Icure option roundabout
-
Upload
jing-deng -
Category
Engineering
-
view
368 -
download
0
Transcript of Icure option roundabout
Point Energy TechnologyPE Tech
Providing actionable insights that reduce your energy costs and optimise your manufacturing processes
Dr Jing DENG
[email protected]@qub.ac.uk
Team
Dr Jing Deng Prof Kang Li
Joseph Devlin
Ronan Cunningham Lead
Business mentor
Academic advisor
MarketingDr Haikuan WangHardware Engineer
Shaojun GanSoftware Engineer
Customer Pains
Manufacturing cost
Northern Ireland£9m energy bill870 employees
CLOSING DOWN
Materials 55%
Energy; 10%
Others; 35%
Customer Pains
1 2 3 4 5 6 7 8 9 10 11 120
20406080
100120140 Energy usage
Usa
ge (1
0k K
wh) Demand
capacity
Months
Value
Value
£1Saving on
energy
£10Additional
sale
Profit Margin 10%
£100K £1m
Energy Management System
Average potential savings - 35%
Scheduling Equipment Process10% 15% 10%
7% 9% 0.1%A very good solution
Point Energy solution
Current energy monitoring solution
1.22kwh 1.18kwh 1.58kwh
1 2 3
Energy Monitoring
Energy Saving
Component level energy monitoring1 2 3
Power Logging
RS485/RS422
RS485/RS422 RS232 Ethernet WIFI/
GPRS
Analog po rts
CAN
Digital IOs
Smart Data LoggerPower Supply
Power Logging
RS485/RS422
RS485/RS422
RS232 Ethernet WIFI/GPRS
Analog ports
CAN
Digit al IOs
Smart Data LoggerPower Supply
Power Logging
RS 485/RS 422
RS 485/RS422 RS 232 Etherne t
WIFI/GPRS
Analog ports
CAN
Digital IOs
Smart Data LoggerPower Supply
Potential saving
ComponentEnergy
Machine
1 2 3
Heater 1 0.15 0.14 0.16Heater 2 0.12 0.13 0.28Heater 3 0.12 0.12 0.11Heater 4 0.08 0.09 0.09Motor 1 0.4 0.35 0.56Motor 2 0.2 0.18 0.21Motor 3 0.15 0.17 0.17
Total 1.22 1.18 1.5821.8% 16.4% 13.6% 35.4%
What we do
Power Logging
RS485/RS422
RS485/RS422 RS232 Ethernet WIFI/
GPRS
Analo g po rts
CAN
Digital IOs
Smart Data LoggerPower Supply
• Component level energy and condition monitoring
• Machine and process optimization
• Reduced energy consumption• Reduced Maintenance• Reduce Machine Downtime• Increased productivity• Increased product quality
3R2IInsights
Actio
ns
What we do
Online identification
ToolControl signals
Heater 1
3.2kw
Heater 2
3.4kw
Heater 3
2.7kw
Heater 4
1.2kw
Heater 5
4.7kw
Heater 6
0.8kw
Motor 1
25kw
Motor 2
3kw
Motor 3
1.1kw
Total Power consumption
ICURe Journey
86 Interviews
Polymer processing
Foodprocessing
Steel making
Chemical processing
Car Making
IT and Automation
Energy monitoring
ICURe Journey
Additional values
Prevent unplanned machine shutdown
Component
level
monitoring
2-3%
Minimize product quality variations 1-2%
Early warning of potential failure 1-3%
Optimize process settings and reduce material waste (Lower cost and higher quality)
3-5%
Potential saving
Additional values
ISO 14067 - Carbon Footprint
Energy Audit
Current Market
10% Machine level energy monitoring
80% of machines are over 10 years old
Only a few new machines have component level energy monitoring (simple display, no logging)
Current Market
UK manufacturing industry£148 Billion
£7.4 Billion Total Energy cost 5%
£1.48 Billion 20% Saving
30% of Saving£444 Million
£22.2 Billion The world 50X
£222 Million 1% Share
Competitors
• Lack of detailed information• Lack of actionable insights• Saving is not significant• Cost is too high
How do customer pay
Initial fee (£500 per machine) + Monthly subscription (£50 per machine) (add-ons are available)
50 Machines
£700k Energy bill 20% Energy saving £140k Cost saving
£25k+ £30k /Year
0.4 year payback
Simple 5 years plan
SalesYear 1 Year 2 Year 3 Year 4 Year 5
Customer 10 30 80 150 300Sale £550,000.00 £1,400,000.00 £3,650,000.00 £6,250,000.00 £12,750,000.00
CostYear 1 Year 2 Year 3 Year 4 Year 5
Employee 5 10 15 25 50Wages £175,000.00 £380,000.00 £615,000.00 £1,050,000.00 £2,150,000.00
Hardware £50,000.00 £100,000.00 £250,000.00 £350,000.00 £750,000.00 Marketing £10,000.00 £15,000.00 £25,000.00 £40,000.00 £80,000.00
Others £20,000.00 £30,000.00 £50,000.00 £80,000.00 £12,000.00 Total £255,000.00 £525,000.00 £940,000.00 £1,520,000.00 £2,992,000.00 Profit £295,000.00 £875,000.00 £2,710,000.00 £4,730,000.00 £9,758,000.00
Next Step
• Form a spin-out• No more research and development is needed• Time is important• IP protection is to be considered
We can start the business nowTrials are being set up in 3 local companies
Thanks!