Il nuovo paradigma del Data-Center
-
Upload
festival-ict-2014 -
Category
Technology
-
view
316 -
download
7
description
Transcript of Il nuovo paradigma del Data-Center
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 1
A strong familyThe Friedhelm Loh Group – a successful businessThe Friedhelm Loh Group a successful business
11,500 65More than
,employees worldwide
65int. subsidiaries
15 2.2 bn15 2.2 bnproduction sites euros turnover
Figures based on 2013
2Rittal – The company. I 08/2014
Satisfied customers are the best referenceSuccessful companies put their trust in RittalSuccessful companies put their trust in Rittal
3Rittal – The company. I 08/2014
Discovery 26 726.7kilometres – the length of the circular underground tunnel of the particle accelerator at the CERNparticle accelerator at the CERN research centre near Geneva. This is where the Higgs boson was discovered in 2012 – with a little bit of help from TS 8
l ith ienclosures with accessories from Rittal.
4
Starry starry nights 7070trillion or so stars sparkle in our skies. To get increasingly accurate results and make new discoveriesresults and make new discoveries, researchers form the University of Pune, India, are using a modular and scalable data centre solution from Rittal.
5
Digitised150,000150,000manuscripts and over 5 million books of the Vatican Apostolic Library are digitised with the help of a data centre supplied byof a data centre supplied by Rittal.
6
500 000Secure
500,000fans have tried to get their hands on tickets for 2014 World Cup final in Rio de Janeiro. Rittal is equipping the localRittal is equipping the local centres with 96 TS 8 server racks and 26 AE compact enclosures, to ensure processes are secure.
7
Into the future with intelligent solutionsIT infrastructure: Flexible Standardised A perfect fitIT infrastructure: Flexible. Standardised. A perfect fit.
A smart modular system, from IT rack to full-fledged d t tdata centres
Efficient solutions for rack, suite and room cooling
High-performance g pmanagement software (DCIM) with suitable interfaces
Online tools facilitateOnline tools facilitate selection
8Rittal – The company. I 08/2014
L’efficienza nell’era dell’Internet of Thingsdell Internet of Things
Scenari in evoluzioneLe sfide di un moderno Data CenterLe sfide di un moderno Data-CenterL’efficienza ed il risparmio energeticop gIl nuovo paradigma del Data-Center
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 9
Scenari in evoluzione
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 10
La terza piattaforma
The Internet of ThingsThe Internet of Things
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 11
Internet of Thingsg
L’I t t f Thi ( I t t• L’Internet of Things (o Internet degli Oggetti) è un neologismo riferito all'estensione di Internet al mondo degli oggetti com nimondo degli oggetti comuni.
• Non si tratta di smartphone o tablet. L'Internet degli oggetti è una vera e propria evoluzione della Rete.
• Gli oggetti si rendono riconoscibili e acquisiscono intelligenza grazie q g gal fatto di poter collezionare dati e accedere ad informazioni aggregate da parte di altri.
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 12
La crescita degli oggettig gg
L it d li O tti• La crescita degli Oggetti Intelligenti è esponenziale: entro il 2020 saranno più di 50 Miliardi
• Le applicazioni sono infinite: – le sveglie suonano prima in caso
di traffico;– le piante comunicano
all'innaffiatoio quando è il momento di essere innaffiate;le scarpe da ginnastica– le scarpe da ginnastica trasmettono tempi, velocità e distanza per gareggiare in tempo reale con persone dall'altra parte del globo.
• Tutti gli oggetti possono acquisire un ruolo attivo grazie alla Rete.
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 13
Cambiano logiche e modelli IT: da Traditional a Cloud Models
Cloud Services l d l
Traditional IT
Cloud Models
Deployment ModelsDeployment Models
Dedicated/Single‐tenant Shared/Multi‐tenant
Traditional Self run ManagedP Dedicated Virtual
Hosted Private Cloud
TraditionalOn‐Premise
IT
TraditionalOutsourcing
Self‐runPrivate Cloud
ManagedPrivateCloud
DedicatedPrivate Cloud
PublicCloud
VirtualPrivate Cloud
Customer site Service provider site
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 14
Big Datag
O i i ti l• Ogni giorno vengono creati nel mondo 2,5 exabyte di dati (equivalenti a c.a. 2,5 Miliardi di HD da 1 TB))
• Il 90% dei essi è stato creato solo negli ultimi due anni. Questi dati
i t tivengono registrati ovunque: – sensori di monitoraggio ambientale, – post sui social media, – video ed immagini digitalivideo ed immagini digitali, – record delle transazioni di acquisto – segnali GPS.
Questi tipi di dati vengono definiti big data.
Fonte: IBM 2013
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 15
Principali priorità IT per le aziende italiane a 12/18 mesi
Consolidamento e virtualizzazione
Innovazione e modernizzazione infrastrutture
Automazione e ottimizzazione dei processi IT
infrastrutture
Gestione mission critical workload,
Accelerazione ambienti data warehouse e business intelligence
Compliance e sicurezza IT
business continuity e disaster …
Outsourcing dei servizi IT
Governo e integrazione di modelli ibridi e sistemi eterogenei
0% 10% 20% 30% 40% 50% 60%
Outsourcing dei servizi IT
Fonte: IDC Italia Websurvey 2H 2013 n 60
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 16
Fonte: IDC Italia Websurvey, 2H 2013, n=60
Le sfide di un moderno Data Center
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 17
Disponibilità, scalabilità, efficienzap , ,Disponibilità
Component reliabilityRedundancy
Location securityPhysical securitySystem integrityb fAbsence of SPoF
Infrastructure&Staff Control
ScalabilitàScalable investments
Capacity managementRelocation
EfficienzaComponent efficiency
System efficiencyOPEX lOPEX control
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 18
Disponibilità, scalabilità, efficienza
UPS systems RiZoneRoom, raised floor,rack cooling
p , ,
1‐18 kVA, 1‐phase10 – 960 kW, 3‐phase Manages and monitors the
entire data centre
rack coolingIndividual cooling concepts
Server racksA large range with comprehensive accessories
Power distributionFully wired and contact hazard proof
IT recooling systemsH li i l i f
Network enclosuresNetwork enclosures
Sensor networkPipework
Holistic solutions for IT cooling
Security rooms
IT wall‐mounted enclosures
Sensor networkmonitoringOptimum availability& transparency
pOptimum design
Security roomsProtection against a large number of physical hazards
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 19
Low-voltage maindistributor with Ri4Power• Busbar systems up to 5,500 A for i di id l fi ti
Power back-up with the UPS system PMC
• Rack-mounted, modular design
Power sub-distributionwith PDR and PDM
• Modular construction; can be
Power distribution inside the rackwith PSMPl d l lindividual configurations
• Integrates measuring systems for different works
• Scalable up to 960 kW
• Highly efficient, with 95% energy conversion efficiency in the partial load range already
extended with the system operational
• Phase current up to 250 A at the input; VDE-certified
• Shock-hazard protected
• Plug and play power supply
• Modules with different sockets
• Manageable modules with current measuring and switching functionsShock hazard protected g g
POWER: Efficienza e risparmio energetico dei sistemi di alimentazione e di t ib i d ll’ i
20Alessio Nava – Direttore Divisione IT & Telecomunicazioni
distribuzione dell’energia
IT chiller & Piping systems
Room-based coolingRack-based cooling Suite-based cooling
• Cooling output from 8.5 to462 kW
• Redundant pump design
• Optimised COP value
• Cooling output up to 118 kW
• Efficiency can be increased with optional aisle containment systems
• Optimised energy and room efficiency
• High-performance cooling with up to 30 kW / rack
• High energy efficiency
• Cooling system integrated into the enclosure suite
• Efficiency can be increased withoptional aisle containment systems
• Raised floor not required• Inexpensive plastic pipeworkroom efficiencyRaised floor not required
COOLING: Efficienza e risparmio energetico dei sistemi di climatizzazione
21Alessio Nava – Direttore Divisione IT & Telecomunicazioni
p g
Efficienza e risparmio energetico
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 22
Efficienza Energeticag
PUE è t i t d d il• PUE è una metrica standard per il calcolo dell’efficienza energetica.
• La media attuale (secondo UptimeInstitute) è compresa tra 1,8 e 1,89
F t ©
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 23
Fonte: © Uptime Institute
RiZone : software DCIM
RiZ è il f DCIM diRiZone è il software DCIM di Rittal sviluppato per ilmonitoraggio e la gestione di complesse infrastrutture Data Center.
• Rack• Power• Cooling• Sicurezza (controllo accessi,
sensori ambientali)sensori ambientali)• Calcolo dell’efficienza e del
consumo energetico
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 24
Controllo continuo dello stato del sistema
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 25
Analisi e sicurezza dei dati Graphic‐Editor:animated views and diagrams
Workflow‐Editor:control loops,
Alarm sequencesAlarm sequences
Calculation Engine:mathematical and logical
expressions p
Report Engine:CSV‐files
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 26
Analisi dei consumi
Server‐,Infrastructure‐,
Total‐Power consumption
PUECO2‐Emissionpower costs
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 27
IT SystemsRizone – Management pack con measurement capability
RiZone MKD KVM Dynamic Rack Control• is the data centre management software from Rittal
• permits the administration of the complete physical infrastructure of a data centre
• Compact design, 1 U only
• Various keyboard layouts
• VGA input
• Optional KVM switch (SSC view)
• The right KVM solution for any KVM solution
• KVM-over-IP and multi-userenvironments with up to 2,048 servers
• May be extended at any time
• Asset management based on RFID
• Exact overview of unused U slots inside the rack
• Information is saved on tags as specified by ISO standardsof a data centre p ( )
for 8 or 32 servers may be integrated • May be extended at any time specified by ISO standards
28Alessio Nava – Direttore Divisione IT & Telecomunicazioni
CoolingA detailed view …
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 2929Alessio Nava – Direttore Divisione IT & Telecomunicazioni
CoolingRoom Cooling
Room Cooling:– CRAC– Chilled water supply– Raised floor, perforated tiles– Aisle containment– For low power consumption per rack
(<4 kW) Principle:
– Cold air moves under the raised floor– Perforated tiles and perforated server
doors– Warm exhaust air at rear door– CRAC unit takes in the warm air– An heat exchanger cools down the air– Circulation starts again
3030Alessio Nava – Direttore Divisione IT & Telecomunicazioni
CoolingRow Cooling
Row Cooling:– Heat Exchanger inside rack row– Chilled water– No raised floor– Aisle containment to separate warm
f ldfrom cold– Mid range power consumption
(<15 kW)P i i l Principle:
– Cold air blown in the cold aisle– Perforated server doors– Warm exhaust air at rear door– Heat exchanger takes in warm air– Circulation re-starts
3131Alessio Nava – Direttore Divisione IT & Telecomunicazioni
CoolingRack Cooling
Rack Cooling:– Heat exchanger in row of racks– Dedicated to one or two racks– No raised floor– No aisle containment– Glas doors– High power consumption (>10 kW)
Principle:– Cold air blown behind glas door in front
of the servers– Warm exhaust air at backside of
servers but inside rack– Exhaust air will taken in by heat
exchangerCi l i– Circulation re-starts
3232Alessio Nava – Direttore Divisione IT & Telecomunicazioni
Soluzioni a confronto
100kW a Milano Tipo di PUE Costo annuo Risparmio Risparmio100kW a Milano, esp a 200kW
Tipo di soluzione
PUE (*)
Costo annuo (0,13 €/kWh)
Risparmio vs. CW 7°C
Risparmio vs DX
S l i DX Raffr. 1 43 162 848 88 €Soluzione DX ambientale 1,43 162.848,88 €
Solutione CW Raffr. 1 41 160 456 20 €(Tw=7°C) Ambientale 1,41 160.456,20 €
Soluzione CW (T 15°C)
Raffr. i i 1,29 147.802,20 € 126.540,60 € 150.462,50 €(Tw=15°C) precisione 1,29 147.802,20 € 126.540,60 € 150.462,50 €
Soluzione CW Closed loop 1 27 144 943 00 € 155 132 00 € 179 053 90 €(Tw=18°C) Closed loop 1,27 144.943,00 € 155.132,00 € 179.053,90 €
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 33
Il nuovo paradigma del Data-Center
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 34
La standardizzazione rende il Data-Center
Data Centre solutions (I)
più efficiente, più flessibile e più competitivo
Component-based Data CentreRiMatrix
Module-based Data CentreRiMatrix S
Data Centre solutions (I)
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 353535
ENCLOSURES POWER DISTRIBUTION CLIMATE CONTROL IT INFRASTRUCTURE SOFTWARE & SERVICES
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 36CeBIT / RiMatrix S / February 2013Hanstein/RiMatrix S Expert Training/February 2013 3636MAK/August 2012
ENCLOSURES POWER DISTRIBUTION CLIMATE CONTROL IT INFRASTRUCTURE SOFTWARE & SERVICES
Disponibile in quattro configurazioni basep q g
Single6, 60 kW, N+1 Single9 90 kW N+1g , ,Double6, 120 kW, 2(N+1)
Single9, 90 kW, N+1Double9, 180 kW 2(N+1)
• Il primo data cente prodotto in serie, per essere pronto all‘uso
• L’alternativa rivoluzionaria allacostruzione di un DC individuale
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 37
serie, per essere pronto all uso individuale
Tre varianti per altrettanti livelli di sicurezzap
Fire Extinguishing water
Corrosive gases Vandalism Unauthorised access
Electromagn.interference
Dust Falling debris Theft/burglary
Security roomStandard room Indoor Container
Unauthorised access
Falling debris Theft/burglary
Fire Extinguishing water
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 38
RiMatrix SClimate control – ZUCS Zero U-Space CoolingClimate control ZUCS Zero U Space Cooling
Consistent arrangement of all cooling components in Zero U-Space of the data centre – the raised floor –
no requirement for space on the server surface
Optimum ventilation with minimal redirections that might cause unnecessary pressure loss.
All components are consistently arranged to correspond to physical requirements. They are placed right in the optimum place
f th li t di thof the cooling system, surrounding the servers that represent the centre of the system.
3939Alessio Nava – Direttore Divisione IT & Telecomunicazioni
Driver per l’adozione di modular DCp
Fonte: IDC Survey, 2014(Germany, U.K., Sweden, Italy, Netherlands; n=500)
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 40
Benefici
TempoCosti p
ServiceQualità ServiceQualità
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 41
Prestazioni
PUE = 1 15PUE = 1,15
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 42
Time-to-market
Operativo in 6Operativo in 6 settimanesettimane
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 43
Certificazione
Certificato TÜVCertificato TÜV
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 44
Garanzia
Estensione diEstensione di garanziag
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 45
Un codice, un prezzo, p
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 46
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 47CeBIT / RiMatrix S / February 2013Hanstein/RiMatrix S Expert Training/February 2013 4747MAK/August 2012
ENCLOSURES POWER DISTRIBUTION CLIMATE CONTROL IT INFRASTRUCTURE SOFTWARE & SERVICES
Soluzioni a confronto100kW a Milano, esp a 200kW
Tipo di soluzione
PUE (*)
Costo annuo (0 13 €/kWh)
Risparmio vs CW 7°C
Risparmio vs DXesp a 200kW soluzione (*) (0,13 €/kWh) vs. CW 7°C vs DX
Soluzione DX Raffr.ambientale 1,43 162.848,88 €ambientale
Solutione CW (Tw=7°C)
Raffr. Ambientale 1,41 160.456,20 €( w )
Soluzione CW (Tw=15°C)
Raffr. precisione 1,29 147.802,20 € 126.540,60 € 150.462,50 €
Soluzione CW (Tw=18°C) Closed loop 1,27 144.943,00 € 155.132,00 € 179.053,90 €( w )
Soluzione Rimatrix S 1,15 130.961,68 € 294.950,00 € 318.870,00 €, , , ,
Alessio Nava – Direttore Div. IT e Telecomunicazioni – 2014 48
RAI, TELECOM ITALIA, LAMBORGHINI, RSA,BANCA POPOLARE VICENZA, OSPEDALEVALDUCE COMO, UNIVERSITA’ BOLZANO, CASSANAZIONALE FORENSE EURAC INFNNAZIONALE FORENSE, EURAC, INFN,UNIVERSITA’FEDERICOIINAPOLI,BREMBO,AUSLFORLI’, MOBY LINES, FIERA VICENZA, GRUPPOD’ARCO, SELECTA, ISTITUTO EUROPEO, ,ONCOLOGICO MILANO, ISTITUTO SUPERIORESANITA’, PROTEZIONE CIVILE, MOBY LINESMILANO, TEMMLER, RANDSTAD, KME FIRENZE,TECNOPOLO TIBURTINO ROMA UNLB KTESIOSTECNOPOLO TIBURTINO ROMA, UNLB, KTESIOS,TELECITY REDBUS, BIOTECH SIENA,POLICLINICO MODENA, BRENNERCOM, CAREL,BARTOLINI, ROYAL SUN ALLIANCE, ENGINSOFT, ,BERGAMO, OSPEDALE VERONA, MEDIOLANUMFARMACEUTICA, ENAV, ARUBA, ICTP TRIESTE,DAS, INDUSTRIES GROUP , IFOM, BIBLIOTECAAPOSTOLICAVATICANA NESTLE’ ROCHE e moltiAPOSTOLICAVATICANA, NESTLE’, ROCHE, e moltialtri…
@ itt l [email protected]