Executive Summary This report covers the Standards activity for the six-month period of March to October 1, 2008. The Transformer Committee is responsible for approximately 96 active standards, plus 45 projects for new standards and revisions. In the last six months, two New standards, five Revised standards, and five Reaffirmations were approved by REVCOM. Also, five PARs and two PAR extensions were approved by NESCOM. However, we have seven standards which may expire at the end of this year; and we have three PAR’s which may expire at the end of this year.
In this Report: I. Standards Board Activity (NESCOM & REVCOM)
A. NESCOM recommendations ........................ pg 1 B. REVCOM recommendations........................ pg 2 C. TC Stds on December 2008 Agenda .......... pg 3 D. Standards Bd 2009 Meeting Calendar........ pg 4
II. Transformer Ballot Status............................... pg 5 III. Transformer PAR’s active .............................. pg 6-7 IV. Transformer Stds Status database .................. pg 8- 23 V. Transformer Stds Org Chart ........................... pg 24-25
I. Standards Board Activity
A. NESCOM Recommendations (New Standards Committee) 1, NEW PARs approved PC57.153 Guide for Transformer Paralleling (March)
Approved new PAR until December 2012 2. PARs for the Revisions of Standards PC57.12.23 Standard for Submersible Single-Phase Transformers: 167 kVA and Smaller; High Voltage 25 000 V and Below; Low Voltage 600 V and Below (June) Approved modification of the PAR until December 2009
PC57.12.80 Standard Terminology for Power and Distribution Transformers (June ) Approved PAR for revision until December 2012
PC57.21 Standard Requirements, Terminology, and Test Code for Shunt Reactors Rated Over 500 kVA (March) (This revised standard was also approved in March 2008)
PC57.152 Guide for Diagnostic Field Testing of Fluid Filled Power Transformers, Regulators & Reactors (May) (Early consideration):
Approved PAR for the revision of the old IEEE 62 until December 2012
-
Page 2 of 25
NESCOM Recommendations continued
3. PAR Extension Requests PC57.148 Standard for Control Cabinets for Power Transformers (September ) Approved request for two year extension until December 2010 PC57.149 Guide for the Application and Interpretation of Frequency Response Analysis for Oil Immersed Transformers (September ) Approved request for two year extension until December 2012 4. PARs EXPIRING Dec. 31 - 2008 PC57.12.10 Standard Requirements for Liquid-Immersed Power Transformers
(Std is already withdrawn; PAR expires 12-31-08) [Power Transformer SC]
PC57.100 Standard Test Procedure for Thermal Evaluation of Insulation Systems for Liquid-Immersed Distribution and Power Transformers (Std and PAR expires 12-31-08) [Insulation Life SC]
PC57.150 Guide for the Transportation of Transformers and Reactors Rated 10,000 kVA or larger (new project; PAR expires 12-31-08) [Power Transformer SC]
B. REVCOM Recommendations (Standards Review Committee)
1. NEW Transformer Standards Approved PC57.18.10a Standard Practices and Requirements for Semiconductor Power Rectifier
Transformers - Amendment: Technical and Editorial Corrections (March) PC57.147 Guide for Acceptance & Maintenance of Natural Ester Fluids in Transformers (May) 2. Revisions Approved C57.12.51 Standard for Ventilated Dry-Type Power Transformers, 501 kVA and Larger, Three-
Phase, with High-Voltage 601 to 34500 Volts; Low-Voltage 208Y/120 to 4160 Volts - General Requirements (September)
C57.13 Standard Requirements for Instrument Transformers (March)
C57.21 Standard Requirements, Terminology, and Test Code for Shunt Reactors Rated Over 500 kVA (March)
C57.110 Recommended Practice for Establishing Liquid-Filled and Dry-Type Power and Distribution Transformer Capability When Supplying Nonsinusoidal Load Currents (March)
C57.104 Guide for the Interpretation of Gasses Generated in Oil-Immersed Transformers (September)
3. Reaffirmations Approved C57.12.32 Standard for Submersible Equipment - Enclosure Integrity (March)
C57.12.58 Guide for Conducting a Transient Voltage Analysis of a Dry-Type Transformer Coil (September)
-
Page 3 of 25
REVCOM Recommendations - continued (Reaffirmations) C57.105 Guide for Application of Transformer Connections in Three-Phase Distribution Systems
(March)
C57.109 Guide for Liquid-Immersed Transformer Through-Fault-Current Duration (March)
C57.119 Recommended Practice for Performing Temperature Rise Tests on Oil-Immersed Power Transformers at Loads Beyond Nameplate Ratings (March)
44.. TTrraannssffoorrmmeerr SSttaannddaarrddss tthhaatt aarree EExxppiirriinngg aatt eenndd ooff 22000088
C57.12.56-1986 IEEE Standard Test Procedure for Thermal Evaluation of Insulation Systems for Ventilated Dry-Type Power and Distribution Transformers This standard is being merged with C57.12.60; and 12.56 will be Administratively withdrawn. [Dry]
C57.12.80- Standard Terminology for Power and Distribution Transformers There is an active PAR for the Revision; work is in progress, and a ballot pool formed. [Stds]
PC57.18.10 Standard Practices and Requirements for Semiconductor Power Rectifier Transformers A Reaffirmation Ballot Invitation was opened in September 2008. [PCS]
C57.100 Standard Test Procedure for Thermal Evaluation of Insulation Systems for Liquid-Immersed Distribution and Power Transformers (Std and PAR expires 12-31-08) Needs PAR extension NOW. [Ins Life]
C57.111 Guide for Acceptance of Silicone Insulating Fluid and Its Maintenance in Transformers There is no active PAR for Revision; and evidently no work in progress. [Ins Fluids]
C57.121-1998 IEEE Guide for Acceptance and Maintenance of Less-Flammable Hydrocarbon Fluid in Transformers This standard was balloted (Reaffirmation) in July 2008. It is currently in Comment Resolution stage. [Ins Fluids]
C57.124-1991 (R2002) IEEE Recommended Practice for the Detection of Partial Discharge and the Measurement of Apparent Charge in Dry-Type Transformers A Reaffirmation Ballot Invitation was opened in September 2008. [Dry]
C. December 2008 Agenda for REVCOM and NESCOM
As of Oct 1, the Agenda for December ’08 meeting of RevCom and NesCom has not been published. (An agenda has been released for a Standards Board Early Consideration teleconference, on 27 October 2008. But, there are no Transformer Committee standards on the Agenda.)
D. 2009 Standards Board Meeting Schedule
Standards Bd Meeting Deadline for Submissions
March 17-19 6 February 2009
June 15-17 7 May 2009
September 9-11 31 July 2009
December 7-9 19 October 2009
-
Page 4 of 25
2009 Standards Board Calendar
-
Page 5 of 25
II. Transformer Ballot Status as of October 1, 2008 (from myBallot™) Sub
committee PAR or
Standard # Title Ballot Status Notes
PreBallot Standards- C57.12.00 Cont. Rev of Std General
Requirements PreBallot Ballot opened Sept 30 ‘08
closes Oct 30 ‘08 UTNP C57.12.24 Standard for Submersible, 3-Phase
Transformers, < 3750 kVA PreBallot Ballot opened Sept 9 -
Closes Oct 9’ 08 Standards- C57.12.80 Standard Terminology for Power and
Distribution Transformers PreBallot Ballot Pool Invitation Issued
Standards- C57.12.90 Cont. Rev of Std Test Code PreBallot Ballot opened Sept 30 ‘08 closes Oct 30 ‘08
PCS- C57.18.10 (Reaff) Requirements for Semiconductor Power Rectifier Transformers
PreBallot Reaff Ballot Pool Invitation opened Sept 12 ‘08
Di Tests C57.113 Rec Practice for PD Measurement in Liquid-Filled Pwr Trfmers & Shunt Rx
PreBallot Copyright issues
PCS- PC57.142 Describe the Occurrence And Mitigation Of Switching Transients
PreBallot
Dry C57.124 Rec Prac for Detection of PD in Dry Tx PreBallot Reaff Ballot Pool Invitation opened Sept 19 ‘08
Comment Resolution InsFluid- C57.121 Guide for Acceptance and
Maintenance of Less-Flammable Hydrocarbon Fluid in Transformers
Comment Resolution
Reaff Ballot closed July 2 08
PCS PC57.123 Guide for Transformer Loss Measurement
Comment Resolution
Hold up due to dual Logo process
UTNP C57.12.23 Standard for Submersible Single-Phase Transformers
-
Page 6 of 25
III.. Transformer Committee - Active PARs as of October 1, 2008
P 638 Standard for Qualification of Class 1E Transformers for Nuclear Power Generating
Stations Dec 2011
P1277 Standard General Requirements and Test Code for Dry-Type and Oil-Immersed Smoothing Reactors for DC Power Transmission
Dec 2009
PC57.12.00 Standard General Requirements for Liquid-Immersed Distribution, Power, and Regulating Transformers
Dec 2011 Ballot opened Sept 30 ‘08
PC57.12.10 Standard Requirements for Liquid-Immersed Power Transformers Dec 2008
PC57.12.20 Standard for Overhead Type Distribution Transformers, 500 kVA and Smaller Dec 2010
PC57.12.23 Standard for Submersible Single-Phase Transformers Dec 2009 Ballot closed June 6’ 08 PC57.12.24 Standard for Submersible, Three-Phase Transformers, 3750 kVA and Smaller Dec 2011 Ballot opened Sept 08 PC57.12.30 Standard for Pole-Mounted Equipment - Enclosure Integrity for Coastal
Environments Dec 2011
PC57.12.31 Standard for Pole Mounted Equipment - Enclosure Integrity Dec 2011 PC57.12.34 Standard for Requirements for Pad-Mounted, Compartmental Type, Self Cooled,
Three Phase Distribution Transformers, 5 MVA and Smaller; High Voltage, 34.5kV Nominal System Voltage and Below; Low Voltage, 15kv Nominal System Voltage and Below
Dec 2009
PC57.12.38 Standard for Padmounted Type, Self-Cooled, Single Phase Distribution Transformers; High Voltage, 34500 GrdY/19920 Volts and below, Low voltage, 240/120 Volts; 167 kVA and smaller
Dec 2009
PC57.12.40 Standard for Network, Three-Phase Transformers, 2500 kVA and Smaller; High Voltage, 34 500 GrdY/19 920 and Below; Low Voltage, 600 Volts and and Below; Subway and Vault Types (Liquid Immersed)
Dec 2011
PC57.12.51 Standard for Ventilated Dry-type Power Transformers, 501 kVA and Larger, Three-Phase, with High-Voltage 601 to 34500 Volts; Low-Voltage 208Y/120 to 4160 Volts - General Requirements
Balloted and approved 9/08
PC57.12.52 Standard for Sealed Dry-Type Power Transformers, 501 kVA and Larger, Three-Phase, with High-Voltage 601 to 34500 Volts, Low-Voltage 208Y/120 to 4160 Volts- General Requirements
Dec 2011
PC57.12.60 Standard Test Procedure for Thermal Evaluation of Insulation Systems for Dry Type Power and Distribution Transformers, Including Open-Wound, Solid-Cast and Resin Encapsulated Transformers
Dec 2009
PC57.12.70 Standard Terminal Markings and Connections for Distribution and Power Transformers Dec 2011
PC57.12.80 Standard Terminology for Power and Distribution Transformers Dec 2012 Ballot pool formede PC57.12.90 Standard Test Code for Liquid-Immersed Distribution, Power, and Regulating
Transformers Dec 2011 Ballot opened
Sept 30 ‘08 PC57.12.91 Standard Test Code for Dry-Type Distribution and Power Transformers Dec 2010 PC57.13.5 Standard of Performance and Test Requirements for Instrument Transformers of a
Nominal System Voltage of 115 kV and Above Dec 2009
PC57.15 Standard Requirements, Terminology, and Test Code for Step-Voltage Regulators Dec 2009 PC57.16 Standard Requirements, Terminology, and Test Code for Dry-Type Air-Core
Series-Connected Reactors Dec 2010
PC57.17 Standard Requirements for Arc Furnace Transformers Dec 2011 PC57.19.03 Standard Requirements, Terminology, and Test Code for Bushings for DC
Applications Rated 110 kV BIL and Above Dec 2011
PC57.19.100 Guide for Application of Power Apparatus Bushings Dec 2010 PC57.32 Std Requirements, Terminology & Test Procedures for Neutral Grounding Devices Dec 2009
-
Page 7 of 25
Active PARs - continued PC57.91 Guide for Loading Liquid Immersed Transformers and Voltage Regulators Dec 2009 PC57.98 Guide for Transformer Impulse Tests Dec 2009 PC57.100 Standard Test Procedure for Thermal Evaluation of Insulation Systems for Liquid-
Immersed Distribution and Power Transformers Dec 2008 PC57.104 Guide for the Interpretation of Gases Generated in Oil-Immersed Transformers
Balloted and approved 9/08
PC57.113 Recommended Practice for Partial Discharge Measurement in Liquid-Filled Power Transformers and Shunt Reactors Dec 2011
PC57.123 Guide for Transformer Loss Measurement Dec 2011
Hold up due to Dual Logo
PC57.130 Trial-Use Guide for the Use of Dissolved Gas Analysis During Factory Temperature Rise Tests for the Evaluation of Oil-Immersed Transformers and Reactors Dec 2009
PC57.131 Standard Requirements for Tap Changers Dec 2009 PC57.133 Guide for Short-Circuit Testing of Distribution and Power Transformers Dec 2009 PC57.135 Guide for the Application, Specification and Testing of Phase Shifting
Transformers Dec 2011 PC57.139 Guide for Dissolved Gas Analysis in Transformer Load Tap Changers Dec 2009 PC57.142 Guide to Describe the Occurrence and Mitigation of Switching Transients Induced
by Transformer, Switching Device, and System Interaction Dec 2011 PC57.143 Guide for Application for Monitoring Equipment to Liquid-Immersed Transformers
and Components Dec 2010 PC57.148 Standard for Control Cabinets for Power Transformers
Dec 2010 Extension Granted 9/08
PC57.149 Guide for the Application and Interpretation of Frequency Response Analysis for Oil Immersed Transformers Dec 2010
Extension Granted 9/08
PC57.150 Guide for Transportation of Transformers and Reactors Rated > 10,000 kVA Dec 2008 PC57.151 Guide for Sound Level Measurement Guide for Liquid Filled and Dry Type
Transformers and Reactors Dec 2009 PC57.152 Guide for Diagnostic Field Testing of Fluid Filled Power Transformers, Regulators,
and Reactors Dec 2012 PC57.153 Guide for Paralleling Power Transformers Dec 2012
[end]
-
IEEE/PES TRANSFORMERS COMMITTEEStatus Report of PE/TR Standards
October, 2008Porto, Portugal
STANDARD
PROJECTTITLE
Pub YearRev Due Date
PAR Issue Date
PAR Expiration
Standard StatusRemark
10/01/2008Working Group Chair
EmailPhone
SubCommittee AUDIBLE SOUND & VIBRATIONJ.
(704) 821-6638
[email protected] Puri
P57.151
IEEE Guide for Sound Level Measurement for Liquid Immersed Transformers and Reactors
12/07/200512/31/2010
New Project - Active PAR Std under development
IEC granted permission for use of IEC documents
Puri(704) [email protected]
J.
C57.136 IEEE Guide for Sound Level Abatement and Determination for Liquid- Immersed Power Transformers and Shunt Reactors Rated Over 500 kVA
200012/31/2010
Approved - Reaffirmed September '05
Reaffirmation approved by RevCom on 9/21/2005
Darwin44 1785 [email protected]
A.W.
SubCommittee BUSHINGF. E.
(360) 418-2269
[email protected] ElliottC57.19.00 Standard General Requirements and Test Procedure for
Power Apparatus Bushings200412/31/2009
Approved
Formally Std. IEEE 21Previous revision 1991. D6.1 approved by RevCom in Dec., 2004
Ellis(615) [email protected]
K. P.
C57.19.01 IEEE Standard Performance Characteristics and Dimensions for Outdoor Apparatus Bushings
200012/31/2010
Approved
Formally Std. IEEE 24Reaffirmed in 2005.
Singh(731) [email protected]
P.
C57.19.03
PC57.19.03
IEEE Standard Requirements, Terminology, and Test Code for Bushings for DC Applications
199612/31/2007
12/05/200712/31/2011
Approved with Corrigenda
See Corrigenda -1, Published in 2006New PAR for revision submitted 10/2007PAR approved by Nescom Dec07
Elliott(360) [email protected]
F. E.
C57.19.03-1996/ Standard Requirements, Terminology, and Test Code for Bushing for DC Applications - Corrigendum 1 12/31/2007
Approved
Published 6/6/2006
Elliott(360) [email protected]
F. E.
C57.19.100
PC57.19.100
IEEE Guide for Application of Power Apparatus Bushings
199512/31/2010
03/30/200612/31/2010
Approved - Active PAR for Revision
Revision for C57.19.101-1992New PAR requested and approved to 12/31/2010.
Spitzer(817) [email protected]
T.
Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 8 of 25
-
STANDARD
PROJECTTITLE
Pub YearRev Due Date
PAR Issue Date
PAR Expiration
Standard StatusRemark
10/01/2008Working Group Chair
EmailPhone
SubCommittee DIELECTRIC TESTSL. B.
(614) 552-1759
[email protected] WagenaarC57.113
PC57.113
IEEE Guide for Partial Discharge Measurement in Liquid-Filled Power Transformers and Shunt Reactors
199112/31/2007
05/07/200712/31/2011
Active PAR for revision
New PAR approved on 5/7/2007.Ballot Pool Invitation opened Mar 7-08; closed Apr 6-08
Poulin(450) [email protected]
B.
C57.127 IEEE Guide for the Detection of Acoustic Emissions from Partial Discharges in Oil-Immersed Power Transformers
200712/31/2012
Approved - D10.0 approved - in final edit
PAR to Revise IEEE Std C57.127-2000D10.0 approved by SA Board 3/22/2007
Harley(330) [email protected]
J. W.
C57.138 IEEE Recommended Practice for Routine Impulse Test for Distribution Transformers
199812/31/2010
Approved - Reaffirmed in June '05
Reaffirmation approved by RevCom on 6/8/05.
Molden(845) [email protected]
A.
C57.98
PC57.98
IEEE Guide for Transformer Impulse Tests 199412/31/2009
09/12/200212/31/2009
Approved - Active PAR for Revision
PAR to Revise IEEE Std C57.98-1994PAR extension requested and approved to 12/31/2009.
Molden(845) [email protected]
A.
Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 9 of 25
-
STANDARD
PROJECTTITLE
Pub YearRev Due Date
PAR Issue Date
PAR Expiration
Standard StatusRemark
10/01/2008Working Group Chair
EmailPhone
SubCommittee DISTRIBUTION TRANSFORMERSK. S.
(817) 215-4444
[email protected] Hanus
PC57.12.30
Standard for Pole-Mounted Equipment - Enclosure Integrity for Coastal Environments
03/22/200712/31/2011
New Project
New project: covers conformance tests and requirements for the enclosure integrity of pole-mounted equipment in coastal locations
Olen(262) [email protected]
O.
PC57.12.33
Guide for Distribution Transformer Loss Evaluation 06/25/199812/31/2004
PAR Withdrawn - Inactive WG
Decision made at Las Vegas Meeting to discontinue project. PAR administratively withdrawn by Nescom Dec '04
Pekarek(330) [email protected]
T. J.
C57.12.20
PC57.12.20
Standard for Overhead Type Distribution Transformers, 500 kVA and Smaller, High-Voltage 34 500 Volts and Below; Low-Voltage, 7970/13 800 Y Volts and Below
200512/31/2010
09/15/200612/31/2010
Approved - Active PAR for Revision
New PAR requested and approved to 12/31/2010.
Wilks(731) [email protected]
A. L.
C57.12.25
PC57.12.38
Standard for Pad-Mounted, Compartmental-Type, Self-Cooled, Single-Phase Distribution Transformers with Separable Insulated High-Voltage Connectors; High Voltage, 34500 GrdY/19920 Volts and Below, Low Voltage, 240/120 Volts; 167 kVA and SmallerRequirements
12/31/200908/11/200512/31/2009
Approved - Active PAR for revision
Original PAR PC57.12.25 administratively withdrawn on 12/7/04 NesCom Meeting.New PAR PC57.12.38 approved 8/11/05.PAR modified in 2006, approved to 12/31/2009.1st ballot completed 9/28/2007
Ghafourian(731) [email protected]
A. A.
C57.12.28
PC57.12.28
Standard for Pad Mounted Equipment - Enclosure Integrity
200512/31/2010
Approved
Previously NEMA/ANSI C57.12.28-1999Published 9/30/2005
Olen(262) [email protected]
O.
C57.12.29
PC57.12.29
Standard for Pad Mounted Equipment - Enclosure Integrity for Coastal Environments
200512/31/2010
Approved
Previously NEMA/ANSI C57.12.29-1991Current standards Published 10/10/2005.
Olen(262) [email protected]
O.
C57.12.31
PC57.12.31
IEEE Standard for Pole Mounted Equipment - Enclosure Integrity
200212/31/2011
03/22/200712/31/2011
Approved - Active PAR for Revision
Published 3/6/2003.New PAR approved 3/22/2007
Olen(262) [email protected]
O.
C57.12.32 Standard for Submersible Equipment - Enclosure Integrity
200212/31/2013
Approved
Published 3/7/2003.Reaffirmation approved 03/28/08
Olen(262) [email protected]
O.
Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 10 of 25
-
STANDARD
PROJECTTITLE
Pub YearRev Due Date
PAR Issue Date
PAR Expiration
Standard StatusRemark
10/01/2008Working Group Chair
EmailPhone
SubCommittee DISTRIBUTION TRANSFORMERSK. S.
(817) 215-4444
[email protected] HanusC57.12.34
PC57.12.34
Requirements for Pad-Mounted, Compartmental-Type, Self-Cooled, Three-Phase DistributionTransformers, 2500 kVA and Smaller: High-Voltage, 34 500GrdY/19 920 Volts and Below; Low Voltage, 480 Volts and Below
12/31/200903/20/200512/31/2009
Approved - Active PAR for revision
Originally Std. 1447, Combined C57.22-1980 & C57.12.26-1992Approved by RevCom 9/22/2004; published 3/8/05New PAR for revision approved 3/19/2005.
Shull(417) [email protected]
S.
C57.12.35 IEEE Standard for Bar Coding for Distribution Transformers
200712/31/2012
Approved
Formerly P1265.C57.12.35-1996 reaffirmation 6/23/2004.Approved by SA Board 9/27/2007
Matthews(601) [email protected]
P
C57.12.36
PC57.12.36
Standard Requirements for Liquid-Immersed Distribution Substation Transformers
200712/31/2012
Approved
PAR extended to 12/31/2008.Approved by SA Board on 9/27/2007
Rossetti(901) [email protected]
J. R.
C57.12.37 IEEE Standard for the Electronic Reporting of Transformer Test Data
200612/31/2011
Approved
Formerly C57.132, IEEE Std 1388-2000Approved on 3/30/2006. Published 7/21/2006
Hollingsworth(601) [email protected]
R.
C57.15
PC57.15
IEEE Standard Requirements, Terminology, and Test Code for Step-Voltage Regulators
199912/31/2009
06/09/200512/31/2009
Approved - Active PAR for Revision
A new PAR was approved 6/9/05 due to scope changes. Original PAR withdrawn.
Colopy(262) [email protected]
C. A.
Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 11 of 25
-
STANDARD
PROJECTTITLE
Pub YearRev Due Date
PAR Issue Date
PAR Expiration
Standard StatusRemark
10/01/2008Working Group Chair
EmailPhone
SubCommittee DRY TYPE TRANSFORMERSC. W.
(276) 688-1512
[email protected] Johnson, Jr.C57.12.01 IEEE Standard General Requirements for Dry-Type
Distribution and Power Transformers Including Those with Solid Cast and/or Resin Encapsulated Windings
200512/31/2010
Approved
Previous 1998 version was successfully revised and approved in 2005.Published 5/19/2006
Sullivan(813) [email protected]
J. C.
C57.12.51
PC57.12.51
Ventilated Dry-Type Power Transformers, 501 kVA and Large, Three-Phase, with High-Voltage 601 to 34500 Volts; Low-Voltage 208Y/120 to 4160 Volts - General Requirements
200812/31/2013
09/15/200612/31/2010
Approved
Previously NEMA document C57.12.51, original publication by NEMA in 1981, Reaffirmed in 1998. document transferred to IEEE in Dec 2002.New PAR approved in 20060. PAR modification approved 12-05-07. Revised Standard approved 9/27/08
Powell(202) [email protected]
P. A.
C57.12.52
PC57.12.52
Standard Requirements for Sealed Dry-Type Power Transformers, 501 kVA and Larger, Three-Phase, with High-Voltage 601 to 34 500 Volts, Low-Voltage 208Y/120 to 4160 Volts
1981 05/07/200712/31/2011
Active PAR for revision
Previously ANSI C57.12.52-1981NEW PAR approved for revision to Dec 2011
Kennedy(716) [email protected]
S. P.
C57.12.56
PC57.12.60
IEEE Standard Test Procedure for Thermal Evaluation of Insulation Systems for Ventilated Dry-Type Power and Distribution Transformers
198112/31/2007
12/10/200312/31/2009
Extended to Dec 2008
Revcom recommended ADMINISTRATIVE WITHDRAWAL12.56 AND 12.60 are being MERGED
Wicks(804) [email protected]
R. C.
C57.12.58 IEEE Guide for Conducting a Transient Voltage Analysis of a Dry-Type Transformer Coil
199112/31/2013
Approved - Active
Reaffirmation approved 9/27/2008
Kline(843) [email protected]
A. D.
C57.12.59 IEEE Guide for Dry-Type Transformer Through-Fault Current Duration
200112/31/2011
Approved
Reaffirmation approved in 12/5/2006.
Powell(202) [email protected]
P. A.
C57.12.60
PC57.12.60
IEEE Guide for Test Procedures for Thermal Evaluation of Insulation Systems for Solid Cast and Resin-Encapsulated Power and Distribution Transformers
199812/31/2007
12/10/200312/31/2008
Approved - Active PAR for Revision
PAR to Revise IEEE Std C57.12.56-1986 and IEEE Std C57.12.60-1998PAR extended to 12-31-09
Wicks(804) [email protected]
R. C.
C57.12.91
PC57.12.91
IEEE Standard Test Code for Dry-Type Distribution and Power Transformers
200112/31/2010
12/05/200612/31/2010
Approved - Active PAR for Revision
New PAR for Revision approved 12/5/2006PAR for Amendment withdrawn
Foster(815) [email protected]
D. R.
Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 12 of 25
-
STANDARD
PROJECTTITLE
Pub YearRev Due Date
PAR Issue Date
PAR Expiration
Standard StatusRemark
10/01/2008Working Group Chair
EmailPhone
SubCommittee DRY TYPE TRANSFORMERSC. W.
(276) 688-1512
[email protected] Johnson, Jr.C57.124 IEEE Recommended Practice for the Detection of
Partial Discharge and the Measurement of Apparent Charge in Dry-Type Transformers
199112/31/2007
Approved
Need to initiate reaffirmation and request extension.Expiration extended by Revcom to 12-31-08Reaff Ballot Invitation opened 9/19/08
Johnson, Jr.(276) [email protected]
C. W.
C57.134 IEEE Guide for Determination of Hottest Spot Temperature in Dry Type Transformers
200012/31/2011
Approved
Reaffirmation approved 3/30/2006
Powell(202) [email protected]
P. A.
C57.16
PC57.16
IEEE Standard Requirements, Terminology, and Test Code for Dry-Type Air- Core Series-Connected Reactors
199612/31/2010
11/02/200612/31/2010
Approved
PAR for revision approved 11/2/2006.
Dudley(416) [email protected]
R. F.
C57.94 IEEE Recommended Practice for Installation, Application, Operation, and Maintenance of Dry-Type General Purpose Distribution and Power Transformers
198212/31/2010
Approved
Reaffirmation approved 12/6/2006
Lewis(910) [email protected]
T. D.
C57.96 IEEE Guide for Loading Dry Type Distribution and Power Transformers
199912/31/2009
Approved - Active
Reaffirmation approved 9/22/2004Previous revision in 1994.
Prevost(802) [email protected]
T. A.
IEEE 259 IEEE Standard Test Procedure for Evaluation of Systems of Insulation for Dry-Type Specialty and General-Purpose Transformers
199912/31/2009
Approved
Reaffirmation approved 9/22/04
Simpson, Jr.(603) [email protected]
R. W.
SubCommittee HV CONVERTER TR & REACTORSR. F.
(416) 298-8108
[email protected] DudleyC57.129
PC57.129
IEEE General Requirements and Test Code for Oil Immersed HVDC Converter Transformers
200712/31/2012
Approved
Trial use std published 6/6/2000; upgraded to full use 3/2002PAR for revision approved on 6/24/2004Approved 9/27/2007
Dudley(416) [email protected]
R. F.
IEEE 1277
P1277
IEEE General Requirements and Test Code for Dry-Type and Oil-Immersed Smoothing Reactors for DC Power Transmission
200012/31/2005
11/10/200512/31/2009
Approved. Active PAR for revision
Active PAR for revision.
Dudley(416) [email protected]
R. F.
Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 13 of 25
-
STANDARD
PROJECTTITLE
Pub YearRev Due Date
PAR Issue Date
PAR Expiration
Standard StatusRemark
10/01/2008Working Group Chair
EmailPhone
SubCommittee INSTRUMENT TRANSFORMERSJ. E.
(601) 346-9104
[email protected] SmithC57.13
PC57.13
IEEE Standard Requirements for Instrument Transformers
199312/31/2013
12/10/200312/31/2007
Approved
PAR to Revise IEEE Std C57.13-1993PAR extended to 12-31-08 Revision Ballot closed 10-23-07Revision Approved 3/28/08
Nelson(301) [email protected]
T. N
C57.13.2 Conformance Test Procedure for Instrument Transformers
200512/31/2010
Approved
C57.13.2-1991 revised to harmonize with C57.13-1993Approved by RevCom on 6/8/2005Published 9/29/2005.
Khalin(859) [email protected]
V. M.
C57.13.5
PC57.13.5
Standard of Performance and Test Requirements for Instrument Transformers of a Nominal System Voltage of 115 kV and Above
200612/31/2009
12/07/200512/31/2009
Approved - Active PAR for Revision
Reference Std. 1400Previously C57.13.5 was a trial useUpgraded to Full Use 3/30/2006
Riffon(514) 840-3000 [email protected]
P.
C57.13.6 Standard for High Accuracy Instrument Transformers12/31/2010
Approved
Document published in 12/9/2005
Ten Haagen(603) [email protected]
C. W.
Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 14 of 25
-
STANDARD
PROJECTTITLE
Pub YearRev Due Date
PAR Issue Date
PAR Expiration
Standard StatusRemark
10/01/2008Working Group Chair
EmailPhone
SubCommittee INSULATING FLUIDSR. K.
(617) 393-3133
[email protected] Ladroga
PC57.130
IEEE Trial-Use Guide for the Use of Dissolved Gas Analysis During Factory Temeprature Rise Tests for the Evaluation of Oil-Immersed Transformers and Reactors
01/30/200012/31/2009
New Project - under development
currently under ballot resolution.PAR extension requested and approved to 12/31/2007.PAR extension requested and approved to 12/31/2009.
Ladroga(617) [email protected]
R. K.
PC57.139
Guide for Dissolved Gas Analysis in Transformer Load Tap Changers
12/11/200212/31/2009
New Project - under development
Orig PAR to expire 12/31/2006. Deferred PAR withdrawal to 3/2007.PAR extended to 2009
Jakob(916) [email protected]
F.
C57.104
PC57.104
IEEE Guide for the Interpretation of Gases Generated in Oil-Immersed Transformers
199112/31/2013
06/30/200612/31/2010
Approved
Original PAR and document withdrawn in Dec. 2005. New PAR approved in June 06. Ballot closed 10/10/07 Revision approved 09/27/08
Ladroga(617) [email protected]
R. K.
C57.106 IEEE Guide for Acceptance and Maintenance of Insulating Oil in Equipment
200612/31/2011
Approved
D6 pproved 12/6/2006Previously version in 2002, 1991 (R1998), 1977
Thompson(605) [email protected]
J. A.
C57.111 IEEE Guide for Acceptance of Silicone Insulating Fluid and Its Maintenance in Transformers
198312/31/2008
Approved
Standard EXPIRES Dec 31 2008
Ladroga(617) [email protected]
R. K.
C57.121 IEEE Guide for Acceptance and Maintenance of Less-Flammable Hydrocarbon Fluid in Transformers
199812/31/2007
Approved
Was to be administratively withdrawn in Dec., 2004Reaffirmation ballot pool invitation initiated in October, 2005.Exp. Date extended to 12/31/2007 Insulating Fluids Subcommittee decided on 10/17/2007 to withdraw this standard.However in 2008 Reaffirmation ballot in July; currently in Resolution
McShane(262) [email protected]
C. P.
C57.146 Guide for Interpretation of Gasses Generated in Silicone-Immersed Transformers
200512/31/2010
Approved
D3a - approved by RevCom on 9/21/05.Published 3/10/2006
Bartley(860) [email protected]
W. H.
Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 15 of 25
-
STANDARD
PROJECTTITLE
Pub YearRev Due Date
PAR Issue Date
PAR Expiration
Standard StatusRemark
10/01/2008Working Group Chair
EmailPhone
SubCommittee INSULATING FLUIDSR. K.
(617) 393-3133
[email protected] LadrogaC57.147
PC57.147
Guide for Acceptance and Maintenance of Natural Ester Fluids in Transformers 12/31/2013
12/10/200312/31/2007
Approved
1st Ballot closed - 98% approval rating.Approved by Early Consideration May 14, 2008
McShane(262) [email protected]
C. P.
IEEE 637 IEEE Guide for the Reclamation of Insulating Oil and Criteria for Its Use
198512/31/2012
Approved - Reaffirmed
Reaffirmation approved by SA Board 9/27/2007
Verner202 [email protected]
J. A.
Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 16 of 25
-
STANDARD
PROJECTTITLE
Pub YearRev Due Date
PAR Issue Date
PAR Expiration
Standard StatusRemark
10/01/2008Working Group Chair
EmailPhone
SubCommittee INSULATION LIFED. W.
(610) 774-4686
[email protected] Platts
PC57.145
Guide for the Definition of Thermal Duplicate Liquid-Immersed Distribution, Power, and Regulating Transformers
0 06/25/199812/31/2004
PAR Withdrawn
Previously P1524 Modified PAR to expire in 2004PAR administratively withdrawn in December, 2004
Beaster(601) [email protected]
B. L.
C57.100
PC57.100
IEEE Standard Test Procedure for Thermal Evaluation of Liquid-Immersed Distribution and Power Transformers
199912/31/2008
12/08/200412/31/2008
Approved - Active PAR for Revision
Requested PAR for revision on 10/18/2004. PAR approved 12/8/2004
Wicks(804) [email protected]
R. C.
C57.119 IEEE Recommended Practice for Performing Temperature Rise Tests on Oil Immersed Power Transformers at Loads Beyond Nameplate Ratings
200112/31/2013
Approved
Previously IEEE 838. Published 3/12/2002.Reaff approved 03/28/08
Tuli(262) 547-0123 [email protected]
S. C.
C57.91
PC57.91
IEEE Guide for Loading Mineral-Oil-Immersed Transformers
199512/31/2009
05/02/200512/31/2009
Approved - Active PAR for revision
Combined C57.91-1981, C57.92-1981 & C57.115-1991Reaffirmation approved 6/23/2004New PAR for revision approved 5/2/2005.Revision to include Corr. 1
Raymond(518) [email protected]
T.
C57.91-1995/Cor IEEE Guide for Loading Mineral-Oil-Immersed Transformers--Corrigendum 1
200212/31/2007
Approved - Active PAR for Revision
In conjunction with C57.91 - reaffirmed in 6/2004. Currently under revision
Pierce(706) [email protected]
L. W.
IEEE 1276 IEEE Guide for the Application of High-Temperature Insulation Materials in Liquid-Immersed Power Transformers
199712/31/2011
Approved
Upgrade from trial use to full use on 3/30/2000Reaffirmation approved by SA Board in 3/30/2006
Franchek(802) [email protected]
M. A.
IEEE 1538 IEEE Guide for Determination of Maximum Winding Temperature Rise in Liquid Filled Transformer
200012/31/2010
Approved
Original approval in 2000. Reaffirmed in 2005.
Platts(610) [email protected]
D. W.
Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 17 of 25
-
STANDARD
PROJECTTITLE
Pub YearRev Due Date
PAR Issue Date
PAR Expiration
Standard StatusRemark
10/01/2008Working Group Chair
EmailPhone
SubCommittee PERFORMANCE CHARACTERISTICSR. S.
(314) 679-4803
[email protected] Girgis
PC57.133
Guide for Short-Circuit Testing of Distribution and Power Transformers
03/04/200512/31/2009
Active PAR for revision of SC Test Guide
New PAR for revision approved on 2/22/05.
M.
PC57.142
A Guide To Describe The Occurrence And Mitigation Of Switching Transients Induced By Transformer-Breaker Interaction
05/07/200712/31/2011
New Project - Active PAR Std under development
PAR extension granted 9/23/2004 - new expiration @2006Balloted in 2005 -many negativesNew PAR approved 2007- for join sponsorship between Transformers Committee and Switchgear Committee.
Degeneff(518) [email protected]
R. C.
PC57.149
Guide for the Application and Interpretation of Frequency Response Analysis for Oil Immersed Transformers
06/24/200412/31/2010
New Project - Active PAR
PAR approved by NesCom 6/23/2004PAR Extension Request Approved Sept 08 to 12/31/2010
Sweetser(617) [email protected]
C.L.
PC57.153
Transformer Paralleling Guide 03/27/200812/31/2012
New Project - Active PAR
PAR approved 3/27/08
Jauch(727) [email protected]
E.T.
C57.105 IEEE Guide for Application of Transformer Connections in Three-Phase Distribution Systems
197812/31/2013
Approved
Was to be administratively withdrawn in Dec., 2004. Reaffirmation ballot in Februay 2008.Reaffirmation approved 03/28/08
Reitter(650) [email protected]
G. J.
C57.109 IEEE Guide for Liquid-Immersed Transformers Through-Fault-Current Duration
199312/31/2013
Approved
Reaffirmation ballot invitation opened Oct 2005.Extension approved to 12/31/2007Reaff Recirc ballot closed 2/23/08. Reaff approved 03/28/08
Patel(205) [email protected]
B. K.
C57.110
PC57.110
IEEE Recommended Practice for Establishing Transformer Capability When Supplying Nonsinusoidal Load Currents
199812/31/2013
11/18/200412/31/2008
Approved
PAR approved 11/18/2004. Balloted Sept 2007Recirc ballot closed 11-15-07 Revision approved 03/28/08 Revision published 8/15/08
Marek(804) [email protected]
R. P.
Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 18 of 25
-
STANDARD
PROJECTTITLE
Pub YearRev Due Date
PAR Issue Date
PAR Expiration
Standard StatusRemark
10/01/2008Working Group Chair
EmailPhone
SubCommittee PERFORMANCE CHARACTERISTICSR. S.
(314) 679-4803
[email protected] GirgisC57.123
PC57.123
IEEE Guide for Transformer Loss Measurement 200212/31/2011
02/20/200712/31/2011
Approved - Active New PAR for revision
Ref Std. IEEE 1098WG Chair record from IEEE shows R. GirgisRevision ballot pool formed. New Draft4 in ballot.Hold up due to Dual Logo process
TeNyenhuis(519) [email protected]
E.G.
C57.18.10
C57.18.10a
IEEE Standard Practices and Requirements for Semiconductor Power Rectifier Transformers
199812/31/2008
03/04/200512/31/2009
Approved
Replaced C57.18-1964 pool cathode mercury-arc rectifiers.New PAR for Amendment approved 2/22/05Amendment approved March 28/08Reaffirmation Ballot Invitation opened 09/12/08
Kennedy(716) [email protected]
S. P.
C57.21
PC57.21
IEEE Standard Requirements, Terminology, and Test Code for Shunt Reactors Rated Over 500 kVA
199012/31/2013
09/11/200312/31/2007
Approved
Reaffirmation approved on 6/23/2004.Balloted in 2007Recirc ballot closed 1/6/2008 Approved 03/21/08
Dudley(416) [email protected]
R. F.
IEEE 32
PC57.32
IEEE Standard Requirements, Terminology, and Testing Procedures for Neutral Grounding Devices
197212/31/2009
12/11/200212/31/2009
Approved - Active PAR for revision
Dec. 2002 - Sponsor changed from PES/SPD to PES/TRPAR to revise PC57.32 approved 2002 to expire on 12/31/2006.PAR - expiration date extended to 12/31/2009
Schappell(919) [email protected]
S. M.
Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 19 of 25
-
STANDARD
PROJECTTITLE
Pub YearRev Due Date
PAR Issue Date
PAR Expiration
Standard StatusRemark
10/01/2008Working Group Chair
EmailPhone
SubCommittee POWER TRANSFORMERST.
(602) 236-8617
[email protected] Lundquist
PC57.12.10
Standard Requirements for Liquid-Immersed Power Transformers
1997 06/13/200212/31/2008
New Project - Std under development
Formerly NEMA/ANSI document.PAR extension request granted by NesCom to 12/31/2008.
Arteaga(601)[email protected]
J.
PC57.143
Guide for Application for Monitoring Equipment to Liquid-Immersed Transformers and Components
03/21/200212/31/2010
New Project - Active PAR Std under developemnt
PAR extension requested approved on 12/5/2006.
Chu(212) [email protected]
D.
PC57.148
Standard for Control Cabinets for Power Transformers 02/27/200412/31/2008
New Project - Active PAR Std under development
PAR Extension Request granted in Sept 08, until 12/31/2010
Watson(561) [email protected]
J.D.
PC57.150
Guide for the Transportation of Large Power Transformers and Reactors
11/18/200412/31/2008
New Project - PAR approved in Nov. 2004
PAR approved by NesCom in 11/18/2004NEEDS PAR EXTENSION
Anderson(402) [email protected]
G. W.
PC57.17
Standard Requirements for Arc Furnace Transformers 03/22/200712/31/2011
NEW PAR for revision
PAR for revision of old ANSI Std apporved Mar 22/08.
Corsi(330) [email protected]
D.
C57.116 IEEE Guide for Transformers Directly Connected to Generators
198912/31/2010
Approved
Reaffirmation approved in Dec. 2005
Raymond(518) [email protected]
T.
C57.117 IEEE Guide for Reporting Failure Data for Power Transformers and Shunt Reactors on Electric Utility Power Systems
198612/31/2006
Approved
Previously IEEE 786-1986, original approval date 6/19/1986Reaffirmation ballot pool formed. Need WG Chair
Binder, Jr.(724) [email protected]
W. B.
C57.120 IEEE Loss Evaluation Guide for Power Transformers and Reactors
199112/31/2011
Approved
Ref Std. 842Reaffirmation approved by RevCom 6/8/2006.
Lau(604) [email protected]
M. Y.
C57.125 IEEE Guide for Failure Investigation, Documentation, and Analysis for Power Transformers and Shunt Reactors
199112/31/2010
Approved
Std reaffirmed 5/10/2005
Binder, Jr.(724) [email protected]
W. B.
Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 20 of 25
-
STANDARD
PROJECTTITLE
Pub YearRev Due Date
PAR Issue Date
PAR Expiration
Standard StatusRemark
10/01/2008Working Group Chair
EmailPhone
SubCommittee POWER TRANSFORMERST.
(602) 236-8617
[email protected] LundquistC57.131
PC57.131
IEEE Standard Requirements for Load Tap Changers 199512/31/2007
05/15/200312/31/2009
Approved - Active PAR for Revision
PAR to Revise IEEE Std C57.131-1995PAR extension approved in 2007 until 12/31/2009
Henning(262) [email protected]
W. R.
C57.135
PC57.135
IEEE Guide for the Application, Specification and Testing of Phase- Shifting Transformers
200112/31/2011
02/20/200712/31/2011
Approved - Active PAR for Revision
Approved for IEEE/IEC Dual Logo Dec. 2005 - IEC 62032 Ed. 1
Sim(919) [email protected]
H. J.
C57.140 Evaluation and Reconditioning of Liquid Immersed Power Transformers
200612/31/2010
Approved
Approved by RevCom 11/16/2006
James(504) [email protected]
R.I.
C57.93
PC57.93
IEEE Guide for Installation of Liquid-Immersed Power Transformers
200812/31/2013
Approved
Rev of ASA C57.93-1958, IEEE Std C57.12.11-1980, & C57.12.12-1980Previous version IEEE Std C57.93-1995, reaffirmed in 2001.RevCom approved on 12/4/07 - published 3/31/08
Lau(604) [email protected]
M. Y.
IEEE 638
P638
IEEE Standard for Qualification of Class 1E Transformers for Nuclear Power Generating Stations
199212/31/2011
06/07/200712/31/2011
Approved - Active - with errata dated 4/7/1999
Reaffirmation approved by SA Board 3/30/2006.New PAR for revision approved 6/7/2007.
Swinderman(724) [email protected]
C.
Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 21 of 25
-
STANDARD
PROJECTTITLE
Pub YearRev Due Date
PAR Issue Date
PAR Expiration
Standard StatusRemark
10/01/2008Working Group Chair
EmailPhone
SubCommittee STANDARDSW. H.
(860) 722-5483
[email protected] BartleyC57.12.00
PC57.12.00
IEEE Standard General Requirements For Liquid-Immersed Distribution, Power, and Regulating Transformers
200612/31/2011
06/07/200712/31/2011
Approved - New PAR Active
Previous revision approved September, 2006.Published 2/28/2007. New PAR approved on 6/7/2007 for 2008 revision; ballot pool formed; Ballot opened Sept 30, 2008
Kim(626) [email protected]
D.
C57.12.70
PC57.12.70
IEEE Standard Terminal Markings and Connections for Distribution and Power Transformers
200012/31/2011
05/07/200712/31/2011
Approved - Active PAR for Revision
Reaffirmation approved by RevCom 3/30/2006.Published 3/16/2001.New PAR for revision approved by SA Board 5/7/2007
Shull(417) [email protected]
S.
C57.12.80
PC57.12.80
IEEE Standard Terminology for Power and Distribution Transformers
200212/31/2007
11/10/200512/31/2009
Approved - Active PAR
Amendment PAR approved to add thermally upgraded definitionPAR for Amendment withdrawn June 2008 PAR for Revision approved (June 2008) until December 2012
Raymond(518) [email protected]
T.
C57.12.90
PC57.12.90
IEEE Standard Test Code for Liquid-Immersed Distribution, Power, and Regulating Transformers
200612/31/2011
05/07/200712/31/2011
Approved - New PAR active for next revision
Previous revision approved 9/15/2006Published 2/15/2007New PAR active for 2008 revision; ballot pool formed. Ballot opened 9/30/08
Antosz(412) [email protected]
S.
C57.144 Guide for Metric Conversion of Transformer Standards 200412/31/2009
Approved
Published 10/22/2004
Olson(204) [email protected]
T.
IEEE 62
PC57.152
IEEE Guide for Diagnostic Field Testing of Power Apparatus - Part 1: Oil Filled Power Transformers, Regulators, and Reactors
199512/31/2010
05/19/200812/31/2012
Approved
Reaffirmation was approved on 3/19/05.New WG formed to revise document on a continuous basis New PAR number assigned: PC57.152PAR approved 5/19/08
Verner202 [email protected]
J. A.
Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 22 of 25
-
STANDARD
PROJECTTITLE
Pub YearRev Due Date
PAR Issue Date
PAR Expiration
Standard StatusRemark
10/01/2008Working Group Chair
EmailPhone
SubCommittee UNDERGROUND TR & NW PROTECTC. G.
(847) 683-2145
[email protected] NiemannC57.12.23
PC57.12.23
IEEE Standard for Underground Type, Self-Cooled, Single-Phase Distribution Transformers with Separable Insulated High-Voltage Connectors; High Voltage 25kV and Below; Low Voltage 600V and Below
200212/31/2009
03/04/200512/31/2009
Approved - Active PAR for revision
Published 8/8/06.Modified PAR approved (June '08) until December 2009
Traut(859) [email protected]
A.
C57.12.24
PC57.12.24
Requirements for Transformers - Underground-Type, Three Phase Distribution Transformers: High Voltage (34 500 GrdY/19 920 V and Below) and Low Voltage (480V and Below, 2500 kVA and Smaller
200012/31/2011
02/20/200712/31/2011
Standard withdrawn in 2001
Existing standard withdrawn by IEEE on 1/15/2001. No longer endorsed by IEEE. New working group formed to address revision. PAR approved Feb 27 2007. Ballot launched Sept 9, 2008
Termini(610) [email protected]
G.
C57.12.40
PC57.12.40
Standard for Requirements for Secondary Network Transformers - Subway and Vault Types (Liquid Immersed)
200612/31/2011
03/27/200712/31/2011
Approved - New PAR for Revision Active
D4 approved by RevCom 3/30/3006.Standard Published 9/15/2006.New PAR approved 3/27/2007
Klaponski(204) [email protected]
B.
C57.12.44
PC57.12.44
IEEE Standard Requirements for Secondary Network Protectors
200512/31/2010
Approved
PC57.12.44/D2.1 approved by RevCom in December 2005. Published 6/07/2006Previous revision in 2000.
Mulkey(415) [email protected]
D. H.
C57.12.57
NONE
Requirements for Ventilated Dry-Type Network Transformers 2500 kVA and Below, Three-Phase with High Voltage 34 500 Voltas and Below, Low Voltage 216Y/125 and 480Y/125 Volts
199212/31/2000
Standard withdrawn in 2001
Existing standard withdrawn by IEEE on 1/15/2001. No longer endorsed by IEEE. New working group formed to address revision. Need new PAR.
Robinson(361) [email protected]
A. L.
Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 23 of 25
-
IEEE/PES Transformers Committee - Activity Organization ChartChair: Tom Prevost
Vice Chair: J. Ed Smith Secretary: Bill Chiu Std. Coordinator: Bill Bartley
INSTRUMENTJames E. Smith
HVDC Converter Xfmrs & Smoothing Reactors
Richard Dudley
DRY TYPEChuck W. Johnson
DISTRIBUTION Ken Hanus
BUSHINGFred E. Elliott
POWERTom Lundquist
UG & NW ProtectorC. G. Niemann
Gen. Req. of BushingsRev of C57.19.00
Bushing App. GuideC57.19.100
OH Dist. Xfmrs C57.12.20
Wilks/Cooper
Eqp Encl. Integrity - PadC57.12.28
Elec Rpt of Test DataIEEE 1388/C57.12.37
General Req.C57.12.01
Req. & Test Code for HVDC Con. Xfmr
C57.129
Req. & Test Code for HVDC Smoothing
ReactorsIEEE 1277
Step Volt. RegulatorC57.15
Thermal Eval.PC57.12.60
Req for Inst. XfmrsC57.13
Test Proc. For Inst. Xfmrs
C57.13.2
Test Req. for >= 115kVPC57.13.5
Req. for Elect. Rev. MeteringC57.13.6
Guide for MonitoringC57.143
Directly Connected GSU
C57.116 Reaffirmation
Req. for Liq. Imm. Power Xfmrs
C57.12.10
Std. Req. for Sec. Network Xfmrs
C57.12.40
UG 3ph Dist Xfmr< 2500KVAC57.12.24
Dry Type Air-Core ReactorsC57.16
Performance Characteristics
C57.19.01
Req. & Testing of DC BushingsC57.19.03
Req.for Vent. 500KVAPC57.12.51
Req. for Sealed >500kVA
PC57.12.52
Thermal Eval. for Vented Dry-Type
InsulationC57.12.56
Transient AnalysisC57.12.58
Dry-Type Through Fault Current Duration
C57.12.59
Thermal Eval. For Solid-Cast& Resin Encap
InsulationC57.12.60
Test CodeC57.12.91
IEEE 683 - Class IEReaffirmation
Phase-Shift XfmrsC57.135
Eval & ReconditioningC57.140
Std for Control CabinetC57.148
Arc Furnace XfmrC57.17
Installation & Maint GuideC57.93
Vent Dry-Type Network Xfmrs
-
IEEE/PES Transformers Committee - Activity Organization ChartChair: Tom Prevost
Vice Chair: J. Ed Smith Secretary: Bill Chiu Std. Coordinator: Bill Bartley
Insulating Fluids Rick Ladroga
Insulation LifeDon Platts
Audible Sound & Vibration
Jeewan Puri
DIELECTRIC TESTLoren B. Wagenaar
Performance CharacteristicRamsis Girgis
StandardsWm. Bartley
Req. & Test Code for Shunt Reactors
>500kVA C57.21
Semicon Rectifier XfmrsC57.18.10
S. Kennedy
App. Guide for Xfmr Connections
C57.105 - Reaffirmation
Sound Level AbatementC57.136
Rev. to Impulse Test Guide
C57.98 & C57.138
Rev of Low Freq. TestsB. Poulin
Detection of PD -Acoustic Emission
C57.127
DGA GuideC57.104
Mineral OilC57.106
Silicone OilC57.111
DGA During Thermal Test
C57.130
Less Fammmable Hydro-Carbon Fluid
C57.121
Loading GuideC57.91
T. Raymond
TF Investigate Use of Furan Testing K. Haggerty
Max. Wdg Temp RiseIEEE 1538
Temp Rise Test Above NP RatingC57.119
Test Procedure Thermal Eval
C57.100R. Wickes
Cont Rev of C57.12.00D. Kim
Cont. Rev of C57.12.90S. Antosz
Metric Conversion of Xfmr StdsC57.144
TerminologyC57.12.80
B. Chiu
MeetingsGreg Anderson
Through-Fault Current Duration C57.109
Reaffirmation
Non-Sinusoidal Load CurrentC57.110
Xfmr Loss Measurement
C57.123
Short Circuit TestingPC57.133
Mitigation of Switching Transients CB/Xfmr
InteractionPC57.142
App. Of High Temp InsulationIEEE 1276
DGA in LTCC57.139
Natural Ester FluidC57.147
Reclamation of Insulating Oil
IEEE 637
DGA in SiliconeIEEE 1258/PC57.146
Website DevelopmentS. McNelly
Terminal Markings & Connections
S. Schull C57.12.70
Diagnostic Field Testing J. Verner
IEEE C57.152 //(62)Neutral Grounding Devices
IEEE32/PC57.32
Educational DevelopmentK. Haggerty
WG on DielectricTest Table
P. Hopkinson
Guide for Sound Level Measurement
PC57.151
TF for Ballot Comment Resolution
TF - Temp Rise Test -C57.12.90, Clause 11
P. Powell
TF - IEEE-IEC Cross Reference
J. Sim
Revised by W. Bartley 9/19/08
TF on Determination ofMoisture in Paper
J. SimFRA GuidePC57.149
PCS Rev to Test Code- 12.90
PCS Rev. to Gen Req - 12.00
S. Snyder
TF on PD MeasurementC57.113
Rev of Transient Voltage Test
P. Riffon/P. Heinzig
TF- External Dielectric Test Clearance
Eric Davis
TF- Special DielectricTest IssuesB. Forsyth
Page 25 of 25