ICH Guideline Q9 - Quality Risk Management

35
ICH Q9: Quality Risk Management Muna Ali B.Pharm. Sahar Ansari M.Sc. Pharmaceutical Quality Control and Quality Assurance (QC/QA) Postgraduate Program Presented at Academy of Applied Pharmaceutical Science (AAPS), Toronto, ON 2013-2014

description

A presentation of the ICH guideline Q9 (Quality Risk Management). It discusses the basic risk management procedure, list of recognized risk management tools and its role in pharmaceutical industry.

Transcript of ICH Guideline Q9 - Quality Risk Management

Page 1: ICH Guideline Q9 - Quality Risk Management

ICH Q9: Quality Risk Management

Muna Ali B.Pharm.Sahar Ansari M.Sc.

Pharmaceutical Quality Control and Quality Assurance (QC/QA) Postgraduate Program

Presented at Academy of Applied Pharmaceutical Science (AAPS), Toronto, ON2013-2014

Page 2: ICH Guideline Q9 - Quality Risk Management

Risk ManagementThe systemic application of quality management policies,

procedures and practices to the tasks of assessing, controlling, communicating and reviewing risk.

Page 3: ICH Guideline Q9 - Quality Risk Management

Principles of Quality Risk Management

1. The evaluation of the risk to quality should be based on scientific knowledge and link to the protection of the patient

2. The level of effort, formality and documentation of the quality risk management process should be of the same level/measure of risk

Page 4: ICH Guideline Q9 - Quality Risk Management

Quality Risk Management Team

• Experts from the appropriate areas (e.g. quality unit, business development, engineering, regulatory affairs, production and sales)

• Individuals who are knowledgeable about the quality risk management process

Page 5: ICH Guideline Q9 - Quality Risk Management

Overview of a typical quality risk management process

Page 6: ICH Guideline Q9 - Quality Risk Management

Initiating a Quality Risk Management Process

• Define the problem and/or risk

• Assemble background information on the potential hazard, harm or human health impact

• Identify a leader and necessary resources

• Specify a timeline and appropriate level of decision making

Page 7: ICH Guideline Q9 - Quality Risk Management

Risk Assessment

A systemic process of organizing information to support a risk decision to be made within a risk management process

Page 8: ICH Guideline Q9 - Quality Risk Management

Risk Assessment

Three fundamental questions for clearly defining the risk(s)

1. What might go wrong?

2. What is the probability it will go wrong?

3. What are the consequences?

Page 9: ICH Guideline Q9 - Quality Risk Management

Risk Identification

The systemic use of information to identify potential sources of harm referring to the risk or problem

Page 10: ICH Guideline Q9 - Quality Risk Management

Risk Analysis

The estimation of the risk associated with the identified hazards. It is the qualitative or quantitative process of linking the probability of occurrence and severity of harm

Page 11: ICH Guideline Q9 - Quality Risk Management

Risk Evaluation

The comparison of the estimated risk to given risk criteria using a qualitative or quantitative scale to determine the significance of the risk

Page 12: ICH Guideline Q9 - Quality Risk Management

Risk Control

• Actions implementing risk management decisions

• The purpose is to reduce the risk to an acceptable level

• The amount of effort used in risk control should be proportional to the significance of risk

Page 13: ICH Guideline Q9 - Quality Risk Management

Risk Control

• Is the risk above an acceptable level?

• What can be done to reduce or eliminate risks?

• What is the appropriate balance between benefits, risks and resources?

• Are new risks introduced as a result of the idetified risks being controlled?

Page 14: ICH Guideline Q9 - Quality Risk Management

Risk Reduction

• Actions taken to lessen the probability of occurence severity of the harm

• Risk reduction measures might introduce new risks into the system or increase the significance of other risks

• Revisit risk assessment to identify and evaluate any possible change

Page 15: ICH Guideline Q9 - Quality Risk Management

Risk Acceptance

• The decision to accept the risk

• The best quality risk management might not entirely eliminate risk

• The quality risk is reduced to a specified acceptable level which will decided on a case-by-case basis

Page 16: ICH Guideline Q9 - Quality Risk Management

Risk Communication

• The sharing of information about risk and risk management between the decision maker and other stakeholders

• Parties could coomunicate at any stage of the process

• The output/result should be appropriately communicated and documented

Page 17: ICH Guideline Q9 - Quality Risk Management

Risk Review• Review or monitoring of

output/results of the risk management

• The process should be utilized for events (planned or unplanned events)

• The frequence of any review should be based on the level of risk

• Risk review might include reconsideration of risk acceptance decisions

Page 18: ICH Guideline Q9 - Quality Risk Management

List of recognized risk management tools

• Basic risk management facilitation methods

• Failure Mode Effects Analysis (FMEA)

• Failure Mode, Effects and Criticality Analysis (FMECA)

• Fault Tree Analysis (FTA)

• Hazard Analysis and Critical Control Points (HACCP)

• Hazard Operability Analysis (HAZOP)

• Preliminary Hazard Analysis (PHA)

• Risk ranking and filtering

• Supporting statistical tools

Page 19: ICH Guideline Q9 - Quality Risk Management

Basic Risk Management Facilitation Methods

Commonly used to structure risk management by organizing data and facilitating decision making

• Flowcharts

• Check sheets

• Process Mapping

• Cause and effect diagram (Ishikawa diagram)

Page 20: ICH Guideline Q9 - Quality Risk Management

Failure Mode Effect Analysis (FMEA)

• An evaluation of potential failure modes and their likely effect on outcomes and/or product performance

• It is a powerful tool for summarizing the important modes of failure, factors causing these failures and the effect of these failures

• Potential Areas of Use(s)

1. To prioritize risks and monitor effectiveness of risk control activities

2. To analyze manufacturing operation and its effect on product or processes

Page 21: ICH Guideline Q9 - Quality Risk Management

Failure Mode Effects Analysis (FMEA)

Page 22: ICH Guideline Q9 - Quality Risk Management

Failure Mode, Effects and Critically Analysis (FMECA)

• FMEA extended to incorporate an investigation of the degree of severity of the consequences, their probabilities of occurrence and their detectability

• Potential Areas of Use(s)

1. For failures and risks associated with manufacturing processes

2. The output of FMECA is a relative risk score for each failure mode and is used to rank the modes of failure

Page 23: ICH Guideline Q9 - Quality Risk Management

Failure Mode, Effects, and Critically Analysis (FMECA)

Page 24: ICH Guideline Q9 - Quality Risk Management

Fault Tree Analysis (FTA)

• It is an approach that assumes failures of the functionality of a product or process

• This tool can combine multiple causes of failure by identifying casual chains

• Potential Areas of Use(s)

1. To establish the pathway to the root cause of the failure

2. To investigate complaints and deviations in order to fully understand their root cause

3. For evaluating how multiple factors affect a given issue

4. Useful for risk assessment and in developing monitoring programs

Page 25: ICH Guideline Q9 - Quality Risk Management

Hazard Analysis and Critical Control Points (HACCP)

• Its is a structured approach that applies technical and scientific principles to analyze, evaluate, prevent and control the risk due to the design, development, production, and use of the products

• Potential Areas of Use(s)

1. To identify and manage risks associated with physical, chemical and biological hazards (including microbiological contamination)

2. Useful when product and process understanding is sufficiently comprehensive to support identification of critical control points

Page 26: ICH Guideline Q9 - Quality Risk Management

Hazard Analysis and Critical Control Points (HACCP)

Page 27: ICH Guideline Q9 - Quality Risk Management

Hazard Operability Analysis (HAZOP)

• HAZOP is based on a theory that assumes that risk events are caused by deviations from the design or operating intentions.

• Potential Areas of Use(s)

1. Applied to manufacturing processes

2. The output of a HAZOP analysis is a list of critical operations for risk management which facilitates regular monitoring of critical points in manufacturing process

Page 28: ICH Guideline Q9 - Quality Risk Management

Preliminary Hazard Analysis (PHA)

• It is a tool of analysis based on applying prior experience or knowledge of hazard or failure to identify future hazards that might cause harm

• Potential Area of Use(s)

1. Analyzing existing system or prioritizing hazards

2. Used early in the development of a project where there is little information on design, details or operating procedures

Page 29: ICH Guideline Q9 - Quality Risk Management

Preliminary Hazard Analysis (PHA)

Page 30: ICH Guideline Q9 - Quality Risk Management

Risk Ranking and Filtering

• It is a tool for comparing and ranking risks which requires the evaluation of multiple quantitative and qualitative factors for each risks

• This tool involves in breaking down a basic risk question into as many component as needed to capture factors involved in the risk

• Potential Areas of Use(s):

1. Used to prioritize manufacturing sites for inspection/audits by regulators or industry

2. Useful when management needs to evaluate both quantitatively-assessed risks and qualitatively-assessed risks within the same organizational framework

Page 31: ICH Guideline Q9 - Quality Risk Management

Supporting Statistical Tools

• Statistical tools can enable effective data assessment, aid in determining the significance of the data set(s) and facilitate more reliable decision making

• List of some of the principal statistical tools used in the pharmaceutical industry:

1. Control Charts

2. Control Charts with Arithmetic Average and Warning Limits

3. Histograms

4. Pareto Charts

5. Process Capability Analysis

Page 32: ICH Guideline Q9 - Quality Risk Management

Conclusion

• Quality Risk Management is a process that supports science-based and practical decisions when integrated into quality systems

• It provides documented and reproducible methods to accomplish steps to the quality risk management process

• Appropriate use of quality risk management does not eliminate industry's obligation to comply with regulatory requirements.

Page 33: ICH Guideline Q9 - Quality Risk Management

References• http://www.ich.org/fileadmin/Public_Web_Site/ICH_Products/Guidelines/Quality/Q9/Step4

/Q9_Guideline.pdf

• http://eurogtps.com/PROJECTOUTCOMES/EuroGTPHOTTOPICS/4RISKMANAGEMENT/44Relevantdefinitionsintheriskmanagementpr/tabid/246/Default.aspx

• http://www.fmea-fmeca.com/fmea-examples.html

• http://www.emeraldinsight.com/journals.htm?articleid=1463554

• http://www.qualitytrainingportal.com/resources/problem_solving/problem-solving_tools-fault_tree.htm

• http://www.beverageonline.com/doc/gary-ades-on-food-safety-haccp-haccp-haccp-pa-0004

• http://www.oshatrain.org/notes/2bnotes18.html

Page 34: ICH Guideline Q9 - Quality Risk Management

Questions?

Page 35: ICH Guideline Q9 - Quality Risk Management

Thank You