Ignazio deiana portfolio 2016

16
2016 P O R T F O L I O Ignazio Deiana Merchant Street, Mile End, London E3 4PG Mobile : 07752 946302 [email protected]

Transcript of Ignazio deiana portfolio 2016

Page 1: Ignazio deiana portfolio 2016

2016

P O R T F O L I O

Ignazio DeianaMerchant Street, Mile End, London E3 4PGMobile : 07752 946302 [email protected]

Page 2: Ignazio deiana portfolio 2016

Roof

0.35

0.35

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

1st

2nd

3rd

4th

5th

6th

Ground

2300

Dalgleish St Limehouse Company: MGL Architets

Details

The proposal was for entirely residential development of 60 units.

The applications was previously a mixed-use development.

The proposed residential development was to offer the appropriate

levels of both private and affordable housing units.

The Dalgleish Street proposal has a distinct ‘L’ shaped footprint

which is the result of the Commercial Road development being located to

the south and western boundary. The western side of the site is

open and the proposed layout creates an open courtyard

space with the surrounding buildings.

Software: Revit-AutocadK

11 sq.m.

K15 sq.m.

LD26 sq.m.

K15 sq.m.

Bed 117 sq.m.

Bed 28 sq.m.

LKD30 sq.m.

Bed 212 sq.m

LKD25 sq. m

Bed 117 sq.m

LKD35 sq.m.

Bed 39 sq.m.

Bed 29 sq.m.Bed 1

13 sq.m.

1200

1200

1200

1200

LKD33 sq.m.

Bed 116 sq.m.

1200

1200

1200

1200

B112.5 sq.m.

1605

05 1000

GROUND Floor PlanScale

N

15

Block G

Block A

7 Storeys

14 Storeys

6 Storeys

8 Storeys

1 Storey00

Scale

05

N

10 15

Block G

Block A1 Storey

7 Storeys

14 Storeys

6 Storeys

8 Storeys

6 Storeys

Block G7 Storeys

8 Storeys

Communal store.33 sq.m.

FLAT 1

FLAT 2

FLAT 4

FLAT 3

FLAT 5

FLAT 6

FLAT 7

FLAT 9

FLAT 10

ResidentialEntrance

Garden56 sq.m.

Garden31 sq.m.

Garden37 sq.m.

Garden55 sq.m.

Garden50 sq.m.

6 sq.m.

Garden31 sq.m.

Pos

t box

es.

ResidentialEntrance

1500

3100

Communal Amenitylandscape by others 590sq.m.

child's play space TBC byothers

1100

1100 27351100

1100

2735

3100

1705

Duct Lift

13 sq.m.

Duct LiftDuct

1930

1705

19151915

1605

1930

9 sq.m.

1280L1280L

1280L1280L

1280L1280L

1280L1100L

1100L

1100L

St.

Hom

eZo

ne

20

1500

2

3

1

1

R2 ,58

R1 ,6

FLAT 8

1500

Cup'd2 sq.m.

Bed 216 sq.m.

Bed 115 sq.m.

2B3P89 sq.m.

LKD30 sq.m.

WHEELCHAIRUNIT

LKD27 sq.m.

1B2P58 sq.m.

Cup'd3 sq.m.

Cup'd2.2 sq.m.

3B4P92 sq.m.

WHEELCHAIRUNIT

Cup

'd1.

5 sq

.m.

Cup'd1 sq.m.

Bed 210 sq.m.

Cup'd3 sq.m.

Bed 310 sq.m.

3B4P103 sq.m. WHEELCHAIR

UNIT

2B3P88 sq.m.

WHEELCHAIRUNIT

Cup'd3 sq.m

Cup'd3.5 sq.m

2B3P67 sq.m.

LD26 sq.m.

K15 sq.m.

Cup'd3 sq.m.

Cup'd

4B6P130 sq.m. DUPLEX

LD26 sq.m.4B6P

130 sq.m. DUPLEX

4B6P130 sq.m. DUPLEX

Cup'd3 sq.m.

Cup'd3 sq.m.

L/D28 sq.m.

3B4P110 sq.m.

LKD

Bed

Bed

LKD

Home Zone Ref: 2901.P.01

Garden25 sq.m.

Garden45 sq.m.

1100L

Refuse store7no. waste bins

4no. recycling bins

Pos

t box

es.

TBC with LBTH Highways officer

Car Park

Page 3: Ignazio deiana portfolio 2016

2Kewbridge - Albany Court Company: MGL Architets

Details

2Kewbridge :Conversion to 35 flats (Stage F to K)

Albany Court: New Build 9 luxury flats (Stage F to K)

We were instructed by Jet Post Limited to provide an appropriate design and submit a town planning/conservation

application wich included building con-trol planning for 2 adjacent sites.

2Kew Bridge a classic Georgian archi-tectural feature had been converted

into 35 luxury flats.Albany Court in contrast, is a new build with 9 flats which were conceived in or-

der to match the style of above building.

Software: Autocad,Sketchup

F

54

5

6

6

421

321

B B

C C

7

7

F

A

D

E E

D

5700 5105 4855

7420

7420

6870

2985

5145

5745 5760 5060

3

H H

C

L / K / D L / K / D

B1

L / K / D

L / K / D L / K / DB1 L / K / D

B1

L / K / DB2B2L / K / D

B1

B1

L / K / D

B1

B1 B1

L / K / D

B1

B1

B2

1

2

78

10

3 4

5

6

9

1. 2. 3. 4. 5. 6. 7. 8. 9.

10.11.

GROUND FLOOR

SCALE 1:502.0A

ServiceD

uct W1

ServiceD

uct W1

ServiceDuct E1

ServiceDuct E2

3700

1010

3010

1260

3650

1010

2885

3365

1010

3650

1010

3415

795

1010

3390

1010

1095

2870 1010 5220

2225

4220900 10101010 995

CONSERVATORYTO BE DEMOLISHED

BAY TO BERETAINED

STAIRCASE INFILL: Refer to StructuralEngineer's design & details for infill proposalsdrawing: Horwitz 6878-R01-T1

FFL +7.61

FFL +7.61

FFL +7.61

13 Person Lift:Schindler 3300

Shaft 2000x 1700:Allowance 50mm

all sidesTotal 2100 x 1800mm

DRYRISER

CLEANERSCUPBOARD

(ALLOWANCE FOR TAPAND WASTE SINK TBC)

A

5700

6985

2430915

7160

4855

7420

5700

7125

4855

2700

595

6025

4750

2430

495

4855

5700

5285 3815

5570

4095

4235

1700 5205

1760

800

7670

1760 5065

230

430

330

1125

185

2430915

2430915

1620

Bath

SVP 9

SVP 11

C

C

Bath

C

SVP 5

2285

SVP 3

Bath

C

1985

SVP 4

Bath

C

Bath

SVP 6

C

SVP 15

SVP 20

Bath

Bath

SVP 22 CSVP 14C

Bath

SVP 10

Bath

C

CC

SVP 12

SVP 7

W

Part

ition

wal

l mov

ed10

0mm

into

B1

New

pos

ition

for t

hebe

droo

m d

oor

New positionfor SVP 12

SVP 16New position

for SVP 16

SVP 19

New

pos

ition

for S

VP

19

SVP 21

New position forSVP 21

New

pos

ition

for t

heB

athr

oom

doo

r

SVP 1 SVP 2

SVP 8

SVP 13

SS 18SVP 17

3290346535553290

2955

4340

2380

3575

2775

4280

3000

5330

2960

3955

3430

3920

3135

3955

8405

En-suite

185

1530

30552410 495

6851300 685 1300

1985 1985 615

1985

1975 625

2345690

2345

2670

1940

4245

4725

4740

5390

1700

5315

1055

1055

75

2300 2200

175

245

745

685

1810

1030

2765

1185 615

1300 685

675 1300

5760

BOUNDARY WALL

ELECTRIC SUB STATION

BOUNDARY WALL

Existing RWPand Pier brick

Existing column position to bedetermined onsite (not shown onAdelaide Jones DWG1130 100)

NEW ENTRANCE

2075

1175

500

5520

A

BD

C

A

BD

C

En-suite

En-suite

A

BD

C

A

BD

C

A

BD

C

A

BD

C

Bath

A

BD

C

A

BD

C A

BD

C

A

BD

C

A

BD

C

A

BD

C

A

BD

C

SVP 20Position to TBC

Door opening moved150mm towards shower tray

C

Page 4: Ignazio deiana portfolio 2016

Baron Street Company: MGL Architets

Details

We were appointed by MJW properties to provide full town planning

and building control application for a part change of use and extension to

create five residential units with part retention of the retail ground floor

unit in Islington, London.We divided the site into 3 blocks.The

first block is in the front, where we proposed 2 flats and the retention

of the retail commercial unit in Baron street frontage.Block 2 is the circulation core that was screened by light weight

translucent polycarbonate. Block 3 is an extension of 3 flats which were de-

signed to match the local area.

Software: Autocad,Sketchup

2380

2500

2400

2400

235

TBC

285

TBC

285

TBC

235

TBC

2400

HallwayAm

Living

Living

L.K.DAm Rear of shop

B2

L.K.D

235

2400

B2

Living

2380

12

3

4

5

6

7

8

9

10

11

12

13

14

15

235

7920

200

2505

2300

385

2400

DETAIL TBC3229.WD.56

17

1819

20

21

2025

22

23

24

25

26

27

28

29

30

31

32

33

152

168.

75

3435

36

3738

39

40

41

42

43

44

45

46

47

48

49

50

DETAIL TBC3229.WD.57

16 2245

1100

159.

58

8080

Block C Block B Block A

2940

480

2500

2465

330

515

W.01

W.06

W.11

W.16

W.17

W.02

W.07

W.12

DETAIL 3229.WD.51

3229.WD.51

3229.WD.52

DETAIL TBC 3229.WD.53

DETAIL TBC3229.WD.53

3229.WD.59

DETAIL TBC

DETAIL TBC

DETAIL TBC

3229.WD.58DETAIL TBC

3229.WD.46DETAIL TBC

385

2400

2120

2330

270

2075

665

Extensive Green flat Roofcovering, Diadem 150 orsimilar approved

2330

270

First

Second

Third

375

Roof

2500

330

2465

480

2940

Ground

Roof 13630

Fourth 10,720

Third 8085

Second 5400

First 2615

Ground

Extensive Green flat Roofcovering, Diadem 150 orsimilar approved

Trespa Rainscreen Claddingpanels or similar approved

Mansard tiled roof to newroof extensionFaceted glass to spiral

stairs

Leadflat roof to stairs

Stairwell steel frameto structural engineersdesign and specification

Galvanisedsteel balustradeswith toughenedglass infill panel.

Galvanisedsteel balustradeswith toughenedglass infill panel.

-Non-slip galvanisedperforated steel chequerplate infill to floor. Ongalvanized steelchannels structure toengineer's designad specification

New roof Build up:-Promenade tilesembedded in asphaltlaid to falls with gully.Concrete Slab toEngineers design &specification.

1073

0

Page 5: Ignazio deiana portfolio 2016

Regatta PointCompany: MGL Architets

Details

The building is a modern design con-structed of brick

works with a lightweight roof structure. The proposed additional flat is to be

self-contained and has adequatelight provision, outlook and ventilation

for future occupiers.The proposal does not involve any

change of use to the site; it is focused instead upon the iimprovement of the

existing one.In terms of appearance the proposal

has been designed to blend in with the existing building. The proposed flat

extension is to be treatedin insulated aluminium vertical cladding

panels and glazing tomatch the existing light weight structure

at roof level.The corner element of the building at

the junction of Tobago Street andManilla Street is to be carried out in

brick work to match the existingbuilding.

Software: Autocad,Sketchup

Manilla Street

Toba

go S

treet

Wes

t Fer

ry R

oad

LOUNGE

BEDROOM 1

BEDROOM 2

TERRACE

KITCHEN / DINING

E/SBATH

ENTRANCE

AA

BELOW

TERRACE BELOW

TERRACE BELOW

TERRACE

TERRACE

32 sq.m

8 sq.m

18 sq.m

15.5 sq.m

44.5 sq.m13 sq.m

2B 4P138 sq.m

N

EXISTING FLAT ROOF

EXISTING CURVED ROOF

Page 6: Ignazio deiana portfolio 2016

Audi DealershipCompany: Studing Cinus

Details

We were appointed for a feasibility study to convert a warehouse into an

Audi Dealership.The showroom had to conform to Au-di’s guidelines and the plan regulation

in my homecity Cagliari in Sardinia.

Software: Sketchup - Vray for 3dsmax -

Adobe Photoshop

Page 7: Ignazio deiana portfolio 2016

Ld Market Company: Studing Cinus

Details

Fesability study for a Hypermarket LD Market .It is cheap building where It was important to comply to brand guidlines.

Software: Sketchup - Vray for 3dsmax -

Adobe Photoshop

Page 8: Ignazio deiana portfolio 2016

Villette Decimoputzu

Company:Studing Cinus

Details

10 council estate are built by decimoputzu ‘s municipality.

The terraced houses are on two floors,the ground floor is a living room

with kitchen and front and rear garden,on the first floor we have a

sleeping area with a double bedroom with balcony, two bedroom and bath-

room.

Ground Floor Plan

Front Elevation

Rear Elevation

First Floor Plan

Page 9: Ignazio deiana portfolio 2016

Nottingham Regional Society

Company:GA Architects

Details

New building for six adults with ASD comprising single bedrooms with

en-suitebathrooms, living, dining and kitchen fa-cilities, commercial laundry and sensory

room.

Software: Revit

East Elevation

Floor Plan

North Elevation

South Elevation

West Elevation

Page 10: Ignazio deiana portfolio 2016

Park of musicCompany: Studing Cinus

Details

Large multi-functional public music com-plex in Cagliari Italy

We were apponinted for the latest stage of the building control in Italy .

This building is called the Reduced The-atre because is the second space of the

main theater. It has 319 seats and It is used for small music event , opera and

as a space for testsorchestra, the chorus as well as confer-

ences.

Software: Autocad

Site Plan

Theatre Plan

Theatre Section

Page 11: Ignazio deiana portfolio 2016

Liberate ArchitecturesDetails

Redevelopment area and architecture of hard prison in Cagliari,Italy.

This is a conversion of disused prison in student accomodation, library and

space for office.

Software: Rhinoceros - Vray for 3ds max - Adobe

Photoshop

Page 12: Ignazio deiana portfolio 2016

Thesis Pebbles

Details

Project for a new waterfront in the city of Cagliari. New connections beetween the

harbour and the city,designof the public space, green areas, reor-ganization of the harbour with the new

marina and new structures.

Yacht Club is an iconic-landmark for the new Cagliari Marina for megayacht.

Located on the pier‘Molo Sanità’, has a curvilinear form

ispired by the pebbles shaped by the wash of the weaves over the centuries.

In the first level is situated the hall, a service room, a conference room for

200 people,a spa with swimming pool, a restaurant with cafe and the administration office.

Nautic center The project concerns the restructuring

of the harbour pier in Cagliari.The roof is like a square on the sea,

designed as a park, and allowsvisitors to have different point of view of

the city and the habour.The square with his green hills is

panoramic and provides a good view of Cagliari. Under the square

is located the Nautic center with shops, cafes, restaurant, administrator office

and meeting places.The integral continuity of the design

wants to convey the liveliness of the old city to the waterfront

This project establishes a new city attractor based on the proliferation of

experience.

Software: Rhinoceros-T-Spline- Cinema 4d

Page 13: Ignazio deiana portfolio 2016

Museum

Details

San Domenico Street:This public space is designed with an unvolumetric architecture. The under-

ground museum is projected under the new square, while a Middle age building

beside, restored, will be its entrance.Three points of light in corten steel

provide natural light for the underground museum.

Project for a Modern Art Museum in Cagliari in the middle of the

Villanova district. The Museum con-nects 3 squares: San Giacomo Square

where there is the bookshop and the box office, in San domenico Street we

can find the first part of the museum under the new square (Asia and Afri-ca exposition) and in San Domenico

Square, in front of the church, the last building of the museum, with the Sardin-

ian exposition.

Software: Sketchup - Adobe Photoshop

Page 14: Ignazio deiana portfolio 2016

From Water To Land (Scape)

Details

Our masterplan is primarily based on the theme of water, analysed in its

different forms, sea and river water, for a new landscape design. As far as the coast is concerned, the task is to give breathing space to the coastline

and protect settlements from potential consequences linked to climatic chang-es, as well as improve the quality of life

there. Our idea is to gradually reduce the significant number of buildings on

the sea front, as they create both a physical and visible barrier between the sea and the hinterland, over a period of between fifty and a hundred years. The

same strategy applies to rivers; areas have been identified where, should

flooding occur, houses and people will not be put in danger. Natural areas will

creep into residential areas by way of green corridors, thus exploiting open

spaces between houses. We have created a system of corridors along all

residential areas and along the main roads of communication, which as of

now do not exist. Some of these corri-dors reach the sea and havea precise

task to connect the coast to inland areas. The development of agricultural production is another important theme in our plan. In areas where agriculture

is still strong, fields have been selected in which public places can be created in order to promote agricultural production

and activity.exposition.

Software: Sketchup - Adobe Photoshop

Page 15: Ignazio deiana portfolio 2016

Conceptual Mass Details

Concept roofing with adaptive panels is inspired by Milan trade fair of Fuksas.

Concept facade

Software: Revit Dynamo

.

Software: Revit with Dynamo

DetailsFacade with random panels by using dynamo generative algorithms

Page 16: Ignazio deiana portfolio 2016

THANK YOU

www.behance.net/ignadeuk.linkedin.com/in/ignaziodeiana/

www.flickr.com/photos/ignaziodeiana/