Embankment WorksIM Properties, Dordon, UK

the complete construc tion company

Page 2: IM-Properties-2010

“Failed railways embankemnts were re-profiled and stabilised”

Page 3: IM-Properties-2010

“Failed railways embankemnts were re-profiled and stabilised”

A £1.5m project of ground engineering

for the IM Properties Group at Whateley

Villas near Tamworth. Failed railways

embankments/slopes were re-profiled

and stabilised using combinations of

engineered, cutting and filling along

with the installation of Gabion baskets

and soil nailing. Remediated areas

included an array of drainage solutions

typically from traditional land drainage

to drilled and grouted “plati” drains all

designed to remove excessive weight

from the slopes.

The re-profiled slopes covered with

geotextile erosion matting topped off

with Hydroseed giving a “natural” finish.

Embankment Works

Page 4: IM-Properties-2010

Start Date | April 2008

Duration | 29 Weeks

Completion Date | October 2009

Project Value | £1.5m

Client Details | IM Properties Limited