ILA Technical Symposium, Boulder, CO 4-6 NOV 03

21

description

On Air with the New Solid State Transmitter. Presented by Jim Betz. ILA Technical Symposium, Boulder, CO 4-6 NOV 03. New Timing and Control Equipment At LSU Wildwood, NJ. New Transmitter At LSU Wildwood, NJ. Building Construction Begins At LORSTA George, WA. - PowerPoint PPT Presentation

Transcript of ILA Technical Symposium, Boulder, CO 4-6 NOV 03

Page 1: ILA Technical Symposium,  Boulder, CO 4-6 NOV 03
Page 2: ILA Technical Symposium,  Boulder, CO 4-6 NOV 03

New Timing and Control Equipment At LSU Wildwood, NJ

Page 3: ILA Technical Symposium,  Boulder, CO 4-6 NOV 03

New Transmitter At LSU Wildwood, NJ

Page 4: ILA Technical Symposium,  Boulder, CO 4-6 NOV 03

Building Construction Begins At LORSTA George, WA

Page 5: ILA Technical Symposium,  Boulder, CO 4-6 NOV 03

New Transmitting Complex At LORSTA George, WA

(bottom – left)

Page 6: ILA Technical Symposium,  Boulder, CO 4-6 NOV 03

New Transmitting Complex At LORSTA George, WA

Page 7: ILA Technical Symposium,  Boulder, CO 4-6 NOV 03

New Transmitter Room At LORSTA George, WA

Page 8: ILA Technical Symposium,  Boulder, CO 4-6 NOV 03

New Operations Room At LORSTA George, WA

Page 9: ILA Technical Symposium,  Boulder, CO 4-6 NOV 03

Ready To Install New Equipment At LORSTA George, WA

Page 10: ILA Technical Symposium,  Boulder, CO 4-6 NOV 03

New Equipment At LORSTA George, WA

Page 11: ILA Technical Symposium,  Boulder, CO 4-6 NOV 03

New Timing and Control Equipment At LSU Wildwood, NJ

Page 12: ILA Technical Symposium,  Boulder, CO 4-6 NOV 03

New Transmitter At LORSTA George, WA

Page 13: ILA Technical Symposium,  Boulder, CO 4-6 NOV 03

New Transmitter At LSU Wildwood, NJ

Page 14: ILA Technical Symposium,  Boulder, CO 4-6 NOV 03

ET1 McKinney Changing Antenna Feed At George, WA

Page 15: ILA Technical Symposium,  Boulder, CO 4-6 NOV 03

Mr. Paulus Has The Honor At LORSTA George, WA

Page 16: ILA Technical Symposium,  Boulder, CO 4-6 NOV 03

Old Equipment Secured At LORSTA George, WA

Page 17: ILA Technical Symposium,  Boulder, CO 4-6 NOV 03

Old Tube Transmitter Silent At LORSTA George, WA

Page 18: ILA Technical Symposium,  Boulder, CO 4-6 NOV 03

Whidbey Island TD 5990Y

0

50

100

150

200

250

300

350

Time (hrs)

TD

(n

Sec

)

15-Oct 23-Oct

OCTOBER 15 OCTOBER 23

MEAN 28405.259 28405.264

MEDIAN 28405.261 28405.263

MAX 28405.286 28405.291

MIN 28405.218 28405.240

Page 19: ILA Technical Symposium,  Boulder, CO 4-6 NOV 03

Whidbey Island SNR 5990Y

0

5

10

15

20

25

30

35

40

17:06

18:06

19:06

20:06

21:06

22:06

23:06 1:

062:06

3:06

4:06

5:06

6:06

7:06

8:06

8:36

Time (hrs)

SN

R (

dB

)

15-Oct 23-Oct

Whidbey Island ECD 5990Y

0

0.5

1

1.5

2

2.5

3

17:06

18:06

19:06

20:06

21:06

22:06

23:06 1:

062:06

3:06

4:06

5:06

6:06

7:06

8:06

8:36

Time (Hrs)

EC

D (

uS

ec)

15-Oct 23-Oct

OCTOBER 15 OCTOBER 23

MEAN 35.00 31.77

MEDIAN 36.00 33.00

MAX 38.00 37.00

MIN 31.00 23.00

OCTOBER 15 OCTOBER 23

MEAN 2.37 1.65

MEDIAN 2.36 1.64

MAX 2.78 1.78

MIN 2.22 1.55

Page 20: ILA Technical Symposium,  Boulder, CO 4-6 NOV 03

Commissioning Crew At LORSTA George, WA

Page 21: ILA Technical Symposium,  Boulder, CO 4-6 NOV 03

Primary TOT(Secondary)

RF Gate

SecondaryPCI

PCI

SZC

SecondaryTransmits

SZC

LocusTINO

Alternate TOT(Secondary)

UTC(Secondary)

XMTRDelay

MasterPCI

MasterUTC

PCI

RF Gate

Master receivedat Secondary

RF Gate

Loran(Master)

RF Gate

Secondary received at Master

UTC

Baseline Length(in Usec)

UTC

MasterTransmitter

Delay

Alternate TOT(Master)

LocusTINO

(Master)SZC

SZC

Baseline Length(in uSEC)

(Secondary)(Secondary)

Loran(Secondary)

Primary TOT(Master 30 uSEC)

MasterTransmitsSZC

Timing Ladder Diagram