DISTRIBUTION TRAINING
No Course Title
Target
Participant
(Grade)
Duration
(days)
Nos. of
SessionSept 13 Oct 13 Nov 13 Dec 13 Jan 14 Feb 14 Mac 14 Apr 14 May 14 Jun 14 Jul 14 Aug 14
1Substation Fitter 1 (Maintenance)
Asas Jurugegas Pencawang 1 (Senggaraan)TT05/06 10 4 2-13 11-22 3-14 3-14 19-30
2Substation Fitter 2 (Construction)
Asas Jurugegas Pencawang 2 (Pembinaan)TT05/06 10 4 21-1/11 18-29 17-28 14-25
3
Transformer Operation & Maintenance up to
33kV & PPVR (Malim Nawar)Kendalian & Penyelenggaraan Alatubah
setakat 33kV & PPVR (Malim Nawar)
TT07/08 5 4 7-11 6-10, 3-7 7-11
4
Earthing Installation of Distribution Substation
Pemasangan Pembumian Pencawang
Pembahagian
TT07/08 2 4 16-17 23-24 28-29 27-28
5Senggaraan Pencawang (Malim Nawar)
Substation MaintenanceTT07/08 5 21-25 11-15
6-10
20-24
6Sistem Pembumian
Earthing System
TT09/10 2 4 6-7 9-10 14-15 13-14
7
Transformer Construction & Maintenance up to
33kV (Malim Nawar)
Pembinaan & Penyelenggaraan Alatubah
Setakat 33kV (Malim Nawar)
TT09/10 5 4 16-20 20-24 31-4/4 14-18
8
Switchgear Installation and Maintenance up to
33kV
Pemasangan dan Penyelenggaraan Alatsuis
setakat 33kV
TT09/10 5 2 23-27 6-10
9 Introduction to LV Capacitor Bank TT09/10 3 3 3-5 7-9 12-14
10
Pengenalan Pencawang Pembahagian Untuk
Anggota Kerja Perjangkaan
Introduction of Distribution Substation for
Metering Staff
TT09/14 3 3 17-19 27-29 14-16
11Construction and Maintenance of Distribution
SubstationExecutive 5 6 23-27 11-15 16-20 20-24 31-4/4 21-25
12Transformer & OLTC Maintenance up to 33kV for
ExecutiveExecutive 4 3 17-20 19-22 2-5
ILSAS PROGRAM SCHEDULE FY 2013/2014
Substation & Operation System
DISTRIBUTION TRAINING
SUBSTATION
1
-
7/26/2019 ILSAS Training Schedule 2014-Distribution
2/8
DISTRIBUTION TRAINING
No Course Title
Target
Participant
(Grade)
Duration
(days)
Nos. of
SessionSept 13 Oct 13 Nov 13 Dec 13 Jan 14 Feb 14 Mac 14 Apr 14 May 14 Jun 14 Jul 14 Aug 14
DISTRIBUTION TRAINING
13Switching Operation up to 1kV Kendalian Sistem
- setakat 1kV
Non Exec
TNBD4 5 17-20 2-5 27-30
10-13
31-3/4
1411kV Switching Operation (Refresher)
Kendalian Pencawang 11kV (Ulangkaji)TT09-TT14 2 2 30-1/10 2-3
15Cable Fault Location
Mencari Kerosakan KabelTT07-TT14 5 3 23-27 25-29 16-20
16Sheath Fault Location
Mencari Kerosakan Kabel 'Sheath'TT07-TT14 2 3 19-20 6-7 2-3
17
Substation Switching Operation up to 11kV
(Malim Nawar)
Kendalian Pencawang - Setakat 11kV (Malim
Nawar)
TT09-TT14 518-22
25-29
2-6
9-13
16-20
2-6
1811kV Switching Operation(Malim Nawar)
Kendalian Pencawang 11kV (Malim Nawar)E07-E13 5 6 30-4/10 21-25 11-15 6-10 10-14 14-18
19Cable Fault Location
Mencari Kerosakan KabelE07-E15 5 3 9-13 18-22 6-10
20Sheath Fault Location
Mencari Kerosakan Kabel 'Sheath'E07-E15 2 3 17-18
12-13
30-31
21
Switching Operation up to 33kV
(Module 1 - Introduction to 33kV System)
Kendalian Pencawang - Setakat 33kV
(Modul 1 - Pengenalan Sistem 33kV)
TT09/14 3 5 6 - 8 6 - 8 24 - 26 10 - 12 14 - 16
22
Switching Operation up to 33kV
(Module 2 - System Operation 33kV)
Kendalian Pencawang - Setakat 33kV
(Modul 2 - Kendalian Sistem 33KV)
TT09/14 5 5 2 - 6 10 - 14 31 - 4/4 21 - 25 25 - 29
23
Switching Operation up to 33kV
(Module 3 - Fault Diagnosis)
Kendalian Pencawang - Setakat 33kV
(Modul 3 - Mendiagnosis Kerosakan)
TT09/14 3 2 28 - 30 4 - 6
24
Switching Operation up to 33kV
(Module 1 - Introduction to 33kV System)
Kendalian Pencawang - Setakat 33kV
(Modul 1 - Pengenalan Sistem 33KV)
E07-E15 3 5 17 - 19 16 - 18 17 - 19 3 - 5 5 - 7
25
Switching Operation up to 33kV
(Module 2 - System Operation 33kV)
Kendalian Pencawang - Setakat 33kV
(Modul 2 - Kendalian Sistem 33KV)
E07-E15 5 5 25 - 29 20 - 24 17 - 21 14 - 18 2 - 6
26
Switching Operation up to 33kV
(Module 3 - Fault Diagnosis)
Kendalian Pencawang - Setakat 33kV
(Modul 3 - Mendiagnosis Kerosakan)
E07-E15 3 2 23 - 25 18 - 20
OPERATION SYSTEM 33kV
OPERATION SYSTEM 11kV
2
-
7/26/2019 ILSAS Training Schedule 2014-Distribution
3/8
DISTRIBUTION TRAINING
No Course Title
Target
Participant
(Grade)
Duration
(days)
Nos. of
SessionSept 13 Oct 13 Nov 13 Dec 13 Jan 14 Feb 14 Mac 14 Apr 14 May 14 Jun 14 Jul 14 Aug 14
DISTRIBUTION TRAINING
27
Fault Finder Competency
Kompetensi Pembaik Kerosakan / Asas
Pembaik Kerosakan
TT05 5 5 23-4/10 3-14 17-28 14-25 19-30 9-20
28Low Voltage Live Line Work
Kerja Talian Hidup Voltan RendahTT05 - TT08 3 5
30-2/10(MNawar)
6-8
25-27
7-9
(Bangi)
20-22
(MNawar)
27-29(MNawar)
1-3
(MNawar)
28-30
(MNawar)
28-30
(Bangi)
14-16
29
Construction and Maintenance of Overhead
Line Bare Conductor
Pemasangan dan Penyelenggaraan Talian
Atas Voltan Sederhana Tidak Bertebat
TT07/08 5 4 16-20 26-30 25-29
30Refresher For Fault Finder
Ulangkaji Pembaik KerosakanTT07/08 4 5 2-5 16-19 10-13 2-5
11-14
25-28
31
Low Voltage Live Line Work for
Executives/Supervisors
Kerja Talian Hidup Voltan Rendah
Eksekutif/Penyelia
TT09-E12 1 27
26
32Low Voltage Overhead Line for Executives
Talian Atas Voltan Rendah Utk. Eksekutif E07-E13 5 5 9-13 2-610-14
24-28 2-6 18-22
33
Refresher Course for 33kV Overhead Line for
Executives
Ulangkaji Talian Atas 33kV Utk. Eksekutif
E07-E13 2 3 9-10 7-8 14-15
34Refresher for Low Voltage Live Line
Ulangkaji Kerja Talian Hidup Voltan RendahTT05 - 08 2 5
12-13
30-3115-16, 25-26 19-20
35Pembinaan dan Senggaraan Talian Atas Voltan
RendahTT09/12 5 2-6 3-7 31/3-4/4 19-23 16-20
36
High Voltage Overhead Line for Linesman
(Malim Nawar)
Asas Pemasang Talian Voltan Tinggi (Malim
Nawar)
TT05/07 20 1 24-21/3
37
Low Voltage Live Line Work (Malim Nawar)
Kerja Talian Hidup Voltan Rendah (Malim
Nawar)
TT05/06 3 5 30-2/1020-22
27-29
1-3
28-30
38
Low Voltage Overhead Line for Linesman
Module 1 (Malim Nawar)
Kompetensi Pemasang Talian VR Modul
1(Malim Nawar)
TT05/06 10 4 21-1/11 11-22 2-13 19-30
39
Low Voltage Overhead Line for Linesman
Module 2
Kompetensi Pemasang Talian VR Modul 2
TT05/06 10 4 2-13 9-204-15
18-29
OVERHEAD LINES (MALIM NAWAR)
OVERHEAD LINES & CABLE
OVERHEAD LINES
3
-
7/26/2019 ILSAS Training Schedule 2014-Distribution
4/8
DISTRIBUTION TRAINING
No Course Title
Target
Participant
(Grade)
Duration
(days)
Nos. of
SessionSept 13 Oct 13 Nov 13 Dec 13 Jan 14 Feb 14 Mac 14 Apr 14 May 14 Jun 14 Jul 14 Aug 14
DISTRIBUTION TRAINING
40 MV ABC for Executive (Malim Nawar) E07-E14 2 5 18-19 3-4 14-1513-14
27-28
41
Construction and Maintenance of MV ABC
Cable (Malim Nawar)
Pemasangan dan Penyelenggaraan Kabel MV
ABC (Malim Nawar)
Executive 5 3 7-112-6
23-27
42
Pengendalian & Penyelenggaraan Kren - Auger
(Malim Nawar)
Operation & Maintenance of Crane - Auger
(Malim Nawar)
TD05 523-27
(TNBD)25-29
24-28
(TNBD)
43 Vegetation Management (Malim Nawar) Open 2 5 16-17 22-23 31-1/411-12
25-26
44
Refresher for Low Voltage Live Line (Malim
Nawar)
Ulangkaji Kerja Talian Hidup Voltan Rendah
Open 2 3-417-18
7-8 19-20 23-24
45LV Jointing Practices
Amalan Pencantuman Kabel Voltan RendahTT05/06 7 4 2-10 22-30 3-11 9-17
4611kV Jointing Practices
Amalan Pencantuman Kabel hingga 11 kVTT05/06/07 7 4
7-15
18-2615-24 20-28
47 33kV Jointing PracticesAmalan Pencantuman Kabel hingga 33 kV
TT07/08 5 3 9-13 7-11 6-10
48
Cable Laying Practices up to 33kV (Supervisor)
Amalan Rentang Kabel hingga 33kV (Penyelia
TNB)
TT05-10 2 5 26-27 20-21 27-28 24-25 29-30 14-15
49 Cable Fault Post Mortem (Exec & NonExec)TT09 -14
E07-E142 3 25-26 16-17
50Cable Laying & Jointing up to 33kV (Malim
Nawar)TT09-14 3 5 17-19 24-26 21-23 26-28 11-13
51 Condition Based Maintenance - Cable CPD E07/08 - E14 3 3 2-4 27-29 12-14
52 U/G Distribution Cables CPDE07/08- E14
ET & Engineer3 3 6-8 3-5 10-12
5322kV Jointing Practices
Amalan Pencantuman Kabel hingga 22 kVTT05/06/07 7
5411kV Jointing Practices (Refresher)
Amalan Percantuman Kabel 11kV (Refresher)TT05-08 2 3 12-13 13-14 20-21
55
Cable Laying Practices up to 33kV (Contractor)
Amalan Rentang Kabel Hingga 33kV
(Kontraktor)
Contractor 2
56 Trench Back Filling
Pegawai &
Kakitangan
TNB
2-3
30-1/1028-29 25-26
CABLE
UPON REQUEST
UPON REQUEST
4
-
7/26/2019 ILSAS Training Schedule 2014-Distribution
5/8
DISTRIBUTION TRAINING
No Course Title
Target
Participant
(Grade)
Duration
(days)
Nos. of
SessionSept 13 Oct 13 Nov 13 Dec 13 Jan 14 Feb 14 Mac 14 Apr 14 May 14 Jun 14 Jul 14 Aug 14
DISTRIBUTION TRAINING
57Installation and Testing of OPC Meters
Pemasangan dan Pengujian Jangka OPCTT05/06 3 3 7-9 16-18 17-19
58Installation and Testing of LPC LV Meters
Pemasangan dan Pengujian Jangka LPC LVTT05/06 2 3 10-11 19-20 20-21
59Inspection of OPC/LPC Meters
Pemeriksaan Jangka OPC/LPCTT07/08 5 3
28/10 -
1/1120-24 7-11
60
Installation and Testing of OPC and LPC Meters
Pemasangan dan Pengujian Jangka OPC &LPC
TT09/10 4 3 24-27 10-13 14-17
61
Inspection and Detection of LPC Metering
Irregularities
Pemeriksaan dan Mengesan Kejanggalan
Jangka LPC
TT09/10 4 3 3-6 4-7 6-9
62 Metering Wiring and Inspection
E07/08/12/13
(Only for
Metering
Engineers)
3 2 12-14 18-20
63 Introduction to Metering & Supply ApplicationE12/13 (Post
PEP)4 3 22-25 7-10 10-13
64 High Voltage MeteringE07/ 08/ 12/
135 1 24-28 23-27
65 Handling of Portable Meter Test SetTT05/06 -
TT09/102
66
LV Planning Guidelines for Non-executive (to
be conducted together with MV Planning
Guidelines for Non-exec)
TT09/10 3 2 2-4 14-16
67
MV Planning Guidelines for Non-executive (to
be conducted together with LV Planning
Guidelines for Non-exec)
TT09/10 2 2 5-6 17-18
68 Basic PSS-Adept for Non-executive TT11/12 3 2 21-23 14-16
69 Introduction to Power Quality for Executive E07-12 2 2 12-13 24-25
70Introduction to LV Planning (to be conducted
together with Introduction to MV Planning)E12 3 2 10-12 19-21
71Introduction to MV Planning
(to be conducted
together with Introduction to LV Planning)E12 2 2 13-14 22-23
72 Basic PSS-Adept for Executive E12-13 3 2 19-21 17-19
PLANNING (ENGINEERING SERVICES TRAINING)
METERING (ENGINEERING SERVICES TRAINING)
Upon Request
5
-
7/26/2019 ILSAS Training Schedule 2014-Distribution
6/8
DISTRIBUTION TRAINING
No Course Title
Target
Participant
(Grade)
Duration
(days)
Nos. of
SessionSept 13 Oct 13 Nov 13 Dec 13 Jan 14 Feb 14 Mac 14 Apr 14 May 14 Jun 14 Jul 14 Aug 14
DISTRIBUTION TRAINING
73
Planning
- Planning (1 day)
- Power Quality (1 day)
E14/E15
E12/E13
E07/E08
2 1
26
(Planning)
27 (PQ)
74Distribution Planning Module 1 - LV Planning for
ExecE07-E15 3 2 9-11 28-30
75Distribution Planning Module 2 - MV Planning for
ExecE07-E15 4 2 30-3/10 20-23
76Distribution Planning Module 3 - Project
Planning ProcessE07-E15 2 2 13-14 17-18
77 PQ for O&M Exec E07-E15 3 3 25-27 7-'9 16-18
78 Failure Analysis Methodology for MV VCBs E07-E15 3 2 28-30 23-25
79Transient Fault Reduction for MV Overhead
LinesE07-E15 2 2 10-11 6-7
80 Application of ESAH E07-E15 2 2 17-18 17-18
81 DNMP for Area Planner E07-E15 2 2 8-9 6-7
82 DNAPnet for State Planner E07-E15 5 2 21-25 18-22
83 Intro to MS IEC 60364 E07-E15 2 2 20-21 28-29
84Integration of Distributed Generation into
Distribution NetworkE07-E15 3 4 24-26 8-10 26-28 2-4
85 Accident Recall & Diagnostic AP & CP (Mix) 2 524-25
31-1/424-25 26-27 19-20
86 System Power Quality (Non-exec) TT09-TT14 3 3 16-18 2-4 11-13
87Distribution Network Power System Protection
33/11KkV
E12 - 13
(Post-PEP)3 5 2-4 4-6 4-6 1-3 5-7
88Earth Fault Indication (EFI) Installation Operation
& MaintenanceE07 - 15 2 5
11-12
26-279-10 27-28 11-12
89 Earth Fault Indication (EFI) Installation Operation& Maintenance
TT09-TT14 2 6 11-1225-26
7-821-22
14-1527-28
PROTECTION
NON-EXEC
AM MODULE
TECHNICAL
PLANNING
EXEC
6
-
7/26/2019 ILSAS Training Schedule 2014-Distribution
7/8
DISTRIBUTION TRAINING
No Course Title
Target
Participant
(Grade)
Duration
(days)
Nos. of
SessionSept 13 Oct 13 Nov 13 Dec 13 Jan 14 Feb 14 Mac 14 Apr 14 May 14 Jun 14 Jul 14 Aug 14
DISTRIBUTION TRAINING
90
Distribution System Protection 33/11kV (Basic)
Perlindungan Sistem Pembahagian 33/11kV(Asas)
TT05-TT06 3 5 3-5 1-3 6-825-27
18-20
91
Distribution System Protection 33/11kV
(Intermediate)
Perlindungan Sistem Pembahagian 33/11kV
(Pertengahan)
TT07-TT08 3 311-13
24-2625-27
92
Distribution System Protection 33/11kV
(Advance)
Perlindungan Sistem Pembahagian 33/11kV
(Lanjutan)
TT09-TT14 3 3 4-6 28-30 12-14
93Advanced Power System Protection (Analysis &
Protection of Power System - APPS)
Protection
Engineer/Man
ager
10
94Practical Power System Protection & Control
(MATRIX Power)Executive 5 5 18-22 20-24 17-21 19-23
2-6
23-27
95SCADA System (M1) - Distribution @ Sistem
SCADA (Modul 1)
TT09 (TNBD
Only)3 1 10-12
96SCADA System(M3) - Distribution @ Sistem
SCADA (Modul 3)
TT09 - E14
(TNBD Only)3 1 6-8
97 RTU-FoxboroTT09-TT14
(TNBD Only)4 1 12-15
98 RTU- Dongfang TT09-TT14(TNBD Only)
4 2 3-6 4-7
99 RTU-Viscon DuaTT09-TT14
(TNBD Only)3 1 21-23
100 Master Station Module 1 (Non Exec)TT09-TT14
(TNBD Only)2 1 18-19
101 Master Station Module 1 (Exec)E12-E15 (TNBD
Only)2 1 8-9
102
Akta Bekalan Elektrik
TNB Dist : 8-10 & 22-24/9/2014, 13-15 & 10/2014,10-12/11/2014)
TNBD Only 39-11
23-25
7-9
21-2328-30
18-206-8
20-22
10-12
24-26
10-12
24-26
7-9
21-23
5-7
19-21
2-4
16-18
11-13
25-27
103
ST Cable Jointing Level 1 (LV)
Percantuman Kabel Tahap 1 (Voltan Rendah) -
TNBD / Open
TT05/06 12 23-18
31-15/3
104
ST Cable Jointing Level 2 (11kV)
Percantuman Kabel Tahap 2 (11kV) - TNBD /
Open
TT05/06/07 10 1 16-27
105
ST Cable Jointing Level 3 (33kV)
Percantuman Kabel Tahap 3 (33kV) - TNBD +
Open
TT05/06/07 10 1 2-16
PEMBAHAGIAN (SCADA)
Upon Request
CERTIFIED TECHNICAL PROGRAMME (For TNBD)
7
-
7/26/2019 ILSAS Training Schedule 2014-Distribution
8/8
DISTRIBUTION TRAINING
No Course Title
Target
Participant
(Grade)
Duration
(days)
Nos. of
SessionSept 13 Oct 13 Nov 13 Dec 13 Jan 14 Feb 14 Mac 14 Apr 14 May 14 Jun 14 Jul 14 Aug 14
DISTRIBUTION TRAINING
106 Failure Analysis Methodology for MV VCBs E07-E15 3 2 28-30 23-25
107Transient Fault Reduction for MV Overhead
LinesE07-E15 2 2 10-11 6-7
108 Intro to MS IEC 60364 E07-E15 2 2 20-21 28-29
109 Vendor Training - SS Maint Kont 3
110 Speed Program - LVDB Mix 1
111 Construction and Maintenance of DistributionSubstation
TNBD Only 5 6 23-27(TNBD)
11-15(TNBD)
16-20(TNBD)
20-24(TNBD)
30-4/4(TNBD)
21-25(TNBD)
112Construction and Maintenance of Distribution
SubstationOutsider 5 1 25-29
10-14
24-28
113 TX maintenance (Malim Nawar) Outsider 5 1 28-1/11
Upon Request
Upon Request
OTHER COURSES
8