Page 1 of 25 IEEE / PES /TRANSFORMERS COMMITTEE Standards Report To: Members of IEEE Transformers Committee From: Bill Bartley, Standards Coordinator Date: October 1, 2008 Re: Transformer Standards Activity since March, 2008 Executive Summary This report covers the Standards activity for the six-month period of March to October 1, 2008. The Transformer Committee is responsible for approximately 96 active standards, plus 45 projects for new standards and revisions. In the last six months, two New standards, five Revised standards, and five Reaffirmations were approved by REVCOM. Also, five PARs and two PAR extensions were approved by NESCOM. However, we have seven standards which may expire at the end of this year; and we have three PAR’s which may expire at the end of this year. In this Report: I. Standards Board Activity (NESCOM & REVCOM) A. NESCOM recommendations ........................ pg 1 B. REVCOM recommendations ........................ pg 2 C. TC Stds on December 2008 Agenda .......... pg 3 D. Standards Bd 2009 Meeting Calendar ........ pg 4 II. Transformer Ballot Status............................... pg 5 III. Transformer PAR’s active .............................. pg 6-7 IV. Transformer Stds Status database .................. pg 8- 23 V. Transformer Stds Org Chart ........................... pg 24-25 I. Standards Board Activity A. NESCOM Recommendations (New Standards Committee) 1, NEW PARs approved PC57.153 Guide for Transformer Paralleling (March) Approved new PAR until December 2012 2. PARs for the Revisions of Standards PC57.12.23 Standard for Submersible Single-Phase Transformers: 167 kVA and Smaller; High Voltage 25 000 V and Below; Low Voltage 600 V and Below (June) Approved modification of the PAR until December 2009 PC57.12.80 Standard Terminology for Power and Distribution Transformers (June ) Approved PAR for revision until December 2012 PC57.21 Standard Requirements, Terminology, and Test Code for Shunt Reactors Rated Over 500 kVA (March) (This revised standard was also approved in March 2008) PC57.152 Guide for Diagnostic Field Testing of Fluid Filled Power Transformers, Regulators & Reactors (May) (Early consideration): Approved PAR for the revision of the old IEEE 62 until December 2012

Transcript of IEEE / PES /TRANSFORMERS COMMITTEE Standards...

  • Page 1 of 25

    IEEE / PES /TRANSFORMERS COMMITTEE

    Standards Report To: Members of IEEE Transformers Committee

    From: Bill Bartley, Standards Coordinator

    Date: October 1, 2008

    Re: Transformer Standards Activity since March, 2008

    Executive Summary This report covers the Standards activity for the six-month period of March to October 1, 2008. The Transformer Committee is responsible for approximately 96 active standards, plus 45 projects for new standards and revisions. In the last six months, two New standards, five Revised standards, and five Reaffirmations were approved by REVCOM. Also, five PARs and two PAR extensions were approved by NESCOM. However, we have seven standards which may expire at the end of this year; and we have three PAR’s which may expire at the end of this year.

    In this Report: I. Standards Board Activity (NESCOM & REVCOM)

    A. NESCOM recommendations ........................ pg 1 B. REVCOM recommendations........................ pg 2 C. TC Stds on December 2008 Agenda .......... pg 3 D. Standards Bd 2009 Meeting Calendar........ pg 4

    II. Transformer Ballot Status............................... pg 5 III. Transformer PAR’s active .............................. pg 6-7 IV. Transformer Stds Status database .................. pg 8- 23 V. Transformer Stds Org Chart ........................... pg 24-25

    I. Standards Board Activity

    A. NESCOM Recommendations (New Standards Committee) 1, NEW PARs approved PC57.153 Guide for Transformer Paralleling (March)

    Approved new PAR until December 2012 2. PARs for the Revisions of Standards PC57.12.23 Standard for Submersible Single-Phase Transformers: 167 kVA and Smaller; High Voltage 25 000 V and Below; Low Voltage 600 V and Below (June) Approved modification of the PAR until December 2009

    PC57.12.80 Standard Terminology for Power and Distribution Transformers (June ) Approved PAR for revision until December 2012

    PC57.21 Standard Requirements, Terminology, and Test Code for Shunt Reactors Rated Over 500 kVA (March) (This revised standard was also approved in March 2008)

    PC57.152 Guide for Diagnostic Field Testing of Fluid Filled Power Transformers, Regulators & Reactors (May) (Early consideration):

    Approved PAR for the revision of the old IEEE 62 until December 2012

  • Page 2 of 25

    NESCOM Recommendations continued

    3. PAR Extension Requests PC57.148 Standard for Control Cabinets for Power Transformers (September ) Approved request for two year extension until December 2010 PC57.149 Guide for the Application and Interpretation of Frequency Response Analysis for Oil Immersed Transformers (September ) Approved request for two year extension until December 2012 4. PARs EXPIRING Dec. 31 - 2008 PC57.12.10 Standard Requirements for Liquid-Immersed Power Transformers

    (Std is already withdrawn; PAR expires 12-31-08) [Power Transformer SC]

    PC57.100 Standard Test Procedure for Thermal Evaluation of Insulation Systems for Liquid-Immersed Distribution and Power Transformers (Std and PAR expires 12-31-08) [Insulation Life SC]

    PC57.150 Guide for the Transportation of Transformers and Reactors Rated 10,000 kVA or larger (new project; PAR expires 12-31-08) [Power Transformer SC]

    B. REVCOM Recommendations (Standards Review Committee)

    1. NEW Transformer Standards Approved PC57.18.10a Standard Practices and Requirements for Semiconductor Power Rectifier

    Transformers - Amendment: Technical and Editorial Corrections (March) PC57.147 Guide for Acceptance & Maintenance of Natural Ester Fluids in Transformers (May) 2. Revisions Approved C57.12.51 Standard for Ventilated Dry-Type Power Transformers, 501 kVA and Larger, Three-

    Phase, with High-Voltage 601 to 34500 Volts; Low-Voltage 208Y/120 to 4160 Volts - General Requirements (September)

    C57.13 Standard Requirements for Instrument Transformers (March)

    C57.21 Standard Requirements, Terminology, and Test Code for Shunt Reactors Rated Over 500 kVA (March)

    C57.110 Recommended Practice for Establishing Liquid-Filled and Dry-Type Power and Distribution Transformer Capability When Supplying Nonsinusoidal Load Currents (March)

    C57.104 Guide for the Interpretation of Gasses Generated in Oil-Immersed Transformers (September)

    3. Reaffirmations Approved C57.12.32 Standard for Submersible Equipment - Enclosure Integrity (March)

    C57.12.58 Guide for Conducting a Transient Voltage Analysis of a Dry-Type Transformer Coil (September)

  • Page 3 of 25

    REVCOM Recommendations - continued (Reaffirmations) C57.105 Guide for Application of Transformer Connections in Three-Phase Distribution Systems

    (March)

    C57.109 Guide for Liquid-Immersed Transformer Through-Fault-Current Duration (March)

    C57.119 Recommended Practice for Performing Temperature Rise Tests on Oil-Immersed Power Transformers at Loads Beyond Nameplate Ratings (March)

    44.. TTrraannssffoorrmmeerr SSttaannddaarrddss tthhaatt aarree EExxppiirriinngg aatt eenndd ooff 22000088

    C57.12.56-1986 IEEE Standard Test Procedure for Thermal Evaluation of Insulation Systems for Ventilated Dry-Type Power and Distribution Transformers This standard is being merged with C57.12.60; and 12.56 will be Administratively withdrawn. [Dry]

    C57.12.80- Standard Terminology for Power and Distribution Transformers There is an active PAR for the Revision; work is in progress, and a ballot pool formed. [Stds]

    PC57.18.10 Standard Practices and Requirements for Semiconductor Power Rectifier Transformers A Reaffirmation Ballot Invitation was opened in September 2008. [PCS]

    C57.100 Standard Test Procedure for Thermal Evaluation of Insulation Systems for Liquid-Immersed Distribution and Power Transformers (Std and PAR expires 12-31-08) Needs PAR extension NOW. [Ins Life]

    C57.111 Guide for Acceptance of Silicone Insulating Fluid and Its Maintenance in Transformers There is no active PAR for Revision; and evidently no work in progress. [Ins Fluids]

    C57.121-1998 IEEE Guide for Acceptance and Maintenance of Less-Flammable Hydrocarbon Fluid in Transformers This standard was balloted (Reaffirmation) in July 2008. It is currently in Comment Resolution stage. [Ins Fluids]

    C57.124-1991 (R2002) IEEE Recommended Practice for the Detection of Partial Discharge and the Measurement of Apparent Charge in Dry-Type Transformers A Reaffirmation Ballot Invitation was opened in September 2008. [Dry]

    C. December 2008 Agenda for REVCOM and NESCOM

    As of Oct 1, the Agenda for December ’08 meeting of RevCom and NesCom has not been published. (An agenda has been released for a Standards Board Early Consideration teleconference, on 27 October 2008. But, there are no Transformer Committee standards on the Agenda.)

    D. 2009 Standards Board Meeting Schedule

    Standards Bd Meeting Deadline for Submissions

    March 17-19 6 February 2009

    June 15-17 7 May 2009

    September 9-11 31 July 2009

    December 7-9 19 October 2009

  • Page 4 of 25

    2009 Standards Board Calendar

  • Page 5 of 25

    II. Transformer Ballot Status as of October 1, 2008 (from myBallot™) Sub

    committee PAR or

    Standard # Title Ballot Status Notes

    PreBallot Standards- C57.12.00 Cont. Rev of Std General

    Requirements PreBallot Ballot opened Sept 30 ‘08

    closes Oct 30 ‘08 UTNP C57.12.24 Standard for Submersible, 3-Phase

    Transformers, < 3750 kVA PreBallot Ballot opened Sept 9 -

    Closes Oct 9’ 08 Standards- C57.12.80 Standard Terminology for Power and

    Distribution Transformers PreBallot Ballot Pool Invitation Issued

    Standards- C57.12.90 Cont. Rev of Std Test Code PreBallot Ballot opened Sept 30 ‘08 closes Oct 30 ‘08

    PCS- C57.18.10 (Reaff) Requirements for Semiconductor Power Rectifier Transformers

    PreBallot Reaff Ballot Pool Invitation opened Sept 12 ‘08

    Di Tests C57.113 Rec Practice for PD Measurement in Liquid-Filled Pwr Trfmers & Shunt Rx

    PreBallot Copyright issues

    PCS- PC57.142 Describe the Occurrence And Mitigation Of Switching Transients

    PreBallot

    Dry C57.124 Rec Prac for Detection of PD in Dry Tx PreBallot Reaff Ballot Pool Invitation opened Sept 19 ‘08

    Comment Resolution InsFluid- C57.121 Guide for Acceptance and

    Maintenance of Less-Flammable Hydrocarbon Fluid in Transformers

    Comment Resolution

    Reaff Ballot closed July 2 08

    PCS PC57.123 Guide for Transformer Loss Measurement

    Comment Resolution

    Hold up due to dual Logo process

    UTNP C57.12.23 Standard for Submersible Single-Phase Transformers

  • Page 6 of 25

    III.. Transformer Committee - Active PARs as of October 1, 2008

    P 638 Standard for Qualification of Class 1E Transformers for Nuclear Power Generating

    Stations Dec 2011

    P1277 Standard General Requirements and Test Code for Dry-Type and Oil-Immersed Smoothing Reactors for DC Power Transmission

    Dec 2009

    PC57.12.00 Standard General Requirements for Liquid-Immersed Distribution, Power, and Regulating Transformers

    Dec 2011 Ballot opened Sept 30 ‘08

    PC57.12.10 Standard Requirements for Liquid-Immersed Power Transformers Dec 2008

    PC57.12.20 Standard for Overhead Type Distribution Transformers, 500 kVA and Smaller Dec 2010

    PC57.12.23 Standard for Submersible Single-Phase Transformers Dec 2009 Ballot closed June 6’ 08 PC57.12.24 Standard for Submersible, Three-Phase Transformers, 3750 kVA and Smaller Dec 2011 Ballot opened Sept 08 PC57.12.30 Standard for Pole-Mounted Equipment - Enclosure Integrity for Coastal

    Environments Dec 2011

    PC57.12.31 Standard for Pole Mounted Equipment - Enclosure Integrity Dec 2011 PC57.12.34 Standard for Requirements for Pad-Mounted, Compartmental Type, Self Cooled,

    Three Phase Distribution Transformers, 5 MVA and Smaller; High Voltage, 34.5kV Nominal System Voltage and Below; Low Voltage, 15kv Nominal System Voltage and Below

    Dec 2009

    PC57.12.38 Standard for Padmounted Type, Self-Cooled, Single Phase Distribution Transformers; High Voltage, 34500 GrdY/19920 Volts and below, Low voltage, 240/120 Volts; 167 kVA and smaller

    Dec 2009

    PC57.12.40 Standard for Network, Three-Phase Transformers, 2500 kVA and Smaller; High Voltage, 34 500 GrdY/19 920 and Below; Low Voltage, 600 Volts and and Below; Subway and Vault Types (Liquid Immersed)

    Dec 2011

    PC57.12.51 Standard for Ventilated Dry-type Power Transformers, 501 kVA and Larger, Three-Phase, with High-Voltage 601 to 34500 Volts; Low-Voltage 208Y/120 to 4160 Volts - General Requirements

    Balloted and approved 9/08

    PC57.12.52 Standard for Sealed Dry-Type Power Transformers, 501 kVA and Larger, Three-Phase, with High-Voltage 601 to 34500 Volts, Low-Voltage 208Y/120 to 4160 Volts- General Requirements

    Dec 2011

    PC57.12.60 Standard Test Procedure for Thermal Evaluation of Insulation Systems for Dry Type Power and Distribution Transformers, Including Open-Wound, Solid-Cast and Resin Encapsulated Transformers

    Dec 2009

    PC57.12.70 Standard Terminal Markings and Connections for Distribution and Power Transformers Dec 2011

    PC57.12.80 Standard Terminology for Power and Distribution Transformers Dec 2012 Ballot pool formede PC57.12.90 Standard Test Code for Liquid-Immersed Distribution, Power, and Regulating

    Transformers Dec 2011 Ballot opened

    Sept 30 ‘08 PC57.12.91 Standard Test Code for Dry-Type Distribution and Power Transformers Dec 2010 PC57.13.5 Standard of Performance and Test Requirements for Instrument Transformers of a

    Nominal System Voltage of 115 kV and Above Dec 2009

    PC57.15 Standard Requirements, Terminology, and Test Code for Step-Voltage Regulators Dec 2009 PC57.16 Standard Requirements, Terminology, and Test Code for Dry-Type Air-Core

    Series-Connected Reactors Dec 2010

    PC57.17 Standard Requirements for Arc Furnace Transformers Dec 2011 PC57.19.03 Standard Requirements, Terminology, and Test Code for Bushings for DC

    Applications Rated 110 kV BIL and Above Dec 2011

    PC57.19.100 Guide for Application of Power Apparatus Bushings Dec 2010 PC57.32 Std Requirements, Terminology & Test Procedures for Neutral Grounding Devices Dec 2009

  • Page 7 of 25

    Active PARs - continued PC57.91 Guide for Loading Liquid Immersed Transformers and Voltage Regulators Dec 2009 PC57.98 Guide for Transformer Impulse Tests Dec 2009 PC57.100 Standard Test Procedure for Thermal Evaluation of Insulation Systems for Liquid-

    Immersed Distribution and Power Transformers Dec 2008 PC57.104 Guide for the Interpretation of Gases Generated in Oil-Immersed Transformers

    Balloted and approved 9/08

    PC57.113 Recommended Practice for Partial Discharge Measurement in Liquid-Filled Power Transformers and Shunt Reactors Dec 2011

    PC57.123 Guide for Transformer Loss Measurement Dec 2011

    Hold up due to Dual Logo

    PC57.130 Trial-Use Guide for the Use of Dissolved Gas Analysis During Factory Temperature Rise Tests for the Evaluation of Oil-Immersed Transformers and Reactors Dec 2009

    PC57.131 Standard Requirements for Tap Changers Dec 2009 PC57.133 Guide for Short-Circuit Testing of Distribution and Power Transformers Dec 2009 PC57.135 Guide for the Application, Specification and Testing of Phase Shifting

    Transformers Dec 2011 PC57.139 Guide for Dissolved Gas Analysis in Transformer Load Tap Changers Dec 2009 PC57.142 Guide to Describe the Occurrence and Mitigation of Switching Transients Induced

    by Transformer, Switching Device, and System Interaction Dec 2011 PC57.143 Guide for Application for Monitoring Equipment to Liquid-Immersed Transformers

    and Components Dec 2010 PC57.148 Standard for Control Cabinets for Power Transformers

    Dec 2010 Extension Granted 9/08

    PC57.149 Guide for the Application and Interpretation of Frequency Response Analysis for Oil Immersed Transformers Dec 2010

    Extension Granted 9/08

    PC57.150 Guide for Transportation of Transformers and Reactors Rated > 10,000 kVA Dec 2008 PC57.151 Guide for Sound Level Measurement Guide for Liquid Filled and Dry Type

    Transformers and Reactors Dec 2009 PC57.152 Guide for Diagnostic Field Testing of Fluid Filled Power Transformers, Regulators,

    and Reactors Dec 2012 PC57.153 Guide for Paralleling Power Transformers Dec 2012

    [end]

  • IEEE/PES TRANSFORMERS COMMITTEEStatus Report of PE/TR Standards

    October, 2008Porto, Portugal

    STANDARD

    PROJECTTITLE

    Pub YearRev Due Date

    PAR Issue Date

    PAR Expiration

    Standard StatusRemark

    10/01/2008Working Group Chair

    EmailPhone

    SubCommittee AUDIBLE SOUND & VIBRATIONJ.

    (704) 821-6638

    [email protected] Puri

    P57.151

    IEEE Guide for Sound Level Measurement for Liquid Immersed Transformers and Reactors

    12/07/200512/31/2010

    New Project - Active PAR Std under development

    IEC granted permission for use of IEC documents

    Puri(704) [email protected]

    J.

    C57.136 IEEE Guide for Sound Level Abatement and Determination for Liquid- Immersed Power Transformers and Shunt Reactors Rated Over 500 kVA

    200012/31/2010

    Approved - Reaffirmed September '05

    Reaffirmation approved by RevCom on 9/21/2005

    Darwin44 1785 [email protected]

    A.W.

    SubCommittee BUSHINGF. E.

    (360) 418-2269

    [email protected] ElliottC57.19.00 Standard General Requirements and Test Procedure for

    Power Apparatus Bushings200412/31/2009

    Approved

    Formally Std. IEEE 21Previous revision 1991. D6.1 approved by RevCom in Dec., 2004

    Ellis(615) [email protected]

    K. P.

    C57.19.01 IEEE Standard Performance Characteristics and Dimensions for Outdoor Apparatus Bushings

    200012/31/2010

    Approved

    Formally Std. IEEE 24Reaffirmed in 2005.

    Singh(731) [email protected]

    P.

    C57.19.03

    PC57.19.03

    IEEE Standard Requirements, Terminology, and Test Code for Bushings for DC Applications

    199612/31/2007

    12/05/200712/31/2011

    Approved with Corrigenda

    See Corrigenda -1, Published in 2006New PAR for revision submitted 10/2007PAR approved by Nescom Dec07

    Elliott(360) [email protected]

    F. E.

    C57.19.03-1996/ Standard Requirements, Terminology, and Test Code for Bushing for DC Applications - Corrigendum 1 12/31/2007

    Approved

    Published 6/6/2006

    Elliott(360) [email protected]

    F. E.

    C57.19.100

    PC57.19.100

    IEEE Guide for Application of Power Apparatus Bushings

    199512/31/2010

    03/30/200612/31/2010

    Approved - Active PAR for Revision

    Revision for C57.19.101-1992New PAR requested and approved to 12/31/2010.

    Spitzer(817) [email protected]

    T.

    Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 8 of 25

  • STANDARD

    PROJECTTITLE

    Pub YearRev Due Date

    PAR Issue Date

    PAR Expiration

    Standard StatusRemark

    10/01/2008Working Group Chair

    EmailPhone

    SubCommittee DIELECTRIC TESTSL. B.

    (614) 552-1759

    [email protected] WagenaarC57.113

    PC57.113

    IEEE Guide for Partial Discharge Measurement in Liquid-Filled Power Transformers and Shunt Reactors

    199112/31/2007

    05/07/200712/31/2011

    Active PAR for revision

    New PAR approved on 5/7/2007.Ballot Pool Invitation opened Mar 7-08; closed Apr 6-08

    Poulin(450) [email protected]

    B.

    C57.127 IEEE Guide for the Detection of Acoustic Emissions from Partial Discharges in Oil-Immersed Power Transformers

    200712/31/2012

    Approved - D10.0 approved - in final edit

    PAR to Revise IEEE Std C57.127-2000D10.0 approved by SA Board 3/22/2007

    Harley(330) [email protected]

    J. W.

    C57.138 IEEE Recommended Practice for Routine Impulse Test for Distribution Transformers

    199812/31/2010

    Approved - Reaffirmed in June '05

    Reaffirmation approved by RevCom on 6/8/05.

    Molden(845) [email protected]

    A.

    C57.98

    PC57.98

    IEEE Guide for Transformer Impulse Tests 199412/31/2009

    09/12/200212/31/2009

    Approved - Active PAR for Revision

    PAR to Revise IEEE Std C57.98-1994PAR extension requested and approved to 12/31/2009.

    Molden(845) [email protected]

    A.

    Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 9 of 25

  • STANDARD

    PROJECTTITLE

    Pub YearRev Due Date

    PAR Issue Date

    PAR Expiration

    Standard StatusRemark

    10/01/2008Working Group Chair

    EmailPhone

    SubCommittee DISTRIBUTION TRANSFORMERSK. S.

    (817) 215-4444

    [email protected] Hanus

    PC57.12.30

    Standard for Pole-Mounted Equipment - Enclosure Integrity for Coastal Environments

    03/22/200712/31/2011

    New Project

    New project: covers conformance tests and requirements for the enclosure integrity of pole-mounted equipment in coastal locations

    Olen(262) [email protected]

    O.

    PC57.12.33

    Guide for Distribution Transformer Loss Evaluation 06/25/199812/31/2004

    PAR Withdrawn - Inactive WG

    Decision made at Las Vegas Meeting to discontinue project. PAR administratively withdrawn by Nescom Dec '04

    Pekarek(330) [email protected]

    T. J.

    C57.12.20

    PC57.12.20

    Standard for Overhead Type Distribution Transformers, 500 kVA and Smaller, High-Voltage 34 500 Volts and Below; Low-Voltage, 7970/13 800 Y Volts and Below

    200512/31/2010

    09/15/200612/31/2010

    Approved - Active PAR for Revision

    New PAR requested and approved to 12/31/2010.

    Wilks(731) [email protected]

    A. L.

    C57.12.25

    PC57.12.38

    Standard for Pad-Mounted, Compartmental-Type, Self-Cooled, Single-Phase Distribution Transformers with Separable Insulated High-Voltage Connectors; High Voltage, 34500 GrdY/19920 Volts and Below, Low Voltage, 240/120 Volts; 167 kVA and SmallerRequirements

    12/31/200908/11/200512/31/2009

    Approved - Active PAR for revision

    Original PAR PC57.12.25 administratively withdrawn on 12/7/04 NesCom Meeting.New PAR PC57.12.38 approved 8/11/05.PAR modified in 2006, approved to 12/31/2009.1st ballot completed 9/28/2007

    Ghafourian(731) [email protected]

    A. A.

    C57.12.28

    PC57.12.28

    Standard for Pad Mounted Equipment - Enclosure Integrity

    200512/31/2010

    Approved

    Previously NEMA/ANSI C57.12.28-1999Published 9/30/2005

    Olen(262) [email protected]

    O.

    C57.12.29

    PC57.12.29

    Standard for Pad Mounted Equipment - Enclosure Integrity for Coastal Environments

    200512/31/2010

    Approved

    Previously NEMA/ANSI C57.12.29-1991Current standards Published 10/10/2005.

    Olen(262) [email protected]

    O.

    C57.12.31

    PC57.12.31

    IEEE Standard for Pole Mounted Equipment - Enclosure Integrity

    200212/31/2011

    03/22/200712/31/2011

    Approved - Active PAR for Revision

    Published 3/6/2003.New PAR approved 3/22/2007

    Olen(262) [email protected]

    O.

    C57.12.32 Standard for Submersible Equipment - Enclosure Integrity

    200212/31/2013

    Approved

    Published 3/7/2003.Reaffirmation approved 03/28/08

    Olen(262) [email protected]

    O.

    Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 10 of 25

  • STANDARD

    PROJECTTITLE

    Pub YearRev Due Date

    PAR Issue Date

    PAR Expiration

    Standard StatusRemark

    10/01/2008Working Group Chair

    EmailPhone

    SubCommittee DISTRIBUTION TRANSFORMERSK. S.

    (817) 215-4444

    [email protected] HanusC57.12.34

    PC57.12.34

    Requirements for Pad-Mounted, Compartmental-Type, Self-Cooled, Three-Phase DistributionTransformers, 2500 kVA and Smaller: High-Voltage, 34 500GrdY/19 920 Volts and Below; Low Voltage, 480 Volts and Below

    12/31/200903/20/200512/31/2009

    Approved - Active PAR for revision

    Originally Std. 1447, Combined C57.22-1980 & C57.12.26-1992Approved by RevCom 9/22/2004; published 3/8/05New PAR for revision approved 3/19/2005.

    Shull(417) [email protected]

    S.

    C57.12.35 IEEE Standard for Bar Coding for Distribution Transformers

    200712/31/2012

    Approved

    Formerly P1265.C57.12.35-1996 reaffirmation 6/23/2004.Approved by SA Board 9/27/2007

    Matthews(601) [email protected]

    P

    C57.12.36

    PC57.12.36

    Standard Requirements for Liquid-Immersed Distribution Substation Transformers

    200712/31/2012

    Approved

    PAR extended to 12/31/2008.Approved by SA Board on 9/27/2007

    Rossetti(901) [email protected]

    J. R.

    C57.12.37 IEEE Standard for the Electronic Reporting of Transformer Test Data

    200612/31/2011

    Approved

    Formerly C57.132, IEEE Std 1388-2000Approved on 3/30/2006. Published 7/21/2006

    Hollingsworth(601) [email protected]

    R.

    C57.15

    PC57.15

    IEEE Standard Requirements, Terminology, and Test Code for Step-Voltage Regulators

    199912/31/2009

    06/09/200512/31/2009

    Approved - Active PAR for Revision

    A new PAR was approved 6/9/05 due to scope changes. Original PAR withdrawn.

    Colopy(262) [email protected]

    C. A.

    Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 11 of 25

  • STANDARD

    PROJECTTITLE

    Pub YearRev Due Date

    PAR Issue Date

    PAR Expiration

    Standard StatusRemark

    10/01/2008Working Group Chair

    EmailPhone

    SubCommittee DRY TYPE TRANSFORMERSC. W.

    (276) 688-1512

    [email protected] Johnson, Jr.C57.12.01 IEEE Standard General Requirements for Dry-Type

    Distribution and Power Transformers Including Those with Solid Cast and/or Resin Encapsulated Windings

    200512/31/2010

    Approved

    Previous 1998 version was successfully revised and approved in 2005.Published 5/19/2006

    Sullivan(813) [email protected]

    J. C.

    C57.12.51

    PC57.12.51

    Ventilated Dry-Type Power Transformers, 501 kVA and Large, Three-Phase, with High-Voltage 601 to 34500 Volts; Low-Voltage 208Y/120 to 4160 Volts - General Requirements

    200812/31/2013

    09/15/200612/31/2010

    Approved

    Previously NEMA document C57.12.51, original publication by NEMA in 1981, Reaffirmed in 1998. document transferred to IEEE in Dec 2002.New PAR approved in 20060. PAR modification approved 12-05-07. Revised Standard approved 9/27/08

    Powell(202) [email protected]

    P. A.

    C57.12.52

    PC57.12.52

    Standard Requirements for Sealed Dry-Type Power Transformers, 501 kVA and Larger, Three-Phase, with High-Voltage 601 to 34 500 Volts, Low-Voltage 208Y/120 to 4160 Volts

    1981 05/07/200712/31/2011

    Active PAR for revision

    Previously ANSI C57.12.52-1981NEW PAR approved for revision to Dec 2011

    Kennedy(716) [email protected]

    S. P.

    C57.12.56

    PC57.12.60

    IEEE Standard Test Procedure for Thermal Evaluation of Insulation Systems for Ventilated Dry-Type Power and Distribution Transformers

    198112/31/2007

    12/10/200312/31/2009

    Extended to Dec 2008

    Revcom recommended ADMINISTRATIVE WITHDRAWAL12.56 AND 12.60 are being MERGED

    Wicks(804) [email protected]

    R. C.

    C57.12.58 IEEE Guide for Conducting a Transient Voltage Analysis of a Dry-Type Transformer Coil

    199112/31/2013

    Approved - Active

    Reaffirmation approved 9/27/2008

    Kline(843) [email protected]

    A. D.

    C57.12.59 IEEE Guide for Dry-Type Transformer Through-Fault Current Duration

    200112/31/2011

    Approved

    Reaffirmation approved in 12/5/2006.

    Powell(202) [email protected]

    P. A.

    C57.12.60

    PC57.12.60

    IEEE Guide for Test Procedures for Thermal Evaluation of Insulation Systems for Solid Cast and Resin-Encapsulated Power and Distribution Transformers

    199812/31/2007

    12/10/200312/31/2008

    Approved - Active PAR for Revision

    PAR to Revise IEEE Std C57.12.56-1986 and IEEE Std C57.12.60-1998PAR extended to 12-31-09

    Wicks(804) [email protected]

    R. C.

    C57.12.91

    PC57.12.91

    IEEE Standard Test Code for Dry-Type Distribution and Power Transformers

    200112/31/2010

    12/05/200612/31/2010

    Approved - Active PAR for Revision

    New PAR for Revision approved 12/5/2006PAR for Amendment withdrawn

    Foster(815) [email protected]

    D. R.

    Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 12 of 25

  • STANDARD

    PROJECTTITLE

    Pub YearRev Due Date

    PAR Issue Date

    PAR Expiration

    Standard StatusRemark

    10/01/2008Working Group Chair

    EmailPhone

    SubCommittee DRY TYPE TRANSFORMERSC. W.

    (276) 688-1512

    [email protected] Johnson, Jr.C57.124 IEEE Recommended Practice for the Detection of

    Partial Discharge and the Measurement of Apparent Charge in Dry-Type Transformers

    199112/31/2007

    Approved

    Need to initiate reaffirmation and request extension.Expiration extended by Revcom to 12-31-08Reaff Ballot Invitation opened 9/19/08

    Johnson, Jr.(276) [email protected]

    C. W.

    C57.134 IEEE Guide for Determination of Hottest Spot Temperature in Dry Type Transformers

    200012/31/2011

    Approved

    Reaffirmation approved 3/30/2006

    Powell(202) [email protected]

    P. A.

    C57.16

    PC57.16

    IEEE Standard Requirements, Terminology, and Test Code for Dry-Type Air- Core Series-Connected Reactors

    199612/31/2010

    11/02/200612/31/2010

    Approved

    PAR for revision approved 11/2/2006.

    Dudley(416) [email protected]

    R. F.

    C57.94 IEEE Recommended Practice for Installation, Application, Operation, and Maintenance of Dry-Type General Purpose Distribution and Power Transformers

    198212/31/2010

    Approved

    Reaffirmation approved 12/6/2006

    Lewis(910) [email protected]

    T. D.

    C57.96 IEEE Guide for Loading Dry Type Distribution and Power Transformers

    199912/31/2009

    Approved - Active

    Reaffirmation approved 9/22/2004Previous revision in 1994.

    Prevost(802) [email protected]

    T. A.

    IEEE 259 IEEE Standard Test Procedure for Evaluation of Systems of Insulation for Dry-Type Specialty and General-Purpose Transformers

    199912/31/2009

    Approved

    Reaffirmation approved 9/22/04

    Simpson, Jr.(603) [email protected]

    R. W.

    SubCommittee HV CONVERTER TR & REACTORSR. F.

    (416) 298-8108

    [email protected] DudleyC57.129

    PC57.129

    IEEE General Requirements and Test Code for Oil Immersed HVDC Converter Transformers

    200712/31/2012

    Approved

    Trial use std published 6/6/2000; upgraded to full use 3/2002PAR for revision approved on 6/24/2004Approved 9/27/2007

    Dudley(416) [email protected]

    R. F.

    IEEE 1277

    P1277

    IEEE General Requirements and Test Code for Dry-Type and Oil-Immersed Smoothing Reactors for DC Power Transmission

    200012/31/2005

    11/10/200512/31/2009

    Approved. Active PAR for revision

    Active PAR for revision.

    Dudley(416) [email protected]

    R. F.

    Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 13 of 25

  • STANDARD

    PROJECTTITLE

    Pub YearRev Due Date

    PAR Issue Date

    PAR Expiration

    Standard StatusRemark

    10/01/2008Working Group Chair

    EmailPhone

    SubCommittee INSTRUMENT TRANSFORMERSJ. E.

    (601) 346-9104

    [email protected] SmithC57.13

    PC57.13

    IEEE Standard Requirements for Instrument Transformers

    199312/31/2013

    12/10/200312/31/2007

    Approved

    PAR to Revise IEEE Std C57.13-1993PAR extended to 12-31-08 Revision Ballot closed 10-23-07Revision Approved 3/28/08

    Nelson(301) [email protected]

    T. N

    C57.13.2 Conformance Test Procedure for Instrument Transformers

    200512/31/2010

    Approved

    C57.13.2-1991 revised to harmonize with C57.13-1993Approved by RevCom on 6/8/2005Published 9/29/2005.

    Khalin(859) [email protected]

    V. M.

    C57.13.5

    PC57.13.5

    Standard of Performance and Test Requirements for Instrument Transformers of a Nominal System Voltage of 115 kV and Above

    200612/31/2009

    12/07/200512/31/2009

    Approved - Active PAR for Revision

    Reference Std. 1400Previously C57.13.5 was a trial useUpgraded to Full Use 3/30/2006

    Riffon(514) 840-3000 [email protected]

    P.

    C57.13.6 Standard for High Accuracy Instrument Transformers12/31/2010

    Approved

    Document published in 12/9/2005

    Ten Haagen(603) [email protected]

    C. W.

    Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 14 of 25

  • STANDARD

    PROJECTTITLE

    Pub YearRev Due Date

    PAR Issue Date

    PAR Expiration

    Standard StatusRemark

    10/01/2008Working Group Chair

    EmailPhone

    SubCommittee INSULATING FLUIDSR. K.

    (617) 393-3133

    [email protected] Ladroga

    PC57.130

    IEEE Trial-Use Guide for the Use of Dissolved Gas Analysis During Factory Temeprature Rise Tests for the Evaluation of Oil-Immersed Transformers and Reactors

    01/30/200012/31/2009

    New Project - under development

    currently under ballot resolution.PAR extension requested and approved to 12/31/2007.PAR extension requested and approved to 12/31/2009.

    Ladroga(617) [email protected]

    R. K.

    PC57.139

    Guide for Dissolved Gas Analysis in Transformer Load Tap Changers

    12/11/200212/31/2009

    New Project - under development

    Orig PAR to expire 12/31/2006. Deferred PAR withdrawal to 3/2007.PAR extended to 2009

    Jakob(916) [email protected]

    F.

    C57.104

    PC57.104

    IEEE Guide for the Interpretation of Gases Generated in Oil-Immersed Transformers

    199112/31/2013

    06/30/200612/31/2010

    Approved

    Original PAR and document withdrawn in Dec. 2005. New PAR approved in June 06. Ballot closed 10/10/07 Revision approved 09/27/08

    Ladroga(617) [email protected]

    R. K.

    C57.106 IEEE Guide for Acceptance and Maintenance of Insulating Oil in Equipment

    200612/31/2011

    Approved

    D6 pproved 12/6/2006Previously version in 2002, 1991 (R1998), 1977

    Thompson(605) [email protected]

    J. A.

    C57.111 IEEE Guide for Acceptance of Silicone Insulating Fluid and Its Maintenance in Transformers

    198312/31/2008

    Approved

    Standard EXPIRES Dec 31 2008

    Ladroga(617) [email protected]

    R. K.

    C57.121 IEEE Guide for Acceptance and Maintenance of Less-Flammable Hydrocarbon Fluid in Transformers

    199812/31/2007

    Approved

    Was to be administratively withdrawn in Dec., 2004Reaffirmation ballot pool invitation initiated in October, 2005.Exp. Date extended to 12/31/2007 Insulating Fluids Subcommittee decided on 10/17/2007 to withdraw this standard.However in 2008 Reaffirmation ballot in July; currently in Resolution

    McShane(262) [email protected]

    C. P.

    C57.146 Guide for Interpretation of Gasses Generated in Silicone-Immersed Transformers

    200512/31/2010

    Approved

    D3a - approved by RevCom on 9/21/05.Published 3/10/2006

    Bartley(860) [email protected]

    W. H.

    Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 15 of 25

  • STANDARD

    PROJECTTITLE

    Pub YearRev Due Date

    PAR Issue Date

    PAR Expiration

    Standard StatusRemark

    10/01/2008Working Group Chair

    EmailPhone

    SubCommittee INSULATING FLUIDSR. K.

    (617) 393-3133

    [email protected] LadrogaC57.147

    PC57.147

    Guide for Acceptance and Maintenance of Natural Ester Fluids in Transformers 12/31/2013

    12/10/200312/31/2007

    Approved

    1st Ballot closed - 98% approval rating.Approved by Early Consideration May 14, 2008

    McShane(262) [email protected]

    C. P.

    IEEE 637 IEEE Guide for the Reclamation of Insulating Oil and Criteria for Its Use

    198512/31/2012

    Approved - Reaffirmed

    Reaffirmation approved by SA Board 9/27/2007

    Verner202 [email protected]

    J. A.

    Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 16 of 25

  • STANDARD

    PROJECTTITLE

    Pub YearRev Due Date

    PAR Issue Date

    PAR Expiration

    Standard StatusRemark

    10/01/2008Working Group Chair

    EmailPhone

    SubCommittee INSULATION LIFED. W.

    (610) 774-4686

    [email protected] Platts

    PC57.145

    Guide for the Definition of Thermal Duplicate Liquid-Immersed Distribution, Power, and Regulating Transformers

    0 06/25/199812/31/2004

    PAR Withdrawn

    Previously P1524 Modified PAR to expire in 2004PAR administratively withdrawn in December, 2004

    Beaster(601) [email protected]

    B. L.

    C57.100

    PC57.100

    IEEE Standard Test Procedure for Thermal Evaluation of Liquid-Immersed Distribution and Power Transformers

    199912/31/2008

    12/08/200412/31/2008

    Approved - Active PAR for Revision

    Requested PAR for revision on 10/18/2004. PAR approved 12/8/2004

    Wicks(804) [email protected]

    R. C.

    C57.119 IEEE Recommended Practice for Performing Temperature Rise Tests on Oil Immersed Power Transformers at Loads Beyond Nameplate Ratings

    200112/31/2013

    Approved

    Previously IEEE 838. Published 3/12/2002.Reaff approved 03/28/08

    Tuli(262) 547-0123 [email protected]

    S. C.

    C57.91

    PC57.91

    IEEE Guide for Loading Mineral-Oil-Immersed Transformers

    199512/31/2009

    05/02/200512/31/2009

    Approved - Active PAR for revision

    Combined C57.91-1981, C57.92-1981 & C57.115-1991Reaffirmation approved 6/23/2004New PAR for revision approved 5/2/2005.Revision to include Corr. 1

    Raymond(518) [email protected]

    T.

    C57.91-1995/Cor IEEE Guide for Loading Mineral-Oil-Immersed Transformers--Corrigendum 1

    200212/31/2007

    Approved - Active PAR for Revision

    In conjunction with C57.91 - reaffirmed in 6/2004. Currently under revision

    Pierce(706) [email protected]

    L. W.

    IEEE 1276 IEEE Guide for the Application of High-Temperature Insulation Materials in Liquid-Immersed Power Transformers

    199712/31/2011

    Approved

    Upgrade from trial use to full use on 3/30/2000Reaffirmation approved by SA Board in 3/30/2006

    Franchek(802) [email protected]

    M. A.

    IEEE 1538 IEEE Guide for Determination of Maximum Winding Temperature Rise in Liquid Filled Transformer

    200012/31/2010

    Approved

    Original approval in 2000. Reaffirmed in 2005.

    Platts(610) [email protected]

    D. W.

    Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 17 of 25

  • STANDARD

    PROJECTTITLE

    Pub YearRev Due Date

    PAR Issue Date

    PAR Expiration

    Standard StatusRemark

    10/01/2008Working Group Chair

    EmailPhone

    SubCommittee PERFORMANCE CHARACTERISTICSR. S.

    (314) 679-4803

    [email protected] Girgis

    PC57.133

    Guide for Short-Circuit Testing of Distribution and Power Transformers

    03/04/200512/31/2009

    Active PAR for revision of SC Test Guide

    New PAR for revision approved on 2/22/05.

    [email protected]

    M.

    PC57.142

    A Guide To Describe The Occurrence And Mitigation Of Switching Transients Induced By Transformer-Breaker Interaction

    05/07/200712/31/2011

    New Project - Active PAR Std under development

    PAR extension granted 9/23/2004 - new expiration @2006Balloted in 2005 -many negativesNew PAR approved 2007- for join sponsorship between Transformers Committee and Switchgear Committee.

    Degeneff(518) [email protected]

    R. C.

    PC57.149

    Guide for the Application and Interpretation of Frequency Response Analysis for Oil Immersed Transformers

    06/24/200412/31/2010

    New Project - Active PAR

    PAR approved by NesCom 6/23/2004PAR Extension Request Approved Sept 08 to 12/31/2010

    Sweetser(617) [email protected]

    C.L.

    PC57.153

    Transformer Paralleling Guide 03/27/200812/31/2012

    New Project - Active PAR

    PAR approved 3/27/08

    Jauch(727) [email protected]

    E.T.

    C57.105 IEEE Guide for Application of Transformer Connections in Three-Phase Distribution Systems

    197812/31/2013

    Approved

    Was to be administratively withdrawn in Dec., 2004. Reaffirmation ballot in Februay 2008.Reaffirmation approved 03/28/08

    Reitter(650) [email protected]

    G. J.

    C57.109 IEEE Guide for Liquid-Immersed Transformers Through-Fault-Current Duration

    199312/31/2013

    Approved

    Reaffirmation ballot invitation opened Oct 2005.Extension approved to 12/31/2007Reaff Recirc ballot closed 2/23/08. Reaff approved 03/28/08

    Patel(205) [email protected]

    B. K.

    C57.110

    PC57.110

    IEEE Recommended Practice for Establishing Transformer Capability When Supplying Nonsinusoidal Load Currents

    199812/31/2013

    11/18/200412/31/2008

    Approved

    PAR approved 11/18/2004. Balloted Sept 2007Recirc ballot closed 11-15-07 Revision approved 03/28/08 Revision published 8/15/08

    Marek(804) [email protected]

    R. P.

    Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 18 of 25

  • STANDARD

    PROJECTTITLE

    Pub YearRev Due Date

    PAR Issue Date

    PAR Expiration

    Standard StatusRemark

    10/01/2008Working Group Chair

    EmailPhone

    SubCommittee PERFORMANCE CHARACTERISTICSR. S.

    (314) 679-4803

    [email protected] GirgisC57.123

    PC57.123

    IEEE Guide for Transformer Loss Measurement 200212/31/2011

    02/20/200712/31/2011

    Approved - Active New PAR for revision

    Ref Std. IEEE 1098WG Chair record from IEEE shows R. GirgisRevision ballot pool formed. New Draft4 in ballot.Hold up due to Dual Logo process

    TeNyenhuis(519) [email protected]

    E.G.

    C57.18.10

    C57.18.10a

    IEEE Standard Practices and Requirements for Semiconductor Power Rectifier Transformers

    199812/31/2008

    03/04/200512/31/2009

    Approved

    Replaced C57.18-1964 pool cathode mercury-arc rectifiers.New PAR for Amendment approved 2/22/05Amendment approved March 28/08Reaffirmation Ballot Invitation opened 09/12/08

    Kennedy(716) [email protected]

    S. P.

    C57.21

    PC57.21

    IEEE Standard Requirements, Terminology, and Test Code for Shunt Reactors Rated Over 500 kVA

    199012/31/2013

    09/11/200312/31/2007

    Approved

    Reaffirmation approved on 6/23/2004.Balloted in 2007Recirc ballot closed 1/6/2008 Approved 03/21/08

    Dudley(416) [email protected]

    R. F.

    IEEE 32

    PC57.32

    IEEE Standard Requirements, Terminology, and Testing Procedures for Neutral Grounding Devices

    197212/31/2009

    12/11/200212/31/2009

    Approved - Active PAR for revision

    Dec. 2002 - Sponsor changed from PES/SPD to PES/TRPAR to revise PC57.32 approved 2002 to expire on 12/31/2006.PAR - expiration date extended to 12/31/2009

    Schappell(919) [email protected]

    S. M.

    Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 19 of 25

  • STANDARD

    PROJECTTITLE

    Pub YearRev Due Date

    PAR Issue Date

    PAR Expiration

    Standard StatusRemark

    10/01/2008Working Group Chair

    EmailPhone

    SubCommittee POWER TRANSFORMERST.

    (602) 236-8617

    [email protected] Lundquist

    PC57.12.10

    Standard Requirements for Liquid-Immersed Power Transformers

    1997 06/13/200212/31/2008

    New Project - Std under development

    Formerly NEMA/ANSI document.PAR extension request granted by NesCom to 12/31/2008.

    Arteaga(601)[email protected]

    J.

    PC57.143

    Guide for Application for Monitoring Equipment to Liquid-Immersed Transformers and Components

    03/21/200212/31/2010

    New Project - Active PAR Std under developemnt

    PAR extension requested approved on 12/5/2006.

    Chu(212) [email protected]

    D.

    PC57.148

    Standard for Control Cabinets for Power Transformers 02/27/200412/31/2008

    New Project - Active PAR Std under development

    PAR Extension Request granted in Sept 08, until 12/31/2010

    Watson(561) [email protected]

    J.D.

    PC57.150

    Guide for the Transportation of Large Power Transformers and Reactors

    11/18/200412/31/2008

    New Project - PAR approved in Nov. 2004

    PAR approved by NesCom in 11/18/2004NEEDS PAR EXTENSION

    Anderson(402) [email protected]

    G. W.

    PC57.17

    Standard Requirements for Arc Furnace Transformers 03/22/200712/31/2011

    NEW PAR for revision

    PAR for revision of old ANSI Std apporved Mar 22/08.

    Corsi(330) [email protected]

    D.

    C57.116 IEEE Guide for Transformers Directly Connected to Generators

    198912/31/2010

    Approved

    Reaffirmation approved in Dec. 2005

    Raymond(518) [email protected]

    T.

    C57.117 IEEE Guide for Reporting Failure Data for Power Transformers and Shunt Reactors on Electric Utility Power Systems

    198612/31/2006

    Approved

    Previously IEEE 786-1986, original approval date 6/19/1986Reaffirmation ballot pool formed. Need WG Chair

    Binder, Jr.(724) [email protected]

    W. B.

    C57.120 IEEE Loss Evaluation Guide for Power Transformers and Reactors

    199112/31/2011

    Approved

    Ref Std. 842Reaffirmation approved by RevCom 6/8/2006.

    Lau(604) [email protected]

    M. Y.

    C57.125 IEEE Guide for Failure Investigation, Documentation, and Analysis for Power Transformers and Shunt Reactors

    199112/31/2010

    Approved

    Std reaffirmed 5/10/2005

    Binder, Jr.(724) [email protected]

    W. B.

    Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 20 of 25

  • STANDARD

    PROJECTTITLE

    Pub YearRev Due Date

    PAR Issue Date

    PAR Expiration

    Standard StatusRemark

    10/01/2008Working Group Chair

    EmailPhone

    SubCommittee POWER TRANSFORMERST.

    (602) 236-8617

    [email protected] LundquistC57.131

    PC57.131

    IEEE Standard Requirements for Load Tap Changers 199512/31/2007

    05/15/200312/31/2009

    Approved - Active PAR for Revision

    PAR to Revise IEEE Std C57.131-1995PAR extension approved in 2007 until 12/31/2009

    Henning(262) [email protected]

    W. R.

    C57.135

    PC57.135

    IEEE Guide for the Application, Specification and Testing of Phase- Shifting Transformers

    200112/31/2011

    02/20/200712/31/2011

    Approved - Active PAR for Revision

    Approved for IEEE/IEC Dual Logo Dec. 2005 - IEC 62032 Ed. 1

    Sim(919) [email protected]

    H. J.

    C57.140 Evaluation and Reconditioning of Liquid Immersed Power Transformers

    200612/31/2010

    Approved

    Approved by RevCom 11/16/2006

    James(504) [email protected]

    R.I.

    C57.93

    PC57.93

    IEEE Guide for Installation of Liquid-Immersed Power Transformers

    200812/31/2013

    Approved

    Rev of ASA C57.93-1958, IEEE Std C57.12.11-1980, & C57.12.12-1980Previous version IEEE Std C57.93-1995, reaffirmed in 2001.RevCom approved on 12/4/07 - published 3/31/08

    Lau(604) [email protected]

    M. Y.

    IEEE 638

    P638

    IEEE Standard for Qualification of Class 1E Transformers for Nuclear Power Generating Stations

    199212/31/2011

    06/07/200712/31/2011

    Approved - Active - with errata dated 4/7/1999

    Reaffirmation approved by SA Board 3/30/2006.New PAR for revision approved 6/7/2007.

    Swinderman(724) [email protected]

    C.

    Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 21 of 25

  • STANDARD

    PROJECTTITLE

    Pub YearRev Due Date

    PAR Issue Date

    PAR Expiration

    Standard StatusRemark

    10/01/2008Working Group Chair

    EmailPhone

    SubCommittee STANDARDSW. H.

    (860) 722-5483

    [email protected] BartleyC57.12.00

    PC57.12.00

    IEEE Standard General Requirements For Liquid-Immersed Distribution, Power, and Regulating Transformers

    200612/31/2011

    06/07/200712/31/2011

    Approved - New PAR Active

    Previous revision approved September, 2006.Published 2/28/2007. New PAR approved on 6/7/2007 for 2008 revision; ballot pool formed; Ballot opened Sept 30, 2008

    Kim(626) [email protected]

    D.

    C57.12.70

    PC57.12.70

    IEEE Standard Terminal Markings and Connections for Distribution and Power Transformers

    200012/31/2011

    05/07/200712/31/2011

    Approved - Active PAR for Revision

    Reaffirmation approved by RevCom 3/30/2006.Published 3/16/2001.New PAR for revision approved by SA Board 5/7/2007

    Shull(417) [email protected]

    S.

    C57.12.80

    PC57.12.80

    IEEE Standard Terminology for Power and Distribution Transformers

    200212/31/2007

    11/10/200512/31/2009

    Approved - Active PAR

    Amendment PAR approved to add thermally upgraded definitionPAR for Amendment withdrawn June 2008 PAR for Revision approved (June 2008) until December 2012

    Raymond(518) [email protected]

    T.

    C57.12.90

    PC57.12.90

    IEEE Standard Test Code for Liquid-Immersed Distribution, Power, and Regulating Transformers

    200612/31/2011

    05/07/200712/31/2011

    Approved - New PAR active for next revision

    Previous revision approved 9/15/2006Published 2/15/2007New PAR active for 2008 revision; ballot pool formed. Ballot opened 9/30/08

    Antosz(412) [email protected]

    S.

    C57.144 Guide for Metric Conversion of Transformer Standards 200412/31/2009

    Approved

    Published 10/22/2004

    Olson(204) [email protected]

    T.

    IEEE 62

    PC57.152

    IEEE Guide for Diagnostic Field Testing of Power Apparatus - Part 1: Oil Filled Power Transformers, Regulators, and Reactors

    199512/31/2010

    05/19/200812/31/2012

    Approved

    Reaffirmation was approved on 3/19/05.New WG formed to revise document on a continuous basis New PAR number assigned: PC57.152PAR approved 5/19/08

    Verner202 [email protected]

    J. A.

    Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 22 of 25

  • STANDARD

    PROJECTTITLE

    Pub YearRev Due Date

    PAR Issue Date

    PAR Expiration

    Standard StatusRemark

    10/01/2008Working Group Chair

    EmailPhone

    SubCommittee UNDERGROUND TR & NW PROTECTC. G.

    (847) 683-2145

    [email protected] NiemannC57.12.23

    PC57.12.23

    IEEE Standard for Underground Type, Self-Cooled, Single-Phase Distribution Transformers with Separable Insulated High-Voltage Connectors; High Voltage 25kV and Below; Low Voltage 600V and Below

    200212/31/2009

    03/04/200512/31/2009

    Approved - Active PAR for revision

    Published 8/8/06.Modified PAR approved (June '08) until December 2009

    Traut(859) [email protected]

    A.

    C57.12.24

    PC57.12.24

    Requirements for Transformers - Underground-Type, Three Phase Distribution Transformers: High Voltage (34 500 GrdY/19 920 V and Below) and Low Voltage (480V and Below, 2500 kVA and Smaller

    200012/31/2011

    02/20/200712/31/2011

    Standard withdrawn in 2001

    Existing standard withdrawn by IEEE on 1/15/2001. No longer endorsed by IEEE. New working group formed to address revision. PAR approved Feb 27 2007. Ballot launched Sept 9, 2008

    Termini(610) [email protected]

    G.

    C57.12.40

    PC57.12.40

    Standard for Requirements for Secondary Network Transformers - Subway and Vault Types (Liquid Immersed)

    200612/31/2011

    03/27/200712/31/2011

    Approved - New PAR for Revision Active

    D4 approved by RevCom 3/30/3006.Standard Published 9/15/2006.New PAR approved 3/27/2007

    Klaponski(204) [email protected]

    B.

    C57.12.44

    PC57.12.44

    IEEE Standard Requirements for Secondary Network Protectors

    200512/31/2010

    Approved

    PC57.12.44/D2.1 approved by RevCom in December 2005. Published 6/07/2006Previous revision in 2000.

    Mulkey(415) [email protected]

    D. H.

    C57.12.57

    NONE

    Requirements for Ventilated Dry-Type Network Transformers 2500 kVA and Below, Three-Phase with High Voltage 34 500 Voltas and Below, Low Voltage 216Y/125 and 480Y/125 Volts

    199212/31/2000

    Standard withdrawn in 2001

    Existing standard withdrawn by IEEE on 1/15/2001. No longer endorsed by IEEE. New working group formed to address revision. Need new PAR.

    Robinson(361) [email protected]

    A. L.

    Prepared by William Bartley, IEEE PE/TR Std. Coordinator Page 23 of 25

  • IEEE/PES Transformers Committee - Activity Organization ChartChair: Tom Prevost

    Vice Chair: J. Ed Smith Secretary: Bill Chiu Std. Coordinator: Bill Bartley

    INSTRUMENTJames E. Smith

    HVDC Converter Xfmrs & Smoothing Reactors

    Richard Dudley

    DRY TYPEChuck W. Johnson

    DISTRIBUTION Ken Hanus

    BUSHINGFred E. Elliott

    POWERTom Lundquist

    UG & NW ProtectorC. G. Niemann

    Gen. Req. of BushingsRev of C57.19.00

    Bushing App. GuideC57.19.100

    OH Dist. Xfmrs C57.12.20

    Wilks/Cooper

    Eqp Encl. Integrity - PadC57.12.28

    Elec Rpt of Test DataIEEE 1388/C57.12.37

    General Req.C57.12.01

    Req. & Test Code for HVDC Con. Xfmr

    C57.129

    Req. & Test Code for HVDC Smoothing

    ReactorsIEEE 1277

    Step Volt. RegulatorC57.15

    Thermal Eval.PC57.12.60

    Req for Inst. XfmrsC57.13

    Test Proc. For Inst. Xfmrs

    C57.13.2

    Test Req. for >= 115kVPC57.13.5

    Req. for Elect. Rev. MeteringC57.13.6

    Guide for MonitoringC57.143

    Directly Connected GSU

    C57.116 Reaffirmation

    Req. for Liq. Imm. Power Xfmrs

    C57.12.10

    Std. Req. for Sec. Network Xfmrs

    C57.12.40

    UG 3ph Dist Xfmr< 2500KVAC57.12.24

    Dry Type Air-Core ReactorsC57.16

    Performance Characteristics

    C57.19.01

    Req. & Testing of DC BushingsC57.19.03

    Req.for Vent. 500KVAPC57.12.51

    Req. for Sealed >500kVA

    PC57.12.52

    Thermal Eval. for Vented Dry-Type

    InsulationC57.12.56

    Transient AnalysisC57.12.58

    Dry-Type Through Fault Current Duration

    C57.12.59

    Thermal Eval. For Solid-Cast& Resin Encap

    InsulationC57.12.60

    Test CodeC57.12.91

    IEEE 683 - Class IEReaffirmation

    Phase-Shift XfmrsC57.135

    Eval & ReconditioningC57.140

    Std for Control CabinetC57.148

    Arc Furnace XfmrC57.17

    Installation & Maint GuideC57.93

    Vent Dry-Type Network Xfmrs

  • IEEE/PES Transformers Committee - Activity Organization ChartChair: Tom Prevost

    Vice Chair: J. Ed Smith Secretary: Bill Chiu Std. Coordinator: Bill Bartley

    Insulating Fluids Rick Ladroga

    Insulation LifeDon Platts

    Audible Sound & Vibration

    Jeewan Puri

    DIELECTRIC TESTLoren B. Wagenaar

    Performance CharacteristicRamsis Girgis

    StandardsWm. Bartley

    Req. & Test Code for Shunt Reactors

    >500kVA C57.21

    Semicon Rectifier XfmrsC57.18.10

    S. Kennedy

    App. Guide for Xfmr Connections

    C57.105 - Reaffirmation

    Sound Level AbatementC57.136

    Rev. to Impulse Test Guide

    C57.98 & C57.138

    Rev of Low Freq. TestsB. Poulin

    Detection of PD -Acoustic Emission

    C57.127

    DGA GuideC57.104

    Mineral OilC57.106

    Silicone OilC57.111

    DGA During Thermal Test

    C57.130

    Less Fammmable Hydro-Carbon Fluid

    C57.121

    Loading GuideC57.91

    T. Raymond

    TF Investigate Use of Furan Testing K. Haggerty

    Max. Wdg Temp RiseIEEE 1538

    Temp Rise Test Above NP RatingC57.119

    Test Procedure Thermal Eval

    C57.100R. Wickes

    Cont Rev of C57.12.00D. Kim

    Cont. Rev of C57.12.90S. Antosz

    Metric Conversion of Xfmr StdsC57.144

    TerminologyC57.12.80

    B. Chiu

    MeetingsGreg Anderson

    Through-Fault Current Duration C57.109

    Reaffirmation

    Non-Sinusoidal Load CurrentC57.110

    Xfmr Loss Measurement

    C57.123

    Short Circuit TestingPC57.133

    Mitigation of Switching Transients CB/Xfmr

    InteractionPC57.142

    App. Of High Temp InsulationIEEE 1276

    DGA in LTCC57.139

    Natural Ester FluidC57.147

    Reclamation of Insulating Oil

    IEEE 637

    DGA in SiliconeIEEE 1258/PC57.146

    Website DevelopmentS. McNelly

    Terminal Markings & Connections

    S. Schull C57.12.70

    Diagnostic Field Testing J. Verner

    IEEE C57.152 //(62)Neutral Grounding Devices

    IEEE32/PC57.32

    Educational DevelopmentK. Haggerty

    WG on DielectricTest Table

    P. Hopkinson

    Guide for Sound Level Measurement

    PC57.151

    TF for Ballot Comment Resolution

    TF - Temp Rise Test -C57.12.90, Clause 11

    P. Powell

    TF - IEEE-IEC Cross Reference

    J. Sim

    Revised by W. Bartley 9/19/08

    TF on Determination ofMoisture in Paper

    J. SimFRA GuidePC57.149

    PCS Rev to Test Code- 12.90

    PCS Rev. to Gen Req - 12.00

    S. Snyder

    TF on PD MeasurementC57.113

    Rev of Transient Voltage Test

    P. Riffon/P. Heinzig

    TF- External Dielectric Test Clearance

    Eric Davis

    TF- Special DielectricTest IssuesB. Forsyth

    Page 25 of 25