricity*Total =124.08 kWh/m² per year
11
Current Situation
Equipment Age and Maintenance Needs
ITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy
Lighting : Fluorescent lamp T8 : continuous replacement.
HVAC/ B il 1 N t l G B il i t ll d i 1982 2 N t l G B il l d i 2010HVAC/ Boiler: 1 Natural Gas Boiler installed in 1982, 2 Natural Gas Boiler replaced in 2010
HVAC/Distribution Network:
HVAC/other components
HVAC/other components
Windows Completion of replacement is needed
Other Building Components
Other Maintenance NeedsOther Maintenance Needs
Other Renovation Needs Structural Compliance to be assessed, developed and executed
12
Current Situation
Health & Comfort
ITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy
Summer comfort: No data
I t i i lit N d tInterior air quality: No data
Visual comfort: No data
Running Contracts and Management
Running cost: Energy (2013): 109557 (G)+28130 (E) = 137.687 €Water: no dataMaintenance: no data
Energy Supply Contract CONSIP – Ministerial Central Society for PA SupplyingContract expiring in November 2016
Energy Management Contract CONSIP – Ministerial Central Society for PA SupplyingContract expiring in November 2016
M d di l b h P i h i l ffiBuilding Maintenance Managed directly by the Province technical office
13NZEB RenovationITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy
ZEMedS Goals: ‐ Requeriment 1: CPE‐ProdRES≤ 0
Primary energy consumption yearly (heating, cooling, ventillation, DHW and lighting) is produced bylocal renewable energieslocal renewable energies.
‐ Requeriment 2: CFE≤ 25 kWh/m2 y
FE consumption yearly (heating, cooling, ventillation and lighting) per conditioned area
‐ Requeriment 3: Indoor air quality guaranteed (CO2≤1000 ppm) and temperature above 28ºC ≤40 hours yearly during occupancy
National factors for conversion in energy and CO2 have been taken into account (data 2014).gy 2 ( )
Primary Energy from non‐renewable energy sources covered by rene able energ
Final energy consumption (all uses except DHW & cooking)
Overheating limited toIndoor Environmental
Quality (IEQ) is guaranteedrenewable energy
0
p g) g
0 kWh/m².year
(annual balance)
CFE ≤ 25 kWh/m².year
40 hours over 28ºC annually
CO2 ≤ 1000 ppm
14NZEB Renovation StatusITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy
Actual status refering to the the foreseen ZEMedS Renovation Process
Diagnostic/Current Planning Design Companies Works Reception Use and /Currentsituation
Planning Design consulting Works of works maintenance
Diagnostic/ Current Situtation:An extended energy audit (including at least a basic environmental monitoring) is needed in order to collectAn extended energy audit (including at least a basic environmental monitoring) is needed, in order to collect detail information.
15Energy Saving PotentialITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy
Actual Final Energy Consumption ZEMedS Targetgy p(heating, cooling, ventillation and lighting)
Consumption by Bills (data before Windows Replacement)Final energy
consumption (all uses
ZEMedS Target
Consumption by Bills (data before Windows Replacement)Natural Gas: 123.368 nm3/year = 111.56 kWh/m².yearElectricity: 12.51 kWh/m².yearOther Fuel: 0 kWh/m² year
p (except DHW & cooking)
CFE ≤ 25 kWh/m² yearOther Fuel: 0 kWh/m .year
Total: 124.08 kWh/m².year
Estimation:
kWh/m .year
Heating/Cooling and Ventilation: Estimation:
Specific Electricity Consumption (not including Lighting): 11 kWh/m².yearDomestic Hot Water Consumption: 1 kWh/m².yearExpected Total Consumption after successful ZEMedS Renovation:
CHVAC ≤ 20 kWh/m².year
Lighting: Cligh ≤ 5 kWh/m².year
Expected Total Consumption after successful ZEMedS Renovation: 37 kWh/m².year
Energy Saving Potential(heating, cooling, ventillation and lighting)
Theoretical Saving87.08 kWh/m².year
Theoretical Gain70 %
16Energy Saving PotentialITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy
Actual Final Energy Consumption ZEMedS Targetgy p(heating, cooling, ventillation and lighting)
Consumption by Bills (data before Windows Replacement)Final energy
consumption (all uses
ZEMedS Target
Consumption by Bills (data before Windows Replacement)Natural Gas: 123.368 nm3/year = 1.288.455 kWh/yearElectricity: 144.531 kWh/yearOther Fuel: 0 kWh/year
p (except DHW & cooking)
CFE ≤ 25 kWh/m² yearOther Fuel: 0 kWh/year
Total: 1.432.987 kWh/year
Estimation:
kWh/m .year
Heating/Cooling and Ventilation: Estimation:
Specific Electricity Consumption (not including Lighting): 127.039 kWh/yearDomestic Hot Water Consumption: 11.549 kWh/yearExpected Total Consumption after successful ZEMedS Renovation:
CHVAC ≤ 20 kWh/m².year
Lighting: Cligh ≤ 5 kWh/m².year
Expected Total Consumption after successful ZEMedS Renovation: 427.313 kWh/year
Energy Saving Potential(heating, cooling, ventillation and lighting)
Theoretical Saving1.005.674 kWh/year
Theoretical Gain70 %
17Renewable Energy Source PotentialITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy
System Considerations and Recommendation PotentialSystem Considerations and Recommendation PotentialProduction
Photo VoltaicS
Flat Roof, south oriented panels125 kW ( b 3000 2 f f f )
13.2 kWh/ ²System 125 kWp (about 3000 m2 of roof surface) kWh/m².year
Solar Thermal for DHW
XX kWh/m².yearfor DHW kWh/m .year
RES Heat Pump XX kWh/m².year
Others
RES Potential RES Production Potential13.2 kWh/m².year
18Recommended MeasuresITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy
Lighting System ReplacementReplacement
E Building
NOW Use and management
Demandreduction
Energyefficientsystems
Renewable energysupply
u d gManagement System
NZEB
PV System on the Gym Roof
Windows Replacementy
Heating: Functional Sectors and Level Sectors managed by BMSLighting: Presence Control
19Recommended MeasuresITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy
Measure Why is recommended and whatMeasure Why is recommended and what
Windows Replacementb l d
Very poor performance windows are still present, theyd b l d i h lto be completed need to be replaced with low‐e ones.
Photovolatic System Further Electric Energy Production
Building ManagementSystem
For reducing energy waste and optimizing usageefficinecy
Lighting Replacementand Management System
Very poor lighting system is deployed. Luminaires needto be replaced and a management system integrated.
Syste
20Specific Features and RemarksITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy
f kSpecific Remarks
The school has a lot of “evening courses”, thus it is opened till night.
There are a lot of glazed facades. Windows Replacement was started in 2015 with 4 facades. It needs to be completed.
Seismic Compliance needs to be assessed. After the assessment works could be needed.
21Funding OpportunitiesITIS “A. Merloni” High School, Municipality of Fabriano (AN), Italy
l f iRelevant Information:• Until the Energy Supplying and Management Contract are managed through
CONSIP (Ministerial Central Society for PA Supplying and Purchasing), the ESCOs cannot be involved in the funding mechanism
Funding Potential:g• Self funding: no • Regional Initiatives:
– DGR 124 02 03 2015 – Regional Government Criteria for getting Ministerial Fund “3‐year PlanningDGR 124 02.03.2015 Regional Government Criteria for getting Ministerial Fund 3 year Planning for School Buildings” (art.10 Law 128/2013, DM 23.01.2015, also known as “IEB loan decree”
– ERDF – Thematic Objective 4 – Action 13.1 Promozione dell’eco‐efficienza e riduzione di consumi di energia primaria negli edifici e strutture pubbliche
• National Funding:
• European Direct Funding: