icfi.com © 2006 ICF International. All rights r Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure Authority Board of Directors November 10, 2009

Transcript of Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System...

Page 1: Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.

icfi.com © 2006 ICF International. All rights reserved.

Wyoming Collector and Transmission System Project

– Status Report

Presented to:

Wyoming Infrastructure Authority Board of Directors

November 10, 2009

Page 2: Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.

icfi.com2

Contents

• Background• Current Status• Going Forward

Page 3: Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.

icfi.com3

Background

Page 4: Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.

icfi.com4

Renewable Energy Development

• State Renewables Portfolio Standard (RPS)

– California 33% by 2020– Potential National RPS

• Production and Investment Tax Credits

• GHG Emission Reduction Legislation

Page 5: Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.

icfi.com5

Wyoming Proposed Transmission Lines

• 7 extra-high voltage• Issues: impact,

reliability, cost, and spacing of lines

• Spacing affects BLM ROW application processing

Page 6: Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.

icfi.com6

Transmission Line Separation

• WIA Board of Directors funds independent study to address issues

• Published August 2009

Page 7: Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.

icfi.com7

WGA and DOE - Western Renewable Energy Zones (WREZ)

• WREZ Phase I Report Published June 2009

• Includes Hub Map of Renewable Resource Potential

Page 8: Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.

icfi.com8

Western Area Power Administration and the ARRA

• TIP Purpose: “…constructing, financing, facilitating or studying construction of new or upgraded transmission facilities to deliver or facilitate delivery of renewable resources…

• Applications submitted April 2009

Page 9: Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.

icfi.com9

Wyoming Wind Collector and Transmission Task Force

• Develop a coordinated, staged, conceptual plan for a collector system

• Accommodate the interstate transmission lines and corridors required to collect and export these new resources

Page 10: Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.

icfi.com10

Current Status

Page 11: Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.

icfi.com11

Current Status

• WIA contracted with ICF to develop a conceptual design of a collector system

• One meeting and several conference calls held to date

• Scope of Work is complete and ICF began work in October

Page 12: Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.

icfi.com12

Scope of Work

Tasks1. Technical Analysis*1.1: Develop Analysis Scenarios*

1.2: Perform Reliability Analyses*

1.3: Update Energy Corridor Map

1.4: Estimate Costs*

1.5: Summarize the Collector System Design Alternatives*

2. Commercial Structure

3. Administrative/Outreach* Funded subtasks

StartOctober

2009

Task 1 Technical Analysis

Task 2 Commercial

Analysis

Task 3 Administrative

Support

Collector System Design

Alternatives

Page 13: Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.

icfi.com13

Current Effort – Subtasks 1.1 and 1.2

1.1 Develop Analysis Scenarios (in progress)

• Examining two wind resource development options • Analyzing two collector system design options: radial vs. networked

1.2 Perform Reliability Analysis (start 11/09)

• Performing engineering feasibility analysis to ensure basic security and reliability of conceptual design for a 15GW system

• Developing a starting point for evaluating collector system design options from a cost basis

Page 14: Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.

icfi.com14

Going Forward

Page 15: Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.

icfi.com15

Going Forward

1.4 Estimate Cost of Collector Design Options

• Estimate cost of design options• Rank options based on cost

1.5 Summary of Technical Analysis

• Identify collector system elements common to all scenarios• Discuss possible integration with existing grid• Discuss possible staged development of the collector system• Describe radial and networked design options and discuss trade-

offs

Page 16: Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.

icfi.com16

Going Forward (Cont’d.)

Considerations Outside Scope of Work• Integration of wind generation with other energy sources