IMPEC BAMBOO INSTALLTION MANUAL€¦ · 2016. 3. 30. · “Impec’Bamboo”’...

8
“Impec Bamboo” The Ultimate Bamboo Flooring IMPEC BAMBOO INSTALLTION MANUAL Please Read The Following Instruction Carefully Before Begin To Install Your Floor Thank You For Purchasing IMPEC BAMBOO General Info: The following guidelines and instructions provided by “IMPEC BAMBOO” are to act solely as a reference guide. We strongly recommend you read carefully IMPEC BAMBOO’s installation, warranty and other necessary documentations before beginning to install your floor. Please also follow the National Wood Flooring Association (NWFA) Installation guidelines prior to installation. Things To know: All Impec Bamboo products are quality inspected and reviewed before manufacturing packaging and shipping. Always consider adding an additional 8%10% square footage of your purchased floor for cutting waste and grading allowance. Impec Bamboo products are manufactured under strict guidelines and standards from both the company and the industry; as a result, manufacturing, grading irregularity and natural deficiencies should not be exceeding more than 5%. If more than 5% of your purchased flooring is unusable, do not install the floor. Immediately contact the distributor/retailer from which the flooring was purchased and seek for replacement. Installation of any Impec Bamboo product acts and serves, as an acceptance of the product; moreover, NO claims would be accepted for materials with visible defects once the floor has been installed. Bamboo is a natural product that is characterized by distinctive variations in grain, pattern and color. These natural variations that may occur between individual flooring planks are neither defects nor flaws; but speaks the natural beauty of bamboo. As a result, such occurrence should be expected. It is the installer/Owner’s responsibility to inspect both the environment as well as all flooring before installation. Do not install Impec Bamboo floorings in any types of environment that are subject to high steam, temperature, humidity or excessive moisture. Prior to installation, installer and owner must define if the jobsite meets or exceeds the National Wood Flooring Association applicable guidelines. Impec Bamboo does not warrant any types of failure or deficiencies of flooring resulting from jobsite conditions or environment, nor improper storage. Bamboo, like other wood floors, changes its shape or form naturally with the absorption or release of moisture. Therefore, balancing and controlling the moisture content level is the most significant factor for bamboo flooring. It is up to the enduser’s responsibility to deliver and maintain the appropriate recommended humidity levels range of 40%60%. All Impec Bamboo products should be allowed to acclimate for at least 72 120 hours (35 days) to allow flooring to adjust the room temperature and humidity. However, if the products were to be installed in areas with higher humidity such as Florida or Arizona, acclimate your flooring for at least 78 day period. Do not place the flooring over concrete or carpet during the acclimation period without

Transcript of IMPEC BAMBOO INSTALLTION MANUAL€¦ · 2016. 3. 30. · “Impec’Bamboo”’...

Page 1: IMPEC BAMBOO INSTALLTION MANUAL€¦ · 2016. 3. 30. · “Impec’Bamboo”’ The’Ultimate’Bamboo’Flooring’ ’ laying’down’an’acceptable’moisture’barrier.’After’the’right’acclimation’period

“Impec  Bamboo”  The  Ultimate  Bamboo  Flooring  

 

   

IMPEC  BAMBOO  INSTALLTION  MANUAL  Please  Read  The  Following  Instruction  Carefully  Before  Begin  To  Install  Your  Floor  

Thank  You  For  Purchasing  IMPEC  BAMBOO    General  Info:    The  following  guidelines  and  instructions  provided  by  “IMPEC  BAMBOO”  are  to  act  solely  as  a  reference  guide.  We  strongly  recommend  you  read  carefully  IMPEC  BAMBOO’s  installation,  warranty  and  other  necessary  documentations  before  beginning  to  install  your  floor.  Please  also  follow  the  National  Wood  Flooring  Association  (NWFA)  Installation  guidelines  prior  to  installation.        Things  To  know:    All  Impec  Bamboo  products  are  quality  inspected  and  reviewed  before  manufacturing  packaging  and  shipping.  Always  consider  adding  an  additional  8%-­‐10%  square  footage  of  your  purchased  floor  for  cutting  waste  and  grading  allowance.    Impec  Bamboo  products  are  manufactured  under  strict  guidelines  and  standards  from  both  the  company  and  the  industry;  as  a  result,  manufacturing,  grading  irregularity  and  natural  deficiencies  should  not  be  exceeding  more  than  5%.  If  more  than  5%  of  your  purchased  flooring  is  unusable,  do  not  install  the  floor.  Immediately  contact  the  distributor/retailer  from  which  the  flooring  was  purchased  and  seek  for  replacement.  Installation  of  any  Impec  Bamboo  product  acts  and  serves,  as  an  acceptance  of  the  product;  moreover,  NO  claims  would  be  accepted  for  materials  with  visible  defects  once  the  floor  has  been  installed.    Bamboo  is  a  natural  product  that  is  characterized  by  distinctive  variations  in  grain,  pattern  and  color.  These  natural  variations  that  may  occur  between  individual  flooring  planks  are  neither  defects  nor  flaws;  but  speaks  the  natural  beauty  of  bamboo.  As  a  result,  such  occurrence  should  be  expected.      It  is  the  installer/Owner’s  responsibility  to  inspect  both  the  environment  as  well  as  all  flooring  before  installation.  Do  not  install  Impec  Bamboo  floorings  in  any  types  of  environment  that  are  subject  to  high  steam,  temperature,  humidity  or  excessive  moisture.  Prior  to  installation,  installer  and  owner  must  define  if  the  jobsite  meets  or  exceeds  the  National  Wood  Flooring  Association  applicable  guidelines.  Impec  Bamboo  does  not  warrant  any  types  of  failure  or  deficiencies  of  flooring  resulting  from  jobsite  conditions  or  environment,  nor  improper  storage.    Bamboo,  like  other  wood  floors,  changes  its  shape  or  form  naturally  with  the  absorption  or  release  of  moisture.  Therefore,  balancing  and  controlling  the  moisture  content  level  is  the  most  significant  factor  for  bamboo  flooring.  It  is  up  to  the  end-­‐user’s  responsibility  to  deliver  and  maintain  the  appropriate  recommended  humidity  levels  range  of  40%-­‐60%.    All  Impec  Bamboo  products  should  be  allowed  to  acclimate  for  at  least  72-­‐120  hours  (3-­‐5  days)  to  allow  flooring  to  adjust  the  room  temperature  and  humidity.  However,  if  the  products  were  to  be  installed  in  areas  with  higher  humidity  such  as  Florida  or  Arizona,  acclimate  your  flooring  for  at  least  7-­‐8  day  period.  Do  not  place  the  flooring  over  concrete  or  carpet  during  the  acclimation  period  without  

Page 2: IMPEC BAMBOO INSTALLTION MANUAL€¦ · 2016. 3. 30. · “Impec’Bamboo”’ The’Ultimate’Bamboo’Flooring’ ’ laying’down’an’acceptable’moisture’barrier.’After’the’right’acclimation’period

“Impec  Bamboo”  The  Ultimate  Bamboo  Flooring  

 

laying  down  an  acceptable  moisture  barrier.  After  the  right  acclimation  period,  acceptable  2-­‐3%  differentiation  between  the  floor  and  the  sub-­‐floor  would  be  the  sign  that  your  new  floor  is  ready  to  be  installed.    Impec  Bamboo  Click  products  requires  T-­‐Molding  transitions  to  be  installed  in  areas  between  adjoining  rooms,  hallways,  and  at  ALL  doorways  to  allow  for  normal  independent  floor  movement  and  environmental  fluctuations.    **Failure  to  meet  this  requirement  may  result  in  numerous  problematic  issues  such  as  floor  buckling,  floor  cupping,  floor  tenting,  floor  separation,  floor  shrinkage,  which  can  void  your  warranty  coverage.      Installing  T-­‐Moldings:  (Glue  one  side,  Let  other  side  float)  Introducing  T-­‐Moldings  between  each  room  is  extremely  critical  for  floating  installation  in  order  to  gain  expansion  spaces.    T-­‐Moldings  are  mandatory  in  doorways  to  join  two  bamboo  floors  in  adjoining  rooms.  Have  adhesive  applied  on  one  side  of  the  flooring  and  leave  the  other  side  glue  less  in  order  to  have  the  flooring  to  float  freely.    

   Installing  Quarter-­‐Rounds:  The  quarter-­‐rounds  molding  serves  a  very  important  purpose.  It  covers  the  gap  between  the  baseboard  on  the  wall,  and  the  new  flooring.  When  nailing  the  Quarter-­‐Rounds,  it  is  preferred  to  use  2”  –  2-­‐1/2”  long  nail  right  through  the  quarter  rounds  and  through  the  bottom  of  the  baseboard.  

   Jobsite  Requirement:    Before  beginning  the  installation  process,  it  is  the  installer/Owner’s  responsibility  to  inspect  both  the  environment  as  well  as  all  flooring  before  installation.  Installer  and  owner  must  define  if  the  jobsite  meets  or  exceeds  the  National  Wood  Flooring  Association  applicable  guidelines.  Do  not  install  Impec  Bamboo  floorings  in  any  types  of  environment  that  are  subject  to  high  steam,  temperature,  humidity  or  excessive  moisture.  

Page 3: IMPEC BAMBOO INSTALLTION MANUAL€¦ · 2016. 3. 30. · “Impec’Bamboo”’ The’Ultimate’Bamboo’Flooring’ ’ laying’down’an’acceptable’moisture’barrier.’After’the’right’acclimation’period

“Impec  Bamboo”  The  Ultimate  Bamboo  Flooring  

 

Moreover,  make  sure  the  room  reaches  a  consistent  temperature  and  be  sure  to  eliminate  the  placement  of  the  flooring  on  any  types  of  area  that  may  have  lack  of  moisture  protection.      It  is  the  Installer/Owner’s  responsibility  to  record  and  document  all  necessary  information  such  as  jobsite  conditions,  installation  date,  and  moisture  level/humidity  level/temperature  of  the  site,  flooring  moisture  content,  and  sub-­‐floor  moisture  content.  The  installer  must  carefully  and  correctly  record  these  information;  and  the  property  owner  must  keep  these  information  as  a  permanent  record.  Please  visit  NWFA’s  Jobsite  Checklist  for  a  complete  list  to  address  prior  to  installation.      Subfloor  Requirements:    Some  of  the  general  important  requirements  that  is  mandatory  are:  

• It  must  be  structurally  sound  • It  must  be  clean  and  leveled.    • Must  be  dry  all  year  round.  (On  average,  the  subfloor  should  not  exceed  more  than  12%  moisture  

testing  range)    Wood  Subfloor:  Wood  subfloor  must  be  securely  nailed  and  screwed  to  joists  for  minimal  movement.  If  the  subfloor  is  not  leveled,  sand  down  high  spots  and  fill  low  spots  with  an  underlayment  patch.  Wood  moisture  reading  should  not  exceed  11%;  Test  bamboo  flooring  to  make  sure  moisture  content  to  be  within  3%  of  subfloor  moisture  content.      Concrete  Subfloor:  ALL  CONCRETE  MUST  BE  FULLY  CURED  AT  LEAST  FOR  60  DAYS.  Do  not  install  on  concrete  unless  it  is  free  from  dirt,  water,  oil,  paint  or  any  other  elements  that  might  prevent  the  area  to  be  dry  and  clean  year  round.      Acclimation  and  Conditioning  of  the  Flooring:    Bamboo  Flooring  is  hygroscopic,  its  size  and  shape  changes  with  the  absorption  and  release  of  moisture.  The  goal  of  acclimation  is  to  let  your  newly  purchased  flooring  to  fully  adjust  the  moisture  content  within  the  room  temperature.  That  is  why  fully  acclimating  your  floor  would  bring  the  best  ultimate  results  for  your  flooring’s  performance.      First,  acclimate  your  newly  purchased  flooring  in  the  areas  to  be  installed.  Allow  the  environment  to  have  a  consistent  indoor  humidity  levels  of  40%-­‐60%.    Bamboo  Flooring  acclimation  period  averagely  takes  about  3-­‐5  days  (72-­‐120hours)  to  acclimate.  However,  areas  with  extreme  high  or  low  moisture  content,  or  inconsistent  temperature,  acclimation  period  can  take  up  to  7  days  until  the  flooring  can  be  installed.      Do  not  place  the  flooring  over  concrete  or  carpet  during  the  acclimation  period  without  laying  down  an  acceptable  moisture  barrier.  After  the  right  acclimation  period,  acceptable  2-­‐3%  differentiation  between  the  floor  and  the  sub-­‐floor  would  be  the  SIGN  that  your  new  floor  is  ready  to  be  installed.    *  Please  do  not  install  bamboo  flooring  in  rooms  or  homes  that  are  not  climate  controlled.  Not  following  the  above  recommendation  can  result  in  numerous  issues  such  as  excessive  board  movement,  squeaks,  gapping,  separation,  floor  cupping  and  other  finishing  issues  that  can  negatively  impact  the  flooring.    

Page 4: IMPEC BAMBOO INSTALLTION MANUAL€¦ · 2016. 3. 30. · “Impec’Bamboo”’ The’Ultimate’Bamboo’Flooring’ ’ laying’down’an’acceptable’moisture’barrier.’After’the’right’acclimation’period

“Impec  Bamboo”  The  Ultimate  Bamboo  Flooring  

 

 Moisture  Testing:    Most  bamboo  flooring  failures  are  resulted  from  incorrect  measures  of  jobsite  moisture.  As  a  result,  the  goal  for  reaching  correct  moisture  content  is  for    

1. Determining  if  new  flooring  is  ready  to  be  installed;  2. Confirming  the  moisture  balance  between  new  floor  and  the  subfloor.    3. All  floor  planks  that  are  wider  than  3’’  should  be  no  more  than  2%  variance  in  

moisture  content  between  the  acclimated  bamboo  floor  and  subfloor.  Impec  Bamboo  floorings  can  have  an  acceptable  moisture  content  range  between  7%  minimum  and  11  %  maximum.  Moreover,  the  subfloor  moisture  range  must  not  exceed  12%.  As  a  result,  the  moisture  range  between  subfloor  and  bamboo  flooring  should  not  exceed  3%.  If  higher  moisture  readings  are  found  in  either  the  subfloor  or  bamboo  flooring,  extend  acclimation  time  and  increase  ventilation  until  acceptable  numbers  are  reached.      *  Please  note  that  test  results  are  only  applicable  the  day  of  testing  and  may  vary  and  fluctuate  with  seasonal  and  climate  changes.  Use  moisture  barrier  is  MANDATORY  for  all  installations.  Impec  Bamboo  does  not  warrant  against  moisture  related  problems.      For  the  best  accuracy  reading,  Impec  bamboo  recommends  the  installer  to  use  “Klortner”  moisture  meter,  model  “KT-­‐50  Scanner”  to  examine  all  Impec  Bamboo  strand  woven  moisture  level.    

 Moreover,  moisture  meters  such  as  “Tramex”,  ‘’Delmhorst’’  also  have  adjustable  species  settings  including  bamboo  flooring.  Always  contact  the  meter  testing  company  for  proper  settings  in  order  to  obtain  the  most  accurate  number  measurements.      Wood  Subfloor:  Use  moisture  meter  to  test  wood  subfloor  prior  to  installation.  If  the  result  shows  moisture  vapor  at  or  exceeding  9%,  correct  the  problem  to  reach  the  acceptable  percentage.  Always  install  your  floor  with  a  vapor  barrier  underlayment.      Underlayment:  Impec  Bamboo  requires  all  jobs  to  have  moisture  barrier  underlayment.  Impec  Bamboo  provides  a  private-­‐labeled  “Impec-­‐Underlay”  which  consist  a  3mm  moisture  and  sound  barrier.    Impec-­‐Underlay  has  an  IIC  of  “73”  and  STC  of  “72”;  Its  density  has  a  9.4  lbs./ft3.  

For  the  best  accurate  moisture  reading,  please  set  Density  level  to  “Level  5,  1.0  g/cm2”  

Page 5: IMPEC BAMBOO INSTALLTION MANUAL€¦ · 2016. 3. 30. · “Impec’Bamboo”’ The’Ultimate’Bamboo’Flooring’ ’ laying’down’an’acceptable’moisture’barrier.’After’the’right’acclimation’period

“Impec  Bamboo”  The  Ultimate  Bamboo  Flooring  

 

Compression  resistance:   @  25%:  17.8psi           @  30%:  29.3psi           @  50%:  168.6psi        Concrete  Subfloor:  Moisture  vapor  pressure  needs  to  be  checked  in  numerous  different  places  on  the  concrete  subfloor  with  consistent  number  reading  results.  Tramex  Concrete  Moisture  Encounter:  Moisture  readings  should  not  exceed  4.5%  on  the  upper  scale.      After  your  newly  purchased  flooring  have  been  delivered,  make  sure  to  open  each  and  every  boxes  and  layout  every  plank  in  a  “Criss-­‐Cross”  pattern  in  order  for  every  plank  to  receive  the  best  possible  air  flow  and  to  ultimately  achieve  the  best  acclimation  results.      

   Start  Out  With  Multiple  Planks:  Bamboo  flooring  is  a  natural  product  which  you  should  expect  some  natural  color  variations.  Therefore,  it  is  up  to  the  owner’s  decision  on  the  color  layout  of  the  floor.  The  color  and  pattern  of  the  planks  can  be  controlled  and  ultimately,  the  best  way  is  to  mix  cartons/boxes  of  flooring  to  create  a  nature/earthy  random  layout  effect.    **  Impec  Click  Bamboo  can  be  installed  in  both  “Floating”  and  “Glue-­‐Down”  methods.  It  is  ultimately  the  owners’  responsibility  to  decide  which  methods  is  the  most  suitable.  However,  for  homeowners  who  have  longer  runs  of  flooring,  [More  than  30  Feet],  the  best  installation  method  is  glue-­‐down.  On  the  other  hand,  if  the  “runs”  of  the  flooring  are  shorter  than  30  feet,  both  methods  are  ideal.      Floating  Click  Lock  Glueless  Installation  Guide:    Impec  Bamboo  specializes  in  Unilin®  Click  bamboo  flooring,  which  is  a  fantastic  and  convenient  alternative  to  install  the  flooring.  There  will  be  no  sanding,  dust  nor  chemical  smell,  which  is  beneficial  for  the  homeowners  to  live  in  their  homes  during  installation.  It  is  extremely  easy  to  install  or  to  remove.      Recommended  Tools  for  this  type  of  installation:  

• Underlayment  • Wood/Plastic  Spacer  (about  ½”)  • Jig/hand  saw;  undercut  or  table  saw  (for  shorter  board  cuttings)  • Hammer  • Tape  measure/Utility  knife  • Ruler  • Pencil/  Scissors  • Safety  glasses  and  earplugs.    

 *  Note:   It   is  very  important  to  maintain  ½”  space  of  expansion  gap  around  the  perimeter  of  the  floor  plan.  Impec  Bamboo  also  requires  that  installed  spans  of  Bamboo  over  30  feet  long  or  wide  must  have  

Page 6: IMPEC BAMBOO INSTALLTION MANUAL€¦ · 2016. 3. 30. · “Impec’Bamboo”’ The’Ultimate’Bamboo’Flooring’ ’ laying’down’an’acceptable’moisture’barrier.’After’the’right’acclimation’period

“Impec  Bamboo”  The  Ultimate  Bamboo  Flooring  

 

transitions  installed  to  provide  expansion  space.  Transitioning  between  rooms  where  the  connection  is  a  doorway  or  narrow  in  width  should  always  be  made  using  T-­‐molding.  Failure  to  give  movement  space  to  the  floor  may  result  in  many  issues  after  installation.        Step  1:  Install  a  vapor  barrier  on  to  the  subfloor,  and  roll  out  your  2mm  or  3mm  underlayment.  Cut  out  the  excessive  with  scissors  so  the  underlayment  is  laid  flat  perfectly  sized  on  to  the  subfloor.      Step  2:  It  is  recommended  to  install  the  planks  parallel  to  the  longest  walls.    Step  3:  Allow  about  10mm  to  12mm  (1/2”)  expansion  gap  around  the  perimeter  of  the  room  and  edges  of  the  plank  to  be  installed.  Install  your  first  plank.    Step  4:  Then  install  your  second  plank  by  pressing  the  short  end  of  the  second  plank  onto  the  leading  edge  of  the  first  installed  plank,  in  one  movement,  press  down  to  engage  the  locking  mechanism.      

 Make  sure  the  edges  of  all  planks  being  installed  are  parallel  and  tightened  

 Step  5:  Use  Tapping  block  with  a  hammer  to  tighten  the  edge  in  order  to  remove  any  gapping  between  planks.      Step  6:  When  installing  end/corners  for  using  shorter  boards,  simply  mark  the  board  with  you  pencil  for  the  exact  rip.  (Be  sure  to  count  for  the  ½”  gap  needed  against  the  wall  for  spacer)    Step  7:  Cut  the  last  plank  and  complete  your  first  row,  then  use  the  cut  offs  as  the  starters  of  your  next  row,  this  would  also  minimize  waste.  Repeat  this  process  for  the  remaining  rows.      Step  8:  Always  work  at  a  3-­‐boxes  at  a  time  to  encourage  in  variation  in  color.    Step  9:  Planks  near  the  door  way  should  be  installed  before  any  transitions  (Moldings)  are  installed.      Step  10:  Measure  for  the  last  row  and  rip  planks  if  necessary  to  ensure  ½”  gap  between  the  last  row  and  the  wall.                    Incorrect   Correct  

                                   “These  improper  head  joints  installation  placements    may  cause  weak  areas  in  the  floor”   “The  placement  of  the  head  joints  should  be  as  random  as  possible  with  no  

repeating  patterns.    In  General,  head  joints  should  be  at  least  6”  apart”  

Page 7: IMPEC BAMBOO INSTALLTION MANUAL€¦ · 2016. 3. 30. · “Impec’Bamboo”’ The’Ultimate’Bamboo’Flooring’ ’ laying’down’an’acceptable’moisture’barrier.’After’the’right’acclimation’period

“Impec  Bamboo”  The  Ultimate  Bamboo  Flooring  

 

   After  Installation:  Congratulations.  Your  brand  new  floor  is  complete  can  be  walked  on  immediately.      Glue-­‐Down  Flooring  Installation  Guide:    Impec  Bamboo  click  floors  can  also  be  glue-­‐down.  This  installation  is  commonly  used  for  installing  over  concrete  subfloors  on  or  above  grade.    Please  be  sure  to  review  in  detail  for  special  requirements  and  limitation  from  adhesive  manufactures  before  use.  Follow  closely  on  the  adhesive  instructions  and  labels  for  the  best  ultimate  result.    When  in  doubt  about  an  adhesive  application,  please  consult  with  the  adhesive  manufacture  for  procedures  immediately.      Impec  Bamboo  does  not  warrant  against  any  types  of  adhesive  related  issues.  Failure  to  follow  the  adhesive  manufacture  guidelines  and  recommendations  may  result  in  installation  failure,  which  can  void  your  warranty.      Impec  Bamboo  can  be  glued  down  using  a  moisture  resistant  flooring  adhesive.  (See  below  for  recommended  adhesive  manufacturer.)  Water  based  adhesives  should  not  be  used  for  this  purpose.      Recommended  Adhesives:    

 WWW.BOSTIK-­‐US.COM    High-­‐performance  adhesive  ideal  for  bamboo  flooring  to  common  underlayment  and  subfloors.      BOSTIKS  SEAL-­‐N-­‐GRIP:  2  in  1  urethane  adhesive  and  Moisture  Vapor  Protection  Limits;  Up  to  15Lbs  of  elevated  concrete  moisture  or  85%  relative  humidity.      BOSTIK  GREENFORCE:  Percentage  of  Water:  0.0%;  Water  Vapor  Permeability:  <0.4;  Cure  time  24  hours.      Bostik  US  Technical  support:  Technical  Service  Flooring  Specialist:  1-­‐800-­‐726-­‐7845    **Read  adhesive  instructions  carefully  for  proper  trowel  size  and  adhesive  set  time.  After  applying  the  adhesive  to  the  sub-­‐floor  with  a  trowel,  your  bamboo  flooring  planks  should  be  immediately  placed  with  groove  facing  the  wall.  Immediately  clean  any  adhesives,  during  your  install,  which  comes  in  contact  with  the  surface  of  the  planks.      Step  1:  Allow  about  10mm  to  12mm  (1/2”)  expansion  gap  around  the  perimeter  of  the  room  and  edges  of  the  plank  to  be  installed.    Step  2:  Lay  out  dry  a  couple  of  rows  before  starting  installation  to  confirm  your  layout  plan.  (be  sure  not  to  glue  your  planks  before  layout  is  set)  

Page 8: IMPEC BAMBOO INSTALLTION MANUAL€¦ · 2016. 3. 30. · “Impec’Bamboo”’ The’Ultimate’Bamboo’Flooring’ ’ laying’down’an’acceptable’moisture’barrier.’After’the’right’acclimation’period

“Impec  Bamboo”  The  Ultimate  Bamboo  Flooring  

 

 Step  3:  It  is  recommended  to  begin  install  the  planks  parallel  to  the  longest  walls.  This  would  assist  the  installer  to  have  the  straightest  working  line  to  start  with.  Install  your  first  plank.    Step  4:  Then  install  your  second  plank  by  pressing  the  short  end  of  the  second  plank  onto  the  leading  edge  of  the  first  installed  plank,  in  one  movement,  press  down  to  engage  the  locking  mechanism.      Step  5:  Cut  last  plank  to  finish  the  first  row  and  use  the  remaining  to  start  second  row.  (This  would  eliminate  waste  of  your  boards).    Step  6:  After  finishing  installing  the  first  row,  use  an  approved  trowel  and  wood  flooring  adhesive,  spread  the  glue  and  lay  the  second  row  by  connecting  short  edges  of  planks  first.  Repeat  this  process  for  the  remaining  rows.      Step  7:  Consistently  check  to  make  sure  your  installed  planks  are  all  aligned.    Step  8:  Use  tapping  block  and  hammer  to  tighten  the  planks.  And  be  sure  not  to  let  installed  planks  move  on  wet  adhesives.  (This  may  cause  planks  to  separate  and  disarranged)  

                       

Step  9:  Measure  for  the  last  row  and  rip  planks  if  necessary  to  ensure  ½”  gap  between  the  last  row  and  the  wall.    Step  10:  Remove  any  adhesive  from  the  surface  (if  any)  of  the  flooring  before  it  dries;  Impec  Bamboo  recommends  to  use  bostik’s  ultimate  adhesive  remover  towels  to  immediately  remove  any  adhesives  on  the  flooring  surface  when  spotted.  Cured  adhesive  is  extremely  hard  to  remove  and  may  damage  the  floor.  So  it  is  important  to  make  sure  your  flooring  is  clean  and  dry  at  all  times.      Step  11:  Flooring  planks  may  require  some  weight  on  the  surface  in  order  to  help  cures  the  adhesive  and  ultimately  hold  the  planks  down  completely.      After  Installation:  Allow  your  newly  installed  floor  to  have  sometime  to  cure  the  adhesives,  based  on  the  adhesives  company’s  required  time  frame,  before  walk  on  or  have  any  furniture  on  the  floor.