IEEE P802.3an Task Force (10GBASE-T) - IEEE-SA -...

35
IEEE P802.3an Task Force IEEE P802.3an Task Force (10GBASE (10GBASE - - T) T) Agenda and General Information Agenda and General Information San Antonio, TX November 16-18, 2004 Brad Booth, Task Force Chair

Transcript of IEEE P802.3an Task Force (10GBASE-T) - IEEE-SA -...

IEEE P802.3an Task Force IEEE P802.3an Task Force (10GBASE(10GBASE--T)T)

Agenda and General InformationAgenda and General Information

San Antonio, TXNovember 16-18, 2004

Brad Booth, Task Force Chair

November 2004 IEEE P802.3an Task Force 2

Please Put Cell Phones on Stun!!Please Put Cell Phones on Stun!!

November 2004 IEEE P802.3an Task Force 3

AgendaAgenda• Welcome• Recording Secretary:• Introductions• Approval of the Minutes• Goals for this Meeting• Reflector and Web• Ground Rules• IEEE

– Structure– Bylaws and Rules– Call for Patents– IEEE Standards Process

• Reports• Comment Resolution & Presentations• Future Meetings• Motion Madness

November 2004 IEEE P802.3an Task Force 4

Goals for this MeetingGoals for this Meeting

• Review of comments on Draft D1.1– Hear presentations related to comments

• Time permitting: Uncommented presentations

• Adopt technical proposals to fill holes

November 2004 IEEE P802.3an Task Force 5

Reflector and WebReflector and Web• To subscribe to any of the 10GBASE-T reflectors send an

email to: [email protected]

with the following in the body of the message: subscribe stds-802-3-10GBT <your name>endsubscribe stds-802-3-10GBT-Modeling <your name>endsubscribe stds-802-3-10GBT-Cabling <your name>end

for example:subscribe stds-802-3-10GBT Brad Boothend

• P802.3an Task Force web page URL:http://www.ieee802.org/3/an/

November 2004 IEEE P802.3an Task Force 6

Private AreaPrivate Area• URL:

– www.ieee802.org/3/an/private/

• Access– Userid: 802.3an– Password: ********

• Write it down!!

November 2004 IEEE P802.3an Task Force 7

Ground RulesGround Rules• 802.3 Rules apply

– Foundation based upon Robert’s Rules of Order• Anyone in the room may speak• Anyone in the room may vote• RESPECT… give it, get it• NO product pitches• NO corporate pitches• NO prices!!!

– This includes costs, ASPs, etc. no matter what the currency

• NO restrictive notices

November 2004 IEEE P802.3an Task Force 8

IEEE StructureIEEE StructureIEEEIEEE

IEEE-SAStandards Association

IEEE-SAStandards Association

Standards BoardStandards Board IEEE 802Sponsor Group

IEEE 802Sponsor Group

NesComNew Stds. Committee

NesComNew Stds. Committee

RevComReview Committee

RevComReview Committee

IEEE 802.3Working Group

IEEE 802.3Working Group

IEEE P802.3anTask Force

IEEE P802.3anTask Force

November 2004 IEEE P802.3an Task Force 9

Bylaws and RulesBylaws and Rules• Bylaws of the IEEE Standards Association (IEEE-

SA):http://standards.ieee.org/sa/sa-bylaws.pdf

• Bylaws of the IEEE-SA Standards Board:http://standards.ieee.org/guides/bylaws/sb-bylaws.pdf

• IEEE LAN/MAN Standards Committee (LMSC) Operating Rules:

http://www.ieee802.org/rules.pdf

• IEEE 802.3 Working Group Operating Rules:http://www.ieee802.org/3/rules/

November 2004 IEEE P802.3an Task Force 10

6. Patents

IEEE standards may include the known use of essential patents and patent applications provided the IEEE receives assurance from the patent holder or applicant with respect to patents whose infringement is, or in the case of patent applications, potential future infringement the applicant asserts will be, unavoidable in a compliant implementation of either mandatory or optional portions of the standard [essential patents]. This assurance shall be provided without coercion and prior to approval of the standard (or reaffirmation when a patent or patent application becomes known after initial approval of the standard). This assurance shall be a letter that is in the form of either:

a) A general disclaimer to the effect that the patentee will not enforce any of its present or future patent(s) whose use would be required to implement either mandatory or optional portions of the proposed IEEE standard against any person or entity complying with the standard; or

b) A statement that a license for such implementation will be made available without compensation or under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair discrimination.

This assurance shall apply, at a minimum, from the date of the standard's approval to the date of the standard's withdrawal and is irrevocable during that period.

IEEEIEEE--SA Standards Board BylawsSA Standards Board Bylaws on Patents in Standardson Patents in Standards

Approved by IEEE-SA Standards Board – March 2003 (Revised February 2004)

November 2004 IEEE P802.3an Task Force 11

Inappropriate Topics for IEEE WG MeetingsInappropriate Topics for IEEE WG Meetings

• Don’t discuss licensing terms or conditions

• Don’t discuss product pricing, territorial restrictions or market share

• Don’t discuss ongoing litigation or threatened litigation

• Don’t be silent if inappropriate topics are discussed… do formally object.

If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at [email protected] or visit http://standards.ieee.org/board/pat/index.html

Approved by IEEE-SA Standards Board – March 2003 (Revised February 2004

November 2004 IEEE P802.3an Task Force 12

IEEE Standards ProcessIEEE Standards ProcessIdea

Call forInterest

802.3FormSG

RIP

802SEC Form

SG

Study GroupMeetings

802.3Approve

No

Yes

RIP

RIP 802 SECApprove

NesComApprove

STBApprove

ApprovedPAR

RIP

RIP

RIP

Yes

Yes

Yes

Yes

YesNo

No

No

No

No

PAR 5 Criteria

Objectives

November 2004 IEEE P802.3an Task Force 13

IEEE Standards Process (cont.)IEEE Standards Process (cont.)

Task ForceMeetings

ProposalsSelected

To802.3 WG

Ballot

Task ForceReview

TFReviewDone

Yes

Yes

Objectives

ApprovedPAR

No

D1.0

D1.(n+1)

No

No

Yes

A

D2.0

November 2004 IEEE P802.3an Task Force 14

IEEE Standards Process (cont.)IEEE Standards Process (cont.)

802.3 WGBallot

> 75 %

SECForward to

LMSC

802.3Forward to

LMSC

No

RIP

Yes

Yes

D3.0

No

A

A

Comments

Yes

No

D2.(n+1)

Yes

B

A

No

November 2004 IEEE P802.3an Task Force 15

IEEE Standards Process (cont.)IEEE Standards Process (cont.)

LMSCSponsor

Ballot

> 75 %

SECForward toRevCom

802.3Forward toRevCom

No

RIPYes

Yes

D3.n

No

B

B

Comments

Yes

No

D3.(n+1)

Yes

B

No

RevComReview

STBApproval

RevComApproval

Yes

No

Yes

B

NoRIP

Std

November 2004 IEEE P802.3an Task Force 16

P802.3an ObjectivesP802.3an Objectives• Preserve the 802.3/Ethernet frame format at the MAC Client

service interface• Preserve min. and max. frame size of current 802.3 Std.• Support full duplex operation only• Support star-wired local area networks using point-to-point

links and structured cabling topologies• Support a speed of 10.000 Gb/s at the MAC/PLS service

interface• Select copper media from ISO/IEC 11801:2002, with any

appropriate augmentation to be developed through work of 802.3 in conjunction with SC25/WG3

• Support Clause 28 auto-negotiation• Support coexistence with 802.3af• To not support 802.3ah (EFM) OAM unidirectional operation• Meet CISPR/FCC Class A

November 2004 IEEE P802.3an Task Force 17

P802.3an Objectives (cont.)P802.3an Objectives (cont.)• Support operation over 4-connector structured 4-pair,

twisted-pair copper cabling for all supported distances and Classes

• Define a single 10 Gb/s PHY that would support links of:– At least 100 m on four-pair Class F balanced copper cabling– At least 55 m to 100 m on four-pair Class E balanced copper

cabling• Support a BER of 10^-12 on all supported distances and

Classes

November 2004 IEEE P802.3an Task Force 18

P802.3an TimelineP802.3an Timeline

JULJUL NOVNOV MARMAR20042004

JULJUL NOVNOV MARMAR20052005

JULJUL NOVNOV MARMAR20062006

JULJUL

TutorialTutorial& CFI& CFI

802 SEC 802 SEC

NesComNesCom

D1.0D1.0

802.3 WG802.3 WGBallotBallot

D2.0D2.0

RevComRevCom

Std!Std!

LMSCLMSCSponsorSponsor

BallotBallot

NOVNOV20022002

MARMAR20032003

PARPARTaskTaskForceForcereviewreview

D3.0D3.0

Tech

nica

lM

anag

emen

t

FirstFirstTechnicalTechnical

PresentationPresentation BaselineProposalSelected

LastFeature

LastTech.

Change

November 2004 IEEE P802.3an Task Force 19

P802.3an Timeline MagnifiedP802.3an Timeline Magnified

NOVNOV DECDEC JANJAN20052005

FEBFEB MARMAR APRAPR MAYMAY JUNJUN JULJUL AUGAUG

Final Final Additions Additions to TF Draftto TF Draft

D1.0D1.0 D2.0D2.0

SEPSEP20042004

OCTOCT

Approval Approval for WG for WG BallotBallot

D1.1D1.1 D1.2D1.2 D1.3D1.3 D2.1D2.1 D2.2D2.2

D1.4D1.4 D1.5D1.5 D2.0D2.0

Interim Meeting Plenary Meeting

Final Final Additions Additions to TF Draftto TF Draft

Approval Approval for WG for WG BallotBallot

November 2004 IEEE P802.3an Task Force 20

ReportsReports• Liaison from ISO/IEC JTC 1 / SG 25 / WG 3

– No liaison letter from WG 3

• Liaison from TIA TR42– Presentation from Val Rybinski

• Editor’s report

November 2004 IEEE P802.3an Task Force 21

Comment Resolution/PresentationsComment Resolution/Presentations• Updates on 10GBase-T Magnetics; Thuyen Dinh• Startup protocol for 10GBASE-T; Katsutoshi Seki• Notes on a posteriori probability (APP) metrics for LDPC;

Raju Hormis• PAM12 LDPC-CRC Framing; Dariush Dabiri, Brett McClellan• 800 Ms/s PHY for 10GBASE-T: Coding, Framing, Mapping;

Sailesh Rao• PAM2 Training Frame Alignment Proposal; Brett McClellan• On Loop Timing and 10GBASE-T; Scott Powell• 10GBASE-T Modulation & Coding, Set of Fixed Precoders,

and Start-up; Gottfried Ungerboeck• Method of Transmitter Characterization for 800Mbaud

PAM12 System; Hiroshi Takatori• System SNR vs Pre-Coder Choise; Albert Vareljian• 10GBASE-T Tx PSD Mask Proposal; Chris Pagnanelli• Performance of N=4 THPs with Power Backoff; Glenn Golden

November 2004 IEEE P802.3an Task Force 22

Future MeetingsFuture Meetings

• January 2005 Interim:– Week of the 24th

– Vancouver, BC– Hyatt Regency– Host: IEEE 802

• March 2004 Plenary:– Week of the 14th– Atlanta, GA

November 2004 IEEE P802.3an Task Force 23

MotionsMotions

November 2004 IEEE P802.3an Task Force 24

TX Spec.TX Spec.• Move to maintain time domain transmitter pulse

specifications in the draft.• M: G. Zimmerman• S: G. Eisler• Technical (>=75%)• TF: Y: 10 N: 15 A: 19• 802.3: Y: 4 N: 12 A: 12• FAILS

• Time domain transmitter pulse specifications will be removed from the draft.

November 2004 IEEE P802.3an Task Force 25

Motion: Transmit Power LevelsMotion: Transmit Power Levels• 10GBASE-T adopt:

– 8 TX Power levels: PTmax, PTmax-2dB, PTmax-4dB, PTmax -6dB, PTmax -8dB, PTmax -10dB, PTmax -12dB, PTmax -14dB. With method of selection to be specified.

– Moved by: Scott Powell– Seconded by: Jose Tellado– Technical (>=75%)

• Task Force Members: Y: 40 N: 0 A: 9• PASSES

November 2004 IEEE P802.3an Task Force 26

Motion: StartMotion: Start--upup• 10GBASE-T adopt:

– Master and Slave training sequences based on polynomials presented in seki_2_0904.pdf. Finite segments thereof cyclically repeated, frame length tbd.

– Random seeds for Master and Slave training sequences determined during auto-negotiation

– The training sequences sent over the 4 pairs represent shifts of the base sequences generated by the above polynomial, as in clause 40 andseki_2_0904.pdf.

– The training sequence for pair A will every 256th bit flipped aligned with the PHY framing

– Info fields exchanged periodically during start-up to determine power levels and THP coefficient settings, communicate decision SNR, receiver status, and signal transition to data mode.

• Moved by: Katsutoshi Seki• Seconded by: Gottfried Ungerboeck• Technical (>=75%)• Task Force Members: Y: 38 N: 0 A: 6• PASSES

November 2004 IEEE P802.3an Task Force 27

Motion: Motion: BrickwallBrickwall• Move that the Task Force adopt a brickwall exclusion mask

in the TX PSD mask from 1 MHz to 330 MHz at -82 dBm (4 dB below) without power backoff.

• M: A. Vareljian• S: H. Scull• Technical (>=75%)• TF: Y: N: A:• 802.3:• PASSES/FAILS• Motion to postpone until the next meeting.• M: G. Zimmerman• S: T. Cobb• Procedural (>50%)• TF: Y: 27 N: 3 A: 17• Postponed

November 2004 IEEE P802.3an Task Force 28

Motion:Motion:• Move that the TF adopt the Measure Setup (slide

2) of takatori_1_1104.pdf as the baseline for transmitter characterization.

• M: A. Vareljian• S: H. Scull• Technical (>=75%)• TF: Y: 5 N: 16 A: 21• FAILS

November 2004 IEEE P802.3an Task Force 29

Motion: Augmented ObjectiveMotion: Augmented Objective• Move to remove the separate objective for 100 m

augmented Cat 6 approved at the September 2004 interim meeting since it is now incorporated in the present objectives.

• M: T. Cobb• S: A. Flatman• Technical (>=75%)• TF: Y: N: A: • PASSES/FAILS• Hostile amendment in blue. • M: L. Adriaenssens S: T. Cobb• TF: Y: 17 N: 10 A: 17 Technical (>=75%) FAILS

November 2004 IEEE P802.3an Task Force 30

Motion: Augmented ObjectiveMotion: Augmented Objective• Original motion:• Move to remove the separate objective for 100 m

augmented Cat 6 approved at the September 2004 interim meeting.

• M: T. Cobb• S: A. Flatman• Technical (>=75%)• TF: Y: 26 N: 0 A: 19• PASSES

November 2004 IEEE P802.3an Task Force 31

TIA Liaison Letter MotionTIA Liaison Letter Motion• Move that the Task Force approve and forward

the tia_1_1104 liaison letter to 802.3.

• M: H. Barrass• S: A. Flatman• Procedural (>50%)• TF Voters: Y: by voice N: A: • PASSES

November 2004 IEEE P802.3an Task Force 32

ISO/IEC Liaison Letter MotionISO/IEC Liaison Letter Motion• Move that the Task Force approve and forward

the iso_1_1104 liaison letter to 802.3.

• M: H. Barrass• S: V. Rybinski• Procedural (>50%)• TF Voters: Y: by voice N: A: • PASSES

November 2004 IEEE P802.3an Task Force 33

D1.2D1.2• Move that the Editor generate draft D1.2 for Task

Force review.

• M: J. Tellado• S: A. Flatman• Procedural (>50%)• TF: Y: by voice N: A:• PASSES

November 2004 IEEE P802.3an Task Force 34

AdjournAdjourn• Move to adjourn.• M: H. Barrass• S: J. Tellado• TF: Y: by voice N: A:• PASSES

November 2004 IEEE P802.3an Task Force 35

AdjournedAdjourned

Thank You!