ILE Project

Integrated Logistics EnvironmentKickoff Meeting

Location: Mystic Marriott HotelGroton, CT

Date:Date: Thursday, June 17, 2010Thursday, June 17, 2010

Overview Presented by: Overview Presented by:

Dr. Burton GischnerDr. Burton Gischner

Page 2: ILE Project Integrated Logistics Environment Kickoff Meeting

2

ILE Project Overview

GoalsGoals Objectives Objectives Project AdministrationProject Administration Technology Transfer ActivitiesTechnology Transfer Activities Program Management, Technology Program Management, Technology

Transfer, and Software Development PlansTransfer, and Software Development Plans Deliverables and MilestonesDeliverables and Milestones Schedule for Upcoming MeetingsSchedule for Upcoming Meetings

Page 3: ILE Project Integrated Logistics Environment Kickoff Meeting

3

Goals Tools and Methods for Supporting Next Tools and Methods for Supporting Next

Generation Shipbuilding IPDE (SCIM Generation Shipbuilding IPDE (SCIM Evaluation)Evaluation)– This task will demonstrate the capabilities of the

NPDI SCIM as the means for supporting the next generation IPDE

Completion of the Ship Common Information Model (SCIM Development)– This task proposes to complete the remaining

chapters of the Ship Common Information Model

Page 4: ILE Project Integrated Logistics Environment Kickoff Meeting

4

Objectives

Tools and Methods for Supporting Next Tools and Methods for Supporting Next Generation Shipbuilding IPDE (SCIM Evaluation)Generation Shipbuilding IPDE (SCIM Evaluation)– This task will apply the tools and methods developed by

the ISE team to two current shipbuilding requirements: VIRGINIA Class IPDE data migration and sharing of DDG 1000 structural design data with manufacturing systems across shipyards

– Moreover, this task will use the NPDI Ship Common Information Model (SCIM) as the basis for these two pilots

– As a result, this task will not only benefit current Navy programs but will also demonstrate the capabilities of the NPDI SCIM as the means for supporting interoperability of the next generation IPDE

Page 5: ILE Project Integrated Logistics Environment Kickoff Meeting

5

Objectives cont’d. Completion of the Ship Common

Information Model (SCIM Development)– The Ship Common Information Model (SCIM)

was defined as requiring fifteen chapters to specify the requirements for exchange of product model data among shipyards and the Navy. The development of eight of these chapters has been funded through NSRP under the Navy Product Data Initiative (NPDI).

– This effort will complete the SCIM and thereby will facilitate the data exchanges to be developed within the Integrated Logistics Environment

Page 6: ILE Project Integrated Logistics Environment Kickoff Meeting

6

Project Administration

Project is administered and led by Project is administered and led by Electric Boat (EB) Electric Boat (EB)

Subcontractors:Subcontractors:– Northrop Grumman Shipbuilding (NGSB)Northrop Grumman Shipbuilding (NGSB)– Northrop Grumman Technical Services (NGTS) Northrop Grumman Technical Services (NGTS) – Product Data Services (PDS)Product Data Services (PDS)

Administration will be guided by a Administration will be guided by a Program Management Plan to be Program Management Plan to be developed in the next few weeksdeveloped in the next few weeks

Page 7: ILE Project Integrated Logistics Environment Kickoff Meeting

7

Project Exploder

The Exploder established for the ISE-4, The Exploder established for the ISE-4, ISE-5, and ISE-6 Projects will continue to ISE-5, and ISE-6 Projects will continue to be used for ILEbe used for ILE

It is entitled:It is entitled:– NSRP–[email protected][email protected]

In addition, a Bulletin Board remains available under the ISETools.org website– Permits threaded discussions– Automated Registration– Ability to only retrieve messages when

desired

Page 8: ILE Project Integrated Logistics Environment Kickoff Meeting

8

ISETools.org Bulletin Board

Accessible from the ISE Tools websiteAccessible from the ISE Tools website– http://http://www.isetools.orgwww.isetools.org» Click on Bulletin BoardClick on Bulletin Board

Communicate with other registered Communicate with other registered membersmembers– Automated registrationAutomated registration– Create new discussion topicsCreate new discussion topics– Reply to existing discussion topicsReply to existing discussion topics– Include attachments with your messageInclude attachments with your message– Receive e-mail notifications of new replies, as Receive e-mail notifications of new replies, as

desireddesired

Page 9: ILE Project Integrated Logistics Environment Kickoff Meeting

9

Technology Transfer Activities

Updates and Presentations during 1Updates and Presentations during 1stst Year Year– Project Updates will be given at each System Project Updates will be given at each System

Technology Panel MeetingTechnology Panel Meeting» Next Meeting: Next Meeting: Washington, DCWashington, DC Sept. – Oct. Sept. – Oct.

20102010» Following Meeting: New Orleans, LA Dec. 2010Following Meeting: New Orleans, LA Dec. 2010

– Presentation at: Ship Production SymposiumPresentation at: Ship Production Symposium» Bellevue, WABellevue, WA November 3-5, 2010November 3-5, 2010

– Possible Presentation at: ShipTech 2011Possible Presentation at: ShipTech 2011» Biloxi, MSBiloxi, MS March 15-16, 2011March 15-16, 2011

Page 10: ILE Project Integrated Logistics Environment Kickoff Meeting

10

Program Management PlanTechnology Transfer Plan

Software Development Plan

These three deliverables will guide the execution These three deliverables will guide the execution of the projectof the project

Will be completed and delivered by June 30, 2010Will be completed and delivered by June 30, 2010

Page 11: ILE Project Integrated Logistics Environment Kickoff Meeting

11

Deliverables and Milestones

Each of the two tasks will have a set of Each of the two tasks will have a set of Deliverables and Milestones at the end of each Deliverables and Milestones at the end of each Quarter, and there will be a Wrap-up Meeting and Quarter, and there will be a Wrap-up Meeting and Final Report in Washington, DC at the conclusion Final Report in Washington, DC at the conclusion of Month 12 for the SCIM Evaluation Task (Task 1) of Month 12 for the SCIM Evaluation Task (Task 1) and at the conclusion of Month 24 for the SCIM and at the conclusion of Month 24 for the SCIM Development Task (Task 2)Development Task (Task 2)

There will also be a Business Status Report and a There will also be a Business Status Report and a Technical Status Report issued as a Deliverable at Technical Status Report issued as a Deliverable at the end of each Quarterthe end of each Quarter

The list below provides a description of the The list below provides a description of the deliverables for each taskdeliverables for each task

Page 12: ILE Project Integrated Logistics Environment Kickoff Meeting

12

Deliverables and Milestones cont’d.

TaskTask MonthMonth DeliverableDeliverable1.11.1 22 Report on Extraction of Piping Data in SCIM Format from Report on Extraction of Piping Data in SCIM Format from

VIRGINIA VIRGINIA IPDEIPDE1.11.1 55 Report on Extraction of Structural Data in SCIM Format from Report on Extraction of Structural Data in SCIM Format from

VIRGINIA IPDEVIRGINIA IPDE1.11.1 88 Analysis of SCIM Piping & Structural Models vs. Data Needed for Analysis of SCIM Piping & Structural Models vs. Data Needed for

VIRGINIA MigrationVIRGINIA Migration1.11.1 1111 Final Wrap-up Meeting & Report of SCIM Deficiencies in Piping & Final Wrap-up Meeting & Report of SCIM Deficiencies in Piping &

Structural and RecommendationsStructural and Recommendations1.21.2 22 Structural Model Import Requirements Report for DDG 1000Structural Model Import Requirements Report for DDG 10001.21.2 55 SCIM Gap Analysis Report for DDG 1000SCIM Gap Analysis Report for DDG 10001.21.2 88 SCIM Dataset Results Report for DDG 1000SCIM Dataset Results Report for DDG 10001.21.2 1111 Final Wrap-up Meeting & Import Results Report for DDG 1000Final Wrap-up Meeting & Import Results Report for DDG 100022 1414 Complete SCIM Chapters for HVAC Functional & Physical DesignComplete SCIM Chapters for HVAC Functional & Physical Design22 1717 Complete SCIM Chapters for Electrotechnical Functional & Complete SCIM Chapters for Electrotechnical Functional &

Physical Physical DesignDesign22 2020 Complete SCIM Chapters for Pipe Stress & Engineering AnalysisComplete SCIM Chapters for Pipe Stress & Engineering Analysis22 2323 Complete SCIM Chapter for Structural CAM (Lofting & Complete SCIM Chapter for Structural CAM (Lofting & Nesting)Nesting)22 2424 Final ReportFinal Report

Page 13: ILE Project Integrated Logistics Environment Kickoff Meeting

13

Deliverables and Milestones cont’d.

MonthMonth DeliverableDeliverable22 1st Qtr Business & Technical Status Reports 1st Qtr Business & Technical Status Reports 55 2nd Qtr Business & Technical Status Reports2nd Qtr Business & Technical Status Reports88 3rd Qtr Business & Technical Status Reports3rd Qtr Business & Technical Status Reports1111 4th Qtr Business & Technical Status Reports4th Qtr Business & Technical Status Reports1414 5th Qtr Business & Technical Status Reports5th Qtr Business & Technical Status Reports1717 6th Qtr Business & Technical Status Reports6th Qtr Business & Technical Status Reports2020 7th Qtr Business & Technical Status Reports7th Qtr Business & Technical Status Reports2323 8th Qtr Business & Technical Status Reports8th Qtr Business & Technical Status Reports

Page 14: ILE Project Integrated Logistics Environment Kickoff Meeting

14

Schedule for Upcoming Meetings

June 2010 June 2010 – – Kickoff Meeting Kickoff Meeting – – Groton, CTGroton, CT Oct. 2010 Oct. 2010 –– Technical/Design Review Meeting Technical/Design Review Meeting – – Virginia Beach, Virginia Beach,

VAVA Nov. 2010 Nov. 2010 – – Presentation at SPS Presentation at SPS – Bellevue, WA– Bellevue, WA Jan. 2011 Jan. 2011 – – Technical/Design Review MeetingTechnical/Design Review Meeting – Groton, CT– Groton, CT Mar, 2011 – Mar, 2011 – Presentation at ShipTech 2011 Presentation at ShipTech 2011 – Biloxi, MS– Biloxi, MS Apr. 2011 Apr. 2011 – – Team Meeting Team Meeting – Washington, – Washington,

DCDC May 2011 May 2011 – – Kickoff Meeting for Task 2 Kickoff Meeting for Task 2 – Groton, CT– Groton, CT Oct. 2011 Oct. 2011 – – Technical/Design Review MeetingTechnical/Design Review Meeting – – Virginia Beach, Virginia Beach,

VAVA Nov. 2011Nov. 2011 – – Presentation at SPS Presentation at SPS – Houston, TX– Houston, TX Jan. 2012 Jan. 2012 – – Technical/Design Review MeetingTechnical/Design Review Meeting – – Washington, Washington,

DCDC Mar, 2012 – Mar, 2012 – Presentation at ShipTech 2012 Presentation at ShipTech 2012 – – Biloxi, MSBiloxi, MS Apr. 2012 Apr. 2012 –– Final Team MeetingFinal Team Meeting – – Washington, Washington,

DCDC