Illinois High Speed Rail Project
Dave Orrell – General Director Construction / Public Projects
![Page 2: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/2.jpg)
2
Overview
• Route • Funding • Benefits • Scope of Work • Permitting • Crossing Work • Maintenance
![Page 3: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/3.jpg)
3
Chicago-St. Louis Corridor (SPCSL) • IDOT has actively developed the
corridor since the mid1980’s
• Federally designated a HSR Corridor in 1992
• Previously completed NEPA (2004 ROD)
• Sizeable ridership at intermediate stations
![Page 4: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/4.jpg)
4
High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery
and Reinvestment Act (ARRA). • Partnership with states, FRA, Amtrak
and some freight railroads • Investment focused on three key
objectives: – Build new high-speed rail corridors; – Improve reliability, speed, and
frequency of existing services; and – Lay the groundwork for future high-
speed rail services.
HSIPR Program created to address nation’s transportation challenges by making strategic investments in an efficient network of passenger
rail corridors that connect communities across the country.
As of 03/15/2011 Source: FRA
![Page 5: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/5.jpg)
5
Current Program Budget • ARRA Project
– Track & Structures $681 million – Real Estate $ 24 million – Stations $ 33 million – Rolling Stock / Equipment $211 million – Signaling & Communications $202 million – Grade Crossings, Fencing, OH Bridges $176 million – Professional Services $203 million
• Additional State Funding
(Program Management, Environmental / Design, Construction Oversight)
![Page 6: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/6.jpg)
6
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0
50
100
150
200
250
300
350
400
450
500
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
On-
Tim
e Pe
rcen
tage
Rid
ersh
ip (T
hous
ands
)
Year
Chicago - St. Louis Ridership & Reliability
Ridership On-Time Percentage
![Page 7: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/7.jpg)
7
Benefits Summary
FRA Program
HSR daily round trips (five existing 79 mph) 3 4 Travel time reduction 45-minutes (one
hour for express)
Reliability 85% Safety improvements (crossings, fencing, PTC) Yes New equipment Yes New/upgraded stations Yes Service upgrades (with Amtrak) Yes
![Page 8: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/8.jpg)
8
Who’s Involved?
Business Community
General Public & Interest Groups
Elected Officials
Transportation Providers
City/County Technical Staff
Regional Agencies
Project Partners • Illinois Department of Transportation
(IDOT) • Federal Railroad Administration
(FRA) • Union Pacific Railroad (UPRR)
• Amtrak • Illinois Commerce Commission (ICC)
• Others
Support • Parsons Brinckerhoff - Program
Manager • IDOT Consultants (PTB
Advertisements) • UPRR Contractors/Consultants
![Page 9: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/9.jpg)
9
Odell - reconstructed
Dwight
Pontiac - reconstructed
Chenoa
Ballard
Normal
SPCSL Track 2A ARRA HSIPR Track 2A Project
Woodland Jct.
Chicago
St. Louis
Springfield Ridgely
Bloomington
Findlay Jct.
E. St. Louis
De Soto
Salem
Mt. Vernon
Benton Jct.
Gorham/Chap
Chester
Springfield Sub
Joliet Sub
BNSF Galesburg
Nelson
Peoria
Rochelle
MP 126.4
Chicago
Bloomington
MP 36.7
Mazonia MP 62.7
Wilmington
Joliet Intermodal Facility
CP Justice
CP Canal
Brighton Park
St. Louis
Springfield
Bloomington
MP 126.4
McLean Athol
Lincoln
Elkhart
Auburn
Girard
Carlinville
Shipman
Wann MP 262.1
WR Tower MP 275.5
Godfrey MP 249.3
Alton
FRA HSR Project 2A Description
1) TRT (Completed except for KCS – No. 2 ML Wann to Q Tower)
Joliet to St. Louis (Q Tower) - 240 ML mi Concrete Ties & Premium Rail - 626K ties, 1.3M TF new Rail, 13K CL ballast
2) Const 2nd ML / New Siding / Re-Construct Sidings
Godfrey – Godfrey to Shipman (15.8 mi) Girard – Extend Girard Siding (8.5 mi) Elkhart – Extend Elkhart Siding (8.5 mi) Joliet – Construct 2nd ML (5.0 mi) Braidwood – Construct 10,000 ft. siding Re-Construct Sidings – 15 (completed 2)
3) PTC & Grade Xings, Bridges
Joliet to Q Tower • Full Bridge Replacement 29 • Crossing Reconstruction 234 (14 complete) • PTC – Signal Cutover
FRA – HSR Project 2A New 2 ML Siding Re-Const.
2nd Main Line – Elwood to Mazonia (18 miles)
2nd ML Joliet-Elwood – 5 Mi.
Q Tower MP 281.0
Lenox MP 269.7
Braidwood – 10,000 ft. Siding
Girard 2nd ML – 8.5 Mi.
Elkhart 2nd ML – 8.5 Mi.
Godfrey to Shipman 2nd ML – 15.8 Mi.
Kankakee River
Pequ
ot Su
b
Tier 4
Tier 4
Tier 6
Tier 3
Tier 2
Tier 1S
Tier 5
Tier 1N
State Funded New 2 ML
Ridgley
Elwood MP 44.7
Construction Schedule • Tier 2 – 2013-2014 • Tier 3 – 2014-2015 • Tier 4 – 2014-2015 • Braidwood Siding – 2014 • Joliet to Elwood – 2014-2015 • Braidwood to Mazonia – 2015 • Elwood to Braidwood – 2016-2017 • Tier 1S – 2015-2016 • Tier 5 – 2016
![Page 10: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/10.jpg)
10
State Work
• MOU Signed – October 2013 – 18 Mi. 2nd Main Line – Mazonia to Ellwood
– 4th Train Pair becomes HSR
– End of 2015 in Service Joliet to Carlinville Chicago
Dwight
MP 36.7
Mazonia MP 62.7
Wilmington
Joliet Intermodal Facility
FRA – HSR Project 2A New 2 ML Siding Re-Const.
Proposed 2nd Main Line – Elwood to Mazonia (18 miles) 2nd ML Joliet-Elwood – 5 Mi.
Braidwood – 10,000 ft. Siding
Kankakee River
Pequ
ot Su
b
State Funded New 2 ML
Elwood MP 44.7
Midewin Prairie
Woodland Jct.
Chicago
St. Louis
Springfield Ridgely
Bloomington
Findlay Jct.
E. St. Louis
De Soto
Salem
Mt. Vernon
Benton Jct.
Gorham/Chap
Chester
Springfield Sub
Joliet Sub
BNSF Galesburg
Nelson
Peoria
Rochelle
![Page 11: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/11.jpg)
11
• 243 miles of track rehabilitation (completed)
• 30 miles 2nd main line • 15 new or improved sidings/DT
(2 completed) • 250 improved grade crossings
(initial improvements made) • 7 new or remodeled stations • 6 new high-speed train sets (with
California/others) • Advanced signaling system (PTC)
Major Components
![Page 12: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/12.jpg)
12
Mainline Track Rehabilitation Before After
Milepost 156.77
Milepost 118.12
![Page 13: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/13.jpg)
13
110 mph Demo: Dwight-Pontiac • 15-mile initial segment, in service November 2012 • Track/signal upgrade completion • Interim equipment improvements • On board service enhancements
![Page 14: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/14.jpg)
14
Infrastructure Highlights for 110mph
• Cab signal installation • ITCS at crossings (passenger) • Crossings have quad gates
including loop detection • Siding rebuild • Drainage
![Page 15: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/15.jpg)
15
Key Foundation: 2003 Environmental Impact Statement (EIS)
• Tier 1 EIS - basis of environmental clearance for current project
• Tier 2 documentation underway (40+documents)
![Page 16: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/16.jpg)
16
NEPA Challenges • Fast Pace Technical Work • Agency Coordination • FRA Staffing Issues • Critical Path
![Page 17: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/17.jpg)
17
NEPA Process
Process: 1. Engineering footprint from UP 2. Determine if Categorical Exclusion or
Environmental Assessment 3. FRA NEPA document prepared by IDOT/PMC 4. Engineering completion by UP 5. Construction by UP 6. Coordination of mitigations by all
![Page 18: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/18.jpg)
18
Crossing Close-up
• Completed diagnostics at over 250 locations
• Extensive liaison with IDOT Highways, local agencies, ICC, FRA, and others
![Page 19: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/19.jpg)
19
Diagnostics
• Diagnostics 2010-2012 • Team Makeup
– Illinois Commerce Commission – IDOT Rail & Highway – Local Agency – County or City
• Evaluation – Profile – Access to Crossings – Loop Detection Requirements – Four Quad Gates – Pedestrian Gate Requirements
![Page 20: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/20.jpg)
20
Fencing Requirements • Diagnostics Team • Part of 2004 ROD • Local Communities
![Page 21: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/21.jpg)
21
Grade Crossing Process
• IDOT handles PE including local coordination • Extensive approval process • Bid / Construct
− Non-staged all work completed for final crossing – UPRR − Stage 1 – interim within UPRR R/W − Complex and Stage 2 – IDOT
• Design completed by entity handling construction • ICC Collaborates during Design • Final Submitted to ICC for Approval
![Page 22: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/22.jpg)
22
Cab Signals and X-ITCS
110
79
15
0
Conventional Crossing Warning System Approach Circuit Limit configured for 79mph approach
Speed Limit (MPH)
Highway Crossing Warning System equipped with:
• Four-Quadrant Gates • Exit Gate Management System • Highway Vehicle Occupancy
Detection • X-ITCS Communications Equipment
Amtrak Locomotive Equipped with UP Cab
Signals and X-ITCS
Locomotive sends request (via radio) to crossing to “arm” for high-speed operation and 80sec warning time, allowing operation at speeds greater than allowed by conventional approach circuit
If all crossing subsystems are “healthy”, crossing arms and sends acknowledgement to locomotive which allows high-speed operation ( )
If all crossing subsystems are not “healthy”, crossing sends indication which causes locomotive to restrict speed of train ( )
If crossing subsystems become unhealthy or a vehicle is detected in the crossing after activation, crossing sends indication which causes locomotive to restrict speed of train ( )
If locomotive never receives acknowledgement from crossing, locomotive restricts speed of train to speed limit allowed by conventional approach circuit ( )
![Page 23: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/23.jpg)
23
PTC/Signal Options
• I-ETMS Highway Crossing Advanced Activation Function – Significant Technical and Schedule Risk
• I-ETMS / ITCS Integrated On-Board Sys. – Significant Technical and Schedule Risk
• I-ETMS / ITCS Co-Operation – Does not Meet UP PTC Requirements
• I-ETMS + Illinois XITCS – Utilizes I-ETMS PTC System – Installation within Construction Period
![Page 24: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/24.jpg)
24
PTC Implementation Process
• UPRR responsible for wayside infrastructure – PTC Communication System – X-ITCS Equipment at Crossings – Wayside Signal Equipment
• On-board equipment and systems – I-ETMS / X-ITCS requires on-board locomotive equipment – Lead Time for retrofit – Amtrak and UP responsible for their own equipment
• IDOT program team coordinates and provides funding
![Page 25: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/25.jpg)
25
Construction Challenge
• Funding Deadline – Project Closed Out by September 2017
– Requires Construction to be Complete May 2017
• Three Construction Seasons Remain • Negotiated Curfews w/ Amtrak & IDOT
– Busing State Supported Amtrak Service
– Re-routing Texas Eagle
– Re-routing UP Freight Business
• Curfews – three per year 2013-2015
![Page 26: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/26.jpg)
26
Major Bridge Work Bridge Projects–$90 million of HSR funding
Current 110mph Segment
IHB
Dwight
Pontiac
Chenoa
Ballard
Normal (Amtrak Station)
MP 126.4
Chicago
Bloomington
Joliet Intermodal Facility
CP Canal
Wilmington
NS
TPW
Metra
Elwood
Mazonia
Proposed Enbridge Faciliy
NS NS
I&M
St. Louis
MP 126.4
Bloomington
KCS
BNSF
NS
BNSF
CN
NS
Hazel Dell
Iles
200 Total structures • 38 Major structures
• 18 Completed • 20 Remain
![Page 27: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/27.jpg)
27
2013 Curfews
• Three Curfews – 2 of 3 complete – 2-No. 24 & 1-No. 20 Concrete Switches
– 14 Bridges
![Page 28: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/28.jpg)
28
Maintenance Issues at 110mph
• Class 6 standards – Geometry Car – run 4 times/year
• Findings: −Minimal issues overall −6+/- crossings – profile −Signal Trouble Calls
• Activities since: −CAT Tamper Gang −Local M/W Gang
![Page 29: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/29.jpg)
29
Agreements – 12
• 2010 Construction Agreement – IDOT • 2011 Construction Agreement – IDOT • Service Out Agreement – IDOT, FRA, Amtrak • Maintenance Agreement – IDOT • Operating Agreement – IDOT, Amtrak • Busing Agreement – Amtrak • Joliet UD Tower Agreements – Metra, Amtrak, BNSF,
City of Joliet • KCS Agreements – Operating / Construction /
Maintenance
![Page 30: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/30.jpg)
30
Where to Find Business Opportunities
For Business Opportunities: • Visit the Doing Business section of
www.idothsr.org. » Find details
about the bidding process and current business opportunities
» Find related links for detailed procedures
![Page 31: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/31.jpg)
31
www.idothsr.org
![Page 32: Illinois High Speed Rail Project · 2017. 1. 4. · 4 High-Speed Intercity Passenger Rail Program • $8 Billion funding American Recovery and Reinvestment Act (ARRA). • Partnership](https://reader036.fdocuments.net/reader036/viewer/2022071110/5fe5f2d5a64dea649166b485/html5/thumbnails/32.jpg)
32
Questions