IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures for Equipment Interconnecting Distributed Energy Resources with Electric Power Systems and Associated
Interfaces
Working Group Meeting October 27, 2016; Oak Brook, IL Facilities Sponsored by ComEd
Chair: Sudipta Chakraborty Secretary: Andy Hoke Treasurer: Charlie Vartanian Vice Chairs: Babak Enayati Karl Schoder Tim Zgonena
IEEE SCC21 Liaison: Mike Kipness -------------- ------------------- -----------------------
[email protected] 303 384-7093 [email protected] 303 275-4416
Welcome
Security Procedures and Onsite Contact Manuel Avendano Manager, Smart Grid & Technology
3/20/2017
2
Evacuation Routes and Emergency Numbers
3/20/2017
3
Agenda – P1547.1 Working Group Meeting (Day 1)
4
Thursday 10/27 – Full day
8:15-9:00 AM Welcome and introduction: agenda, IEEE mandatory slides, P1547.1 groups, approval of past minutes, timeline to ballot
9:00-9:30 AM Brief review of 1547 Requirements Verification Matrix Clarification of Matrix details/requirements and implications to P1547.1
9:30-10:30 AM Installation, commissioning and periodic testing subgroup session (ICP)
10:30-10:45 AM Break 10:45-11:45 AM Regulation subgroup session (REG) - focus on frequency
regulation 11:45 AM-12:15 PM Microgrid capabilities subgroup session (MG) 12:15-1:15 PM Lunch 1:15-2:15 PM Abnormal voltage and frequency subgroup session (V&F) 2:15-3:15 PM Power quality subgroup session (PQ) 3:15-3:30 PM Break 3:30-4:30 PM Unintentional islanding subgroup session (UI) 4:30-5:00 PM Path from 1547 publication to 1547.1 publication
Agenda – P1547.1 Working Group Meeting (Day 2)
5
Friday 10/28 – Half day
8:15-9:15 AM Synchronization subgroup session (Sync) 9:15-10:15 AM Interoperability subgroup session (Interop) 10:15-10:30 AM Break 10:30-11:00 AM Modeling and simulation subgroup session (M&S) 11:00-11:30 AM Hardware-in-the-loop subgroup session (HIL) 11:30 AM-12:00 PM Wrap-up, next actions, adjourn
SCC21 P1547.1 Standard Conformance Test Procedures for Equipment Interconnecting Distributed Energy Resources with Electric Power Systems and Associated Interfaces (IEEE SA Standards Board approved PAR Dec 2014)
Scope This standard specifies the type, production, commissioning and periodic tests, and evaluations that shall be performed to confirm that the interconnection and interoperation functions of equipment and systems interconnecting distributed energy resources with the electric power system conform to IEEE Standard 1547.
6
SCC21 P1547.1 Standard Conformance Test Procedures for Equipment Interconnecting Distributed Energy Resources with Electric Power Systems and Associated Interfaces
Purpose Interconnection equipment that connects distributed energy resources (DER) to an electric power system (EPS) shall meet the requirements specified in IEEE Standard 1547. Standardized test and evaluation procedures are necessary to establish and verify compliance with those requirements. These procedures shall provide repeatable results and flexibility to accommodate a variety of DER technologies and functions.
7
8
Participants: IEEE Disclosure of Affiliation Every member and participant in a working group, Sponsor ballot, or other standards development activity shall disclose his or her affiliation(s), which includes employer(s) and any other affiliation(s). An individual is deemed “affiliated” with any individual or entity that has been, or will be, financially or materially supporting that individual’s participation in a particular IEEE standards activity. This includes, but is not limited to, his or her employer(s) and any individual or entity that has or will have, either directly or indirectly, requested, paid for, or otherwise sponsored his or her participation. Failure to disclose every such affiliation(s) may result in complete or partial loss of rights to participate in IEEE-SA activities. An individual is not excused from compliance with this policy by reason of any claim of a conflicting obligation (whether contractual or otherwise) that prohibits disclosure of affiliation(s). A person who believes that a participant’s disclosure is materially incomplete or incorrect should report that fact to the appropriate Sponsor(s).
Disclosure of Affiliation
All participants please announce your name and affiliation
Also please announce your name and affiliation as you make comments or ask questions Officers Introductions
3/20/2017
9
Participants, Patents, and Duty to Inform
All participants in this meeting have certain obligations under the IEEE-SA Patent Policy.
Participants: -- “Shall inform the IEEE (or cause the IEEE to be informed)” of the identity of each
“holder of any potential Essential Patent Claims of which they are personally aware” if the claims are owned or controlled by the participant or the entity the participant is from, employed by, or otherwise represents
- “Personal awareness” means that the participant “is personally aware that the holder may have a potential Essential Patent Claim,” even if the participant is not personally aware of the specific patents or patent claims
-- “Should inform the IEEE (or cause the IEEE to be informed)” of the identity of “any other holders of such potential Essential Patent Claims” (that is, third parties that are not affiliated with the participant, with the participant’s employer, or with anyone else that the participant is from or otherwise represents)
-- The above does not apply if the patent claim is already the subject of an Accepted Letter of Assurance that applies to the proposed standard(s) under consideration by this group
“Quoted text excerpted from IEEE-SA Standards Board Bylaws subclause 6.2” l Early identification of holders of potential Essential Patent Claims is strongly
encouraged l No duty to perform a patent search
10
Patent Related Links
All participants should be familiar with their obligations under the IEEE-SA Policies & Procedures for standards development.
Patent Policy is stated in these sources: IEEE-SA Standards Boards Bylaws http://standards.ieee.org/guides/bylaws/sect6-7.html#6 IEEE-SA Standards Board Operations Manual http://standards.ieee.org/guides/opman/sect6.html#6.3 Material about the patent policy is available at http://standards.ieee.org/board/pat/pat-material.html
11
If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at [email protected] or visit http://standards.ieee.org/board/pat/index.html
This slide set is available at http://standards.ieee.org/board/pat/pat-slideset.ppt
Call for Potentially Essential Patents
If anyone in this meeting is personally aware of the holder of any patent claims that are potentially essential to implementation of the proposed standard(s) under consideration by this group and that are not already the subject of an Accepted Letter of Assurance:
– Either speak up now or – Provide the chair of this group with the identity of the
holder(s) of any and all such claims as soon as possible or
– Cause an LOA to be submitted
12
Other Guidelines for IEEE WG Meetings
13
All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. •Don’t discuss the interpretation, validity, or essentiality of patents/patent claims.
•Don’t discuss specific license rates, terms, or conditions. • Relative costs, including licensing costs of essential patent claims, of different
technical approaches may be discussed in standards development meetings.
• Technical considerations remain primary focus
•Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets.
•Don’t discuss the status or substance of ongoing or threatened litigation.
•Don’t be silent if inappropriate topics are discussed … do formally object. ---------------------------------------------------------------
See IEEE-SA Standards Board Operations Manual, clause 5.3.10 and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more details.
IEEE 1547 Standards Example Use in USA
14
P1547.1 WG Approvals
15
• P1547.1 June WG meeting minutes (June 16, Portland OR) Uploaded to iMeet on July 28, 2016
To be approved on October 27, 2016 – approved at the
meeting with majority
16
P1547.1 Subgroups – October 2016 Chair/Officer:
Sudipta Chakraborty
Overall document
(OD)
General requirements
(GR)
Officer: Tim Zgonena
Abnormal voltage and frequency
tests (V&F)
Voltage and frequency regulation tests (Reg)
Unintentional islanding tests (UI)
Power quality tests
(PQ)
Ramp rate tests (RR)
Synchronization tests (Sync)
Officer: Karl Schoder
Modeling and simulation
(M&S)
Hardware-in-the-loop
tests (HIL)
Interoperability tests
(Interop)
Officer: Babak Enayati
Installation, commissioning, periodic tests (ICP)
DER microgrid
capabilities (MG)
Chair: Tom Basso
Secretary: Andy Hoke
17
P1547.1 Subgroups – October 2016
Subgroup
Gen
eral
requ
irem
ents
Ove
rall
Docu
men
t
Abno
rmal
vol
tage
and
freq
uenc
y co
nditi
ons t
ests
Volta
ge a
nd fr
eque
ncy
regu
latio
n te
sts
Uni
nten
tiona
l isl
andi
ng te
sts
Pow
er q
ualit
y te
sts
Soft
star
t/ra
mp
rate
test
s
Sync
hron
izat
ion
test
s
Mod
elin
g an
d si
mul
atio
n
Hard
war
e-in
-the
-loop
test
s
Inte
rope
rabi
lity
test
s
Inst
alla
tion,
com
mis
sion
ing,
and
pe
riodi
c te
stin
g
DER
mic
rogr
id c
apab
ilitie
s an
d m
icro
grid
inte
rcon
nect
ion
devi
ces
Officer Sudipta Chakraborty
Sudipta Chakraborty
Tim Zgonena
Tim Zgonena
Tim Zgonena
Tim Zgonena
Tim Zgonena
Tim Zgonena Karl Schoder Karl Schoder Karl Schoder Babak
Enayati Babak
Enayati
Subgroup Chair(s)
Sudipta Chakraborty
Sudipta Chakraborty
John Berdner Brian Lydic Sig
Gonzalez Bob White Delayed start
Marcelo Algrain Delayed start Karl Schoder Brian Seal Mark Siira Chris Rowe?
Mark Siira Marcelo Algrain
Jon Ehlmann Greg Kern Soonwook
Hong Bob Fox Wayne Stec
Tom McDermott?
Jens Boemer
Aminul Huque
John Berdner
Note: Listing order of subgroup chairs is arbitrary
18
P1547.1 Subgroup Call Schedule – October 2016 Subgroup Designation MON TUE WED THU FRI
EDT EDT EDT EDT EDT
P1547.1 Officers / subgoup chairs 12-1pm, biweekly
GR - General Reqs OD - Overal Document V&F - Abnormal conditions (V/FRT) tests 12-2pm
REG - Voltage and frequency regulation tests 3-4pm, biweekly
UI - Unintentional islanding tests 1-2pm
PQ - Power quality tests 3-4pm, biweekly
RR - Ramp rate/soft start tests Sync - Synchronization tests M&S - Modeling and simulation tests HIL - Hardware-in-the-loop tests Interop - Interoperability tests 4pm, biweekly ICP - Installation, commissioning, and periodic tests
11am, biweekly
MG - DER microgrid capability and interconnection device tests
11am-12pm (DONE as of Aug 2016)
Production Tests
• Definition: o Production test: A test conducted on every unit of
equipment prior to shipment (IEEE 1547.1-2005) • In IEEE 1547.1-2005, the only production tests are for tripping
and synchronization • For P1547.1 any revised or new production tests are the
responsibility of the subgroups writing the corresponding Type tests
19
Tentative Timeline to Ballot for P1547.1
20
Dates Activities Status June 16, 2016 P1547.1 WG meeting – Draft 1 initiated Done Summer 2016 P1547.1 subgroups work and complete Draft 1 Done September 30, 2016 P1547.1 Draft 1 posted for WG consideration Done October 15, 2016 Comments posted to iMeet Central Done October 27-28, 2016 P1547.1 WG meeting – Draft 1 discussed Ongoing January 31, 2017 P1547.1 Draft 2 posted for WG meeting March 1-2/3 2017 P1547.1 WG meeting – Draft 2 discussed May 2017 P1547.1 Draft 3 posted for WG meeting June 2017 P1547.1 WG meeting – Draft 3 discussed September 2017 P1547.1 Draft 4 posted for WG meeting October 2017 P1547.1 WG meeting – Draft 4 discussed January 2018 P1547.1 Draft 5 posted for WG meeting February 2018 P1547.1 WG meeting – Draft 5 discussed March 15, 2018 P1547.1 Pre-ballot draft sent to WG April 15, 2018 P1547.1 Comment sheet feedback on pre-ballot
draft
April – May 2018 P1547.1 Subgroups work on pre-ballot resolution June 2018 Pre-ballots comments resolution completed July 2018 P1547.1 To IEEE ballot
NERC, Atlanta GA 1.5 or 2 Days?
Will try to make it accelerated
Fostering Technological Innovation and Excellence
For The Benefit Of Humanity
Thank You
21
IEEE SCC21/P1547.1 Draft Standard Conformance Test Procedures for Equipment Interconnecting Distributed Energy Resources with Electric Power Systems and Associated Interfaces
P547.1 Working Group Meeting October 27-28, 2016; Oak Brook, IL
Next Actions
Chair: Sudipta Chakraborty Secretary: Andy Hoke Treasurer: Charlie Vartanian Vice Chairs: Babak Enayati Karl Schoder Tim Zgonena
IEEE SCC21 Liaison: Mike Kipness -------------- ------------------- -----------------------
[email protected] 303 384-7093 [email protected] 303 275-4416
Tentative Timeline to Ballot for P1547.1
23
Dates Activities Status June 16, 2016 P1547.1 WG meeting – Draft 1 initiated Done Summer 2016 P1547.1 subgroups work and complete Draft 1 Done September 30, 2016 P1547.1 Draft 1 posted for WG consideration Done October 15, 2016 Comments posted to iMeet Central Done October 27-28, 2016 P1547.1 WG meeting – Draft 1 discussed Ongoing January 31, 2017 P1547.1 Draft 2 posted for WG meeting March 1-2, 2017 P1547.1 WG meeting – Draft 2 discussed May 2017 P1547.1 Draft 3 posted for WG meeting June 2017 P1547.1 WG meeting – Draft 3 discussed September 2017 P1547.1 Draft 4 posted for WG meeting October 2017 P1547.1 WG meeting – Draft 4 discussed January 2018 P1547.1 Draft 5 posted for WG meeting February 2018 P1547.1 WG meeting – Draft 5 discussed March 15, 2018 P1547.1 Pre-ballot draft sent to WG April 15, 2018 P1547.1 Comment sheet feedback on pre-ballot
draft
April – May 2018 P1547.1 Subgroups work on pre-ballot resolution June 2018 Pre-ballots comments resolution completed July 2018 P1547.1 To IEEE ballot
NERC, Atlanta GA 1.5 days
Next Steps – Till Next P1547.1 WG Meeting
24
Nov. 2016 – Jan. 2017
• P1547.1 subgroups work and complete Draft 2 materials
Jan 23, 2027
• P1547.1 Draft 2 content due to Andy
Jan. 31, 2017
• P1547.1 Draft 2 posted in iMC for WG consideration
Feb. 10, 2017
•Comments due to P1547.1 Secretary
Feb. 15, 2017
•Compiled comments provided to the subgroups
Mar. 1-2, 2017
• P1547.1 WG meeting – Draft 2 discussed • Next meeting at Atlanta, 1.5 days for P1547.1 (following 1.5
days of P1547)
25
P1547.1 Subgroup Call Schedule – October 2016 Subgroup Designation MON TUE WED THU FRI
EDT EDT EDT EDT EDT
P1547.1 Officers / subgoup chairs 12-1pm, biweekly
GR - General Reqs OD - Overal Document V&F - Abnormal conditions (V/FRT) tests 12-2pm
REG - Voltage and frequency regulation tests 3-4pm, biweekly
UI - Unintentional islanding tests 1-2pm
PQ - Power quality tests 3-4pm, biweekly
RR - Ramp rate/soft start tests Sync - Synchronization tests M&S - Modeling and simulation tests HIL - Hardware-in-the-loop tests Interop - Interoperability tests 4pm, biweekly ICP - Installation, commissioning, and periodic tests
11am, biweekly
MG - DER microgrid capability and interconnection device tests
11am-12pm (DONE as of Aug 2016)
Next Steps
26
• Officers: continue monthly call between officers
• Officers and Subgroup Chairs: continue monthly calls between the officers and subgroup chairs
• All subgroups start writing actual test procedures into Draft 2 • Utilize IEEE tools (iMeet Central, listserv etc.)
• Adjourn