INTRODUCTION TO CONSTRUCTION INDUSTRY
FINAL PROJECT CONSTRUCTION PROJECT
FNBE MARCH INTAKE 2015
GROUP MEMBERS : TAN JIA SAN (0322406) NG JI YANN (
TUTOR : PN. HASMANIRA MOKHTAR
![Page 2: ICI FINAL PROJECT ( GROUP)](https://reader034.fdocuments.net/reader034/viewer/2022042717/55d373dbbb61eb08738b45f1/html5/thumbnails/2.jpg)
INTRODUCTION to the site
In this project, we have to work in a group of 2 and find a 50x50m2 empty land to iniZate a small construcZon project. Our site is located in Jalan PJS 8/15 , Selangor . There are residenZal, shop lots, hotels , BRT staZon and railway , educaZon area , and tress around the site . There is electric tower in our site , so we have to propose a project which is 3m away from the electric tower .
![Page 3: ICI FINAL PROJECT ( GROUP)](https://reader034.fdocuments.net/reader034/viewer/2022042717/55d373dbbb61eb08738b45f1/html5/thumbnails/3.jpg)
KEY PLAN
SITE LOCATION : Bandar Sunway , PJS 8/17 , 46150 Petaling Jaya , Selangor , Malaysia .
![Page 4: ICI FINAL PROJECT ( GROUP)](https://reader034.fdocuments.net/reader034/viewer/2022042717/55d373dbbb61eb08738b45f1/html5/thumbnails/4.jpg)
SITE CONTEXT
![Page 5: ICI FINAL PROJECT ( GROUP)](https://reader034.fdocuments.net/reader034/viewer/2022042717/55d373dbbb61eb08738b45f1/html5/thumbnails/5.jpg)
![Page 6: ICI FINAL PROJECT ( GROUP)](https://reader034.fdocuments.net/reader034/viewer/2022042717/55d373dbbb61eb08738b45f1/html5/thumbnails/6.jpg)
LEGEND
ResidenZal area
Commercial area
Car park area
Chosen site
![Page 7: ICI FINAL PROJECT ( GROUP)](https://reader034.fdocuments.net/reader034/viewer/2022042717/55d373dbbb61eb08738b45f1/html5/thumbnails/7.jpg)
Perduo Car Showroom
Supermarket
Hotel
Hindu Temple
Supermarket
Laundry
Petrol StaZon
Chruch
![Page 8: ICI FINAL PROJECT ( GROUP)](https://reader034.fdocuments.net/reader034/viewer/2022042717/55d373dbbb61eb08738b45f1/html5/thumbnails/8.jpg)
Residences
Residences
EducaZon
Klinik
Bank
Restorant
![Page 9: ICI FINAL PROJECT ( GROUP)](https://reader034.fdocuments.net/reader034/viewer/2022042717/55d373dbbb61eb08738b45f1/html5/thumbnails/9.jpg)
BRT NETWORK ( TRANSPORTATION )
![Page 10: ICI FINAL PROJECT ( GROUP)](https://reader034.fdocuments.net/reader034/viewer/2022042717/55d373dbbb61eb08738b45f1/html5/thumbnails/10.jpg)
BRT StaZon
BusStop StaZon
Bus Route
![Page 11: ICI FINAL PROJECT ( GROUP)](https://reader034.fdocuments.net/reader034/viewer/2022042717/55d373dbbb61eb08738b45f1/html5/thumbnails/11.jpg)
SITE ANALYSIS
![Page 12: ICI FINAL PROJECT ( GROUP)](https://reader034.fdocuments.net/reader034/viewer/2022042717/55d373dbbb61eb08738b45f1/html5/thumbnails/12.jpg)
Site Analysis
Our site is located in Jalan PJS 8/15 , Selangor . It is surrounded by residenZal area, commercial area , educaZon area. EXISTING STRUCTURE • There are two electric towers beside the site , and there is a small
guard house . SUNLIGHT • There is no roobop on it so the sun is sufficient throughout the day .
Wind DirecZon • It is windy and the wind direcZon comes from east south . CiculaZon • Our site is located next to the roads , residenZal area and
commercial area so the circulaZon of cars would be moving on the roads next to our site . There is also a new bus railway staZon around there . It is more convenient to people living around.