IMIA WGP 102(17) Rolling StockRolling Stock in Engineering Insurance • Loss Data • Losses during...
Transcript of IMIA WGP 102(17) Rolling StockRolling Stock in Engineering Insurance • Loss Data • Losses during...
IMIA WGP 102(17) Rolling Stock50th Annual IMIA Conference
Munich, Germany
Christoph GuntersweilerHead Engineering SwitzerlandHelvetia Insurance
Agenda
1 Work Group - Members
2 Content and goal of the paper
3 What do we understand by Rolling Stock
4 Rolling Stock in Engineering Insurance
5 Loss Examples
6 Underwriting Considerations
2 | IMIA WGP 102_17 Rolling Stock
Work Group - MembersA global topic meets a team of regional experts■ Sponsor: Guido Benz, Swiss Re
■ Members:■ Christoph Guntersweiler, Helvetia, Chairman■ Heiko Hammacher, Helvetia■ Eric Benz, Scor■ Ho Kun Hong, Scor■ Ed Chan, RSA■ Brendan Reed, Codan■ Thomas Gebert, AXA■ Denis Kocan, Swiss Re■ Darren Smart, Liberty■ Bruno Ternisien, Naudet■ Colin Hamling, High Speed 2■ Richard Day, Arup■ Raik Wittowski
IMIA WGP 102_17 Rolling Stock3 |
• What do we understand by Rolling Stock• Costs of Rolling Stock
Definition and Values
• Rolling Stock Industry, Rail Transport Market • Technology, Development, Maintenance, Testing, Security,
Standardisation/Regulation
Rolling Stock in Engineering Insurance
• Loss Data• Losses during Assembly, Testing, Storage and Operation
Loss Examples
• Underwriting / Pricing• PML
Underwriting Considerations
Content and goal of the paper
4 | IMIA WGP 102_17 Rolling Stock
Goal:Provide support and information aboutRolling Stock insurance for:
Engineering LinesUnderwriters
Risk Engineers
Claims Managers
What do we understand by Rolling Stock
in scopeout of scope
5 | IMIA WGP 102_17 Rolling Stock
Rolling Stock
is on dual Rails
is rolling
Passenger -
Transport
Cargo-
Transport
Infrastructure• Tunnels• Bridges• Rails / Tracks
Special vehicles / trains• Grinding Machines• Magnetic Trains• Cable Cars• Ski Lifts
Rolling Stock in Engineering InsuranceStatistics – Rolling Stock Industry
Source: SCI "The Worldwirde Market for Railway Industries 2016"
6 | IMIA WGP 102_17 Rolling Stock
Rolling Stock in Engineering InsuranceTop 10 Manufacturers – Rolling Stock Industry
Source: SCI "Worldwide Rolling Stock Manufacturers 2016"
IMIA WGP 102_17 Rolling Stock7 |
Rolling Stock in Engineering InsuranceStatistics – Rail Transport Market
Source: SCI "Rail Transport Markets – Global Market Trends 2016-2025"
8 | IMIA WGP 102_17 Rolling Stock
Rolling Stock in Engineering InsuranceDifferences in Regions– Rail Transport Market
Source: SCI "Rail Transport Markets – Global Market Trends 2016-2025"
IMIA WGP 102_17 Rolling Stock9 |
Worldwide rail freight performance 2015 (tkm, %) Worldwide passenger rail performance 2015 (pkm, %)
Maintenance of wheels
thermal cracks skidded wheels effect
Rolling Stock in Engineering InsuranceAdditional Information
10 | IMIA WGP 102_17 Rolling Stock
Rolling Stock
Technology
Maintenance
TestingSecurity Equipment
Standardi-sation andRegulation
Present• Dual Mode (Power)
Vehicles• Gauge Changing• Energy Storage
Systems• Hybrid Vehicles• ......
Future• Internet of Things improving availability, reducing unplanned maintenance activity
• Energy reduction reduction in weight, optimization of energy recovery system
Loss ExamplesLessons learned and Statistics
Source: eurostat "Datas from Europe 2010-2014"
11 | IMIA WGP 102_17 Rolling Stock
Lessons learned:Often, losses are not the result of one single root cause, but rather a chain of causes initialized by human error.
Loss ExamplesCauses of Loss
12 | IMIA WGP 102_17 Rolling Stock
• Testing, Speeding, Human Failure• NatCAT
Assembly, Testing & Storage
• Human Failure• Fatigue Crack• Landslide• Poor Maintenance• Flood• Fire• Brake Failure
Operational
Loss ExamplesRhätische Bahn, Landslide (1)
13 | IMIA WGP 102_17 Rolling Stock
Loss ExamplesRhätische Bahn, Landslide (2)
14 | IMIA WGP 102_17 Rolling Stock
Underwriting ConsiderationsFocus on Project and Operational
IMIA WGP 102_17 Rolling Stock15 |
Project (Assembling & Testing) Operational
Insurable Interests / ContractualObligations Insured Property Third party liability Type of coverage Wording / Concept ofcover Risk Assessment / Quality of Risk andPML considerations Project Period, Transfer and Storage Pricing related to the above
• Project or Operational• Insured values• Concept of Cover
Underwriting Information
• Accumulation• Period of business interruption
Risk Assessment
• Storage or Maintenance Depot (Christmas Event)• Fire• Natural Catastrophe• Equipment Failure• Collision or Derailment• Business Interruption (BI) and Contingent Business Interruption (CBI)
Loss Estimate Scenarios
PML Considerations
16 | IMIA WGP 102_17 Rolling Stock
PML (Probable Maximum Loss)
Based on thedefinition of IMIA
Conclusion
■Contractual obligations on Rolling Stock are complex and the insurancesolutions should be assessed by experienced underwriters
■Some losses can be catastrophic in nature, very often human error is a keypoint of failure
■Rail as a reliable form of transport continues to grow at a positive rate
■New technology, lighter weights and higher speeds will further increasecomplexity
IMIA WGP 102_17 Rolling Stock17 |
Thank you very much for your attention.