Embankment WorksIM Properties, Dordon, UK
the complete construc tion company
“Failed railways embankemnts were re-profiled and stabilised”
“Failed railways embankemnts were re-profiled and stabilised”
A £1.5m project of ground engineering
for the IM Properties Group at Whateley
Villas near Tamworth. Failed railways
embankments/slopes were re-profiled
and stabilised using combinations of
engineered, cutting and filling along
with the installation of Gabion baskets
and soil nailing. Remediated areas
included an array of drainage solutions
typically from traditional land drainage
to drilled and grouted “plati” drains all
designed to remove excessive weight
from the slopes.
The re-profiled slopes covered with
geotextile erosion matting topped off
with Hydroseed giving a “natural” finish.
Embankment Works
Start Date | April 2008
Duration | 29 Weeks
Completion Date | October 2009
Project Value | £1.5m
Client Details | IM Properties Limited
Details
the complete construc tion company
Anglo Holt Construction Ltd.
0121 525 6717