ICE Development Objectives - 2011

57
ice.org.uk Registered charity number 210252 ICE Development Objectives - How to get the most from your experience 2011 Presented by Annie Silver MSc CEng MICE

description

ice ddos chatership

Transcript of ICE Development Objectives - 2011

  • ice.org.ukRegistered charity number 210252

    ICE Development Objectives -How to get the most from your experience2011

    Presented by Annie Silver MSc CEng MICE

  • Introduction

    Expectations Overview of Professional Qualification process Recording your experience

    the ideal world view

    Development Objectives detailed advice Examples Dos and Donts Beyond the Objectives. Questions about points I covered.. and points I didnt coverGeneral or Specific

  • Health Warning

  • Good News

  • Overview of Professional Qualification process

    Professional qualification route

    EducationIPD

    Training & Workplace Experience

    Professional Review

    ICE Membership

    Student GraduateProfessionally

    Qualified

    MICEChartered Engineer

    CEng

    Engineering Technician

    EngTech

    Incorporated Engineer

    IEng

  • Initial Professional Development

    Initial Professional Development (IPD) (from ICE 3001A)

    3.1 IPD comprises the acquisition and development of the special skills and professional approach you will need to practise as a Civil Engineer.

    3.2 should be structured to give you the necessary breadth of experience, as defined in ICEs Development Objectives (DO).

    3.3 All relevant knowledge and experience at any time, in any location, is valid when assessing IPD

  • Initial Professional Development

    Initial Professional Development (IPD) (from ICE 3001A)

    3.1 IPD comprises the acquisition and development of the special skills and professional approach you will need to practise as a Civil Engineer.

    3.2 should be structured to give you the necessary breadth of experience, as defined in ICEs Development Objectives (DO).

    3.3 All relevant knowledge and experience at any time, in any location, is valid when assessing IPD

  • Recording Your IPD

    Essential Components:Development Reports (Or similar, such as detailed diary entries, if

    not on a TA)Development ObjectivesCPD/DAP records3144 (if on a training agreement).

  • Getting the most from your experience

    The Ideal World ViewEvery three months. Write your Development Report Assign an Objective and a level (A, K, E or B) to everyparagraph (or page) Send report to DE/SCE and request a quarterly review meeting in 2 weeks At the QR meeting, discuss the report and objective claims and then agree which objectives can be signed off and at what level.

  • Development Report

    The scope was not accurately defined and so it was difficult to establish an accurate project plan. Therefore I produced a number of sub project plans which demonstrated the milestones and timescales of each key task (survey, analysis, design etc.). I also produced a typical weekly plan and a sample overall project plan to give an indication of the format and planning offered by X Ltd. The project plans was produced using Microsoft Project.

    Project Quality Plan: The project quality plan I produced for a previous project (see report Dec 05 to Feb 06) was to demonstrate the type quality plan that would be implemented on the job. Being heavily involved with the overall tender document has taught me a great deal. I learnt a lot about the overall tender process and was surprised at the level of detail required for a Tender submission. A specific format was even provided in the remit, they also request detailed financial information and details of previous jobs to ensure that X Ltd. would be in a position to undertake the work. It also demonstrated to me how departments can work together to produce a comprehensive tender document in a relatively short timescale. A meeting was called early on in the project and key personnel were given specific tasks, this aided the process greatly as all parties knew exactly what was involved and who was responsible. Unfortunately X Ltd. was unsuccessful in this Tender. We have requested feedback in order to assess the areas where we could improve.

    C1(E):

    D1(E),

  • Getting the most from your experience

    The Real World ViewSignificant previous unrecorded experience no development

    reports written, no objectives filled in.Dont try to fill in your objectives straight away

    1. Record previous experience by Writing development reports, or Bullet pointing all activities undertaken, project by project

    2. Assign an Objective and a level (A, K, E or B) to every paragraph (or page) or every bullet point

    3. Select the best examples of achievement at each level and record on the Development Objectives

    4. Discuss your experience and objective claims with your DE/SCE, previous line manager (MICE) or other suitable person and then agree objectives which can be signed off

  • Development Objectives

    ?What are the Development Objectives?Why are they necessary?Who should use them ?When should you start?How do you fill them in?What level do you record?Who signs them?Where can each objective be achieved.

  • What are the Development Objectives?

  • What are the Development Objectives?

    A

    Use your engineering * knowledge and understanding to make the most of existing and emerging technology

    A1 Broaden and deepen your engineering knowledge

    EngTech TMICEFor Example:- Identify limits of own personal knowledge and skills. Acquisition of engineering knowledge in chosen field of operations. Knowledge of engineering principles. Codes, standards and specifications.

    A1 Broaden and deepen your engineering * knowledge

    AMICE*MICE

    IEng MICE

    For Example:- Identify limits of own personal knowledge and skills. Acquisition of engineering knowledge in chosen field of operations. Knowledge of engineering principles. Codes, standards and specifications.

    CEng MICEFor Example:- Identify limits of own personal knowledge and skills. Acquisition of engineering knowledge in chosen field of operations. Knowledge of engineering principles. Codes, standards and specifications. Technological developments in the construction industry.

    Claim ofAchievement

    Achievement Rating

    EngTech TMICEAMICE*

    MICEIEng MICE

    CEng MICE

    Level A K E B

    Date achieved

  • What are the Development Objectives?

    15 objectives in 5 sections

    A

    Use your engineering * knowledge and understanding to make the most of existing and emerging technology

    B

    Apply appropriate theoretical and practical methods to the analysis and solution of engineering* problems

    C Provide technical and commercial management**

    D Demonstrate effective interpersonal skills

    E

    Demonstrate a personal commitment to professional standards, recognising obligations to society, the profession and the environment

    1. Engineering Knowledge & Understanding2. Engineering Application3. Management & Leadership4. Independent Judgement & Responsibility5. Commercial Ability6. Health, Safety & Welfare 7. Sustainable Development8. Interpersonal skills and Communication9. Professional Commitment

    Attributes for Professional Review (see 3001A, App A)

  • Content of the Objectives A1

  • Content of the Objectives B1, B2, B3

    B Apply appropriate theoretical and practical methods to the analysis and solution of engineering* problems

    B1 Identify engineering* problems and define possible solutions

    B2 Conduct appropriate research and analysis relating to engineering * problems

    B3 Implement solutions to problems, and evaluate their effectiveness

  • Content of the Objectives B1, B2, B3

    What is an Engineering Problem?How to: Design a new bridge Build a new bridge Repair an existing bridge Fill a gap in existing knowledge Deal with un-expected ground conditions

    etc.

  • Content of the Objectives B1, B2, B3

  • Content of the Objectives B1, B2, B3

  • Content of the Objectives B1, B2, B3

  • Content of the Objectives C1, C2, C3, C4, C5

    C - Provide technical and commercial management

    C1 Plan for effective project implementation

    C2 Control budgets, tasks, people and resources

    C3 Develop people to meet changing technical and managerial needs

    C4 Bring about continuous improvement through quality management

    C5 Manage contractual issues

  • Content of the Objectives C1, C2, C3, C4, C5

    What is a project?

    A project can be whatever you are responsible for eg a design, some research work, a feasibility study, a site-based project, etc.

    3005A Objective C1

  • Content of the Objectives D1, D2

    D - Demonstrate effective interpersonal skills

    D1 Communicate with others at all levels

    D2 Demonstrate personal and social skills

  • Content of the Objectives E1, E2, E3, E4

    E Demonstrate a personal commitment to professional standards, recognising obligations to society, the profession and the environment

    E1 Comply with relevant codes of conduct

    E2 Manage and apply safe systems of work

    E3 Contribute to sustainable development through engineering* activities

    E4 Manage your own continual professional development, and assist others

  • Why are they Necessary?

    3.2 IPD should be structured to give you the necessary breadth of experience, as defined in ICEs Development Objectives (3001)

    i.e. to check that you have had the right experience,

    and

    to identify any gaps in your experience

  • Who should use Development Objectives?

    Anyone needing to Record their experience for a Professional Review application, orCheck for gaps in their experience

    Including -Students on a work placement year,Students doing vacation work, Graduates on a TA, Graduates not on a TAEngineers with non-uk professional qualifications

  • When should you start recording your experience?

    As soon as you start working as a Civil Engineer -Student or Graduate,

    or

    NOW (whichever is sooner!)

  • Where can each objective be achieved?

    The Development Objectives have been drafted very broadly so that they can apply across the ever-widening range of activities that comprise civil engineering.

    This could include design, implementation and operation in the fields of research, construction, transportation, energy, the environment, and many other specialist disciplines.

    (Introduction to 3005A)

    Note: There are no exclusive site only or design office only objectives

  • Site Experience

    Appendix A (3001) - Attributes of Member (MICE, IEng MICE) and Member Chartered Civil Engineer (CEng MICE)

    A1.3 As a prospective professional civil engineer, in order to fulfill your obligation to society and to meet the requirements of Health, Safety and Welfare legislation you must have a sound knowledge and understanding of the construction process together with the activities connected to it.

  • Site Experience

    Appendix A (3001) - Attributes of Member (MICE, IEng MICE) and Member Chartered Civil Engineer (CEng MICE)

    A1.3 As a prospective professional civil engineer, in order to fulfill your obligation to society and to meet the requirements of Health, Safety and Welfare legislation you must have a sound knowledge and understanding of the construction process together with the activities connected to it. You must have an appreciation of and be able to identify and manage risks arising as a consequence of your actions.

  • Site Experience

    Appendix A (3001) - Attributes of Member (MICE, IEng MICE) and Member Chartered Civil Engineer (CEng MICE)

    A1.3 As a prospective professional civil engineer, in order to fulfill your obligation to society and to meet the requirements of Health, Safety and Welfare legislation you must have a sound knowledge and understanding of the construction process together with the activities connected to it. You must have an appreciation of and be able to identify and manage risks arising as a consequence of your actions. For those whose experience includes the construction process, site experience will ordinarily be required.

    See MGN 42 Site Experience Requirements

  • How do you complete the Development Objectives?

    A

    Use your engineering * knowledge and understanding to make the most of existing and emerging technology

    A1 Broaden and deepen your engineering knowledge

    EngTech TMICEFor Example:- Identify limits of own personal knowledge and skills. Acquisition of engineering knowledge in chosen field of operations. Knowledge of engineering principles. Codes, standards and specifications.

    A1 Broaden and deepen your engineering * knowledge

    AMICE*MICE

    IEng MICE

    For Example:- Identify limits of own personal knowledge and skills. Acquisition of engineering knowledge in chosen field of operations. Knowledge of engineering principles. Codes, standards and specifications.

    CEng MICEFor Example:- Identify limits of own personal knowledge and skills. Acquisition of engineering knowledge in chosen field of operations. Knowledge of engineering principles. Codes, standards and specifications. Technological developments in the construction industry.

    Claim ofAchievement

    Achievement Rating

    EngTech TMICEAMICE*

    MICEIEng MICE

    CEng MICE

    Level A K E B

    Date achieved

  • Development objectives level of achievement

    A - Appreciationappreciate why the DO is important and why it is done K Knowledge

    a basic understanding and knowledge of DO and how it is achieved

    E Experienceachieve DO working under supervision B aBility

    achieve DO several times in different situations, have competence to assist others and work without supervision.

  • Typical Entries

    DO E2 Manage and apply safe systems of work

    E May - Oct 2004 School Footbridge project: I monitored health and safety issues for construction and piling activities, with particular reference to the proximity of school children, peak traffic/pedestrian movements. I amended existing safety plan to include newly identified risks.

    B Jan March 2005 project: I identified particular high risk/non-standard procedures and ensured that a method statement was written for each operation and then communicated to the workforce by means of seminars [toolbox talks] prior to commencement. I set up site safety committees, where representatives of the workforce could express their concerns and provide valuable feedback.

    B May Nov 2005 Site: On commencement on site it was my responsibility to develop the construction stage Health & Safety Plan. I wrote a project Risk Assessment to identify the main hazards associated with the scheme and assess the risks involved.

  • Development objectives - evidence

    Valid

    Authentic

    Current

    Specific

    Sufficient

    - the evidence relates to the objective

    - the evidence relates to the candidates own activity

    - the evidence shows that the candidate is currently competent

    - the evidence relates to specific events not general processes

    - there is enough evidence of the right quality to demonstrate competency.

  • Typical Entries

    DO E2 Manage and apply safe systems of work

    E May - Oct 2004 School Footbridge project: I monitored health and safety issues for construction and piling activities, with particular reference to the proximity of school children, peak traffic/pedestrian movements. I amended existing safety plan to include newly identified risks.

    B Jan March 2005 project: I identified particular high risk/non-standard procedures and ensured that a method statement was written for each operation and then communicated to the workforce by means of seminars [toolbox talks] prior to commencement. I set up site safety committees, where representatives of the workforce could express their concerns and provide valuable feedback.

    B May Nov 2005 Site: On commencement on site it was my responsibility to develop the construction stage Health & Safety Plan. I wrote a project Risk Assessment to identify the main hazards associated with the scheme and assess the risks involved.

    1 at A 1-2 at K 4-5 at E 4-5 at B

  • For example CEng evidence:

    A September 2003: Developed awareness of DO and its importance on degree course K 15th October 2003: Completed Company Safety Induction Course 16th October 2003: Developed action plan to achieve objective (see Q.R. 1) E Mar-June 2004: Broomhill Wastewater Treatment Plant Extension. Carried out duties

    of site safety engineer and compiled weekly safety report. (See Q.R. 3 App. 2) E 20th August 2004: Broomhill Wastewater Treatment Plant Extension. Wrote Lifting Plan

    for erection of steel frame E 10th September 2005: New Mountain Treatment Plant. Wrote Method Statement for

    construction of holding tanks E 12th September 2005: New Mountain Treatment Plant. Wrote Risk Assessment for

    installation of roofing and cladding to Control Room. (See Q.R. 4 App. 1) B May-November 2005: Dover water transfer tunnel. Chaired site safety committee B December 2005: Manchester Glass Works. Instigated series of toolbox talks to

    operatives and method statement briefings to staff to improve communication of safety issues

    B January 2006: St Hilda Reservoir. Reviewed Risk Assessments for all current operations on site to identify main hazards and implemented several improvements

    B 14th July 2006: St Hilda Reservoir. Compiled, checked and up-dated Health & Safety File for handover to Client.

  • Who should sign them off?

    Last page of 3005A -

    In order of preference:

    1. SCE or DE (i.e. someone very familiar with the ICE requirements)

    2. MICE,

    3. Other recognised professional qualification

    4. And ,only if all else fails, yourself

  • How quickly can I complete them?

    This depends up on:

    The variety and depth of your experience The opportunities that you are given The opportunities that you take Your persistence in recording your experience regularly The support and encouragement of your mentor.

  • How quickly can I complete them?

    MGN 16 Work Placements

    Levels A and K in some DOs, should have been attained by all students by the end of two years study at College or University.

    Over a long (10 month) placement, .the student would be expected to complete most if not all Objectives to level (A) and many to level (K). By the end of the placement a number should be to level (E) and, Achievement of level (B) could well be possible in one or two Objectives, depending on the work undertaken,

    A student undertaking two or more vacation placements would be expected to complete all Objectives to level (A) and some to level (K), in particular the Health, Safety and Welfare (Objective E2).

    See Appendices A and B

  • How quickly can I complete them?

    MGN 16 Work Placements

    Levels A and K in some DOs, should have been attained by all students by the end of two years study at College or University.

    Over a long (10 month) placement, .the student would be expected to complete most if not all Objectives to level (A) and many to level (K). By the end of the placement a number should be to level (E) and, Achievement of level (B) could well be possible in one or two Objectives, depending on the work undertaken,

    A student undertaking two or more vacation placements would be expected to complete all Objectives to level (A) and some to level (K), in particular the Health, Safety and Welfare (Objective E2).

    See Appendices A and B

  • Appendix A Guide for students on a site placement

    Development Objective Suggested Examples Possible Achievement Rating

    Use your engineering knowledge and understanding to make the most of existing and emerging technology

    A1 Broaden and deepen your engineering knowledge Identify limits of own personal knowledge and skills. Acquisition of engineering knowledge in chosen field of operations. Knowledge of engineering principles. Codes, standards and specifications

    K

    Apply appropriate theoretical and practical methods to the analysis and solution of engineering* problems

    B1 Contribute to the identification of problems and the production of solutions

    Application of engineering principles. Possible solutions. Links to codes, standards and specifications. Specific solutions. K

    B2 Review and select appropriate techniques, procedures and methods to undertake tasks

    Link your knowledge of core engineering principles to codes, standards, specifications and tasks within your chosen field of operations. Consider HS&W, quality, cost, time, buildability, sustainability.

    K

    B3 Contribute to the implementation of solutions to problems HS&W, quality, cost, time, buildability, risk assessment. Link to standards and specifications E

    Provide technical and commercial management

    C1 Plan, organise and supervise resources to complete tasks Programmes. Plans. Method statements. Progress monitoring. Records. Instructions E

    C2 Control budgets, tasks, people and resources Management systems. Team working. Competences. Co-ordination of project activities:- programme, quality, cost, labour, other contractors, suppliers, plant/equipment, materials. Monitoring. Payment processes

    K

    C3 Take responsibility for the work of self and others Work effectively without close supervision. Lead by example. K

    C4 Contribute to quality systems Quality plans and systems. Maintain quality standards. Quality records. Recommend improvements. E

    C5 Demonstrate Commercial awareness Relationship between budget and cost. Record keeping. Instructions and variations. Forms of contract. Responsibilities of parties to a contract. Procurement methods. Contractual records.

    K

  • Appendix A Guide for students on a site placement

    Demonstrate effective interpersonal skills

    D1 Communicate with others Communicate effectively with others, orally, in writing, graphically. Contribute to meetings. Consult with others. Knowledge and use of IT. Reports. Drawings. Presentations. Method statements, toolbox talks. Exchange of information.

    E

    D2 Work effectively with others Develop good working relationships with colleagues, clients, suppliers and the public to achieve collective goals. Equal opportunities and diversity. Set an example for others to follow

    E

    Demonstrate a personal commitment to professional standards, recognising obligations to society, the profession and the environment

    E1 Comply with relevant codes of conduct Purpose of ICE History of ICE. Comply with ICE Codes of Conduct. Current developments and issues affecting the construction industry. Ethical and professional behaviour. Promotion of the construction industry.

    K

    E2 Manage and apply safe systems of work Identify and take responsibility for own obligations for health, safety and welfare issues. Implement health, safety and welfare systems. Current Health, Safety & Welfare codes and legislation. CDM Regulations. Risk assessments. Method statements. Recommend improvements. Have detailed knowledge of the hazards applicable to your field of work. Proactive approach to HS&W practice. Safety briefings. Apply risk management techniques appropriate to your field of work. Inductions. Prepare and review risk assessments and method statements.

    E

    E3 Contribute to sustainable development through engineering activities

    Comply with environmental legislation and best practice. Awareness of sustainability issues K

    E4 Manage your own continuing professional development

    Review of your own development needs. Development Action Plans. Record CPD activities (Personal Development Record). Evaluate CPD outcomes. Company appraisals. See ICE 3006.

    E

  • Appendix B Guide for students on a design placement or working in a consulting organisation

    Development Objective Suggested Examples Possible Achievement Rating

    Use your engineering knowledge and understanding to make the most of existing and emerging technology

    A1 Broaden and deepen your engineering knowledge Identify limits of own personal knowledge and skills. Acquisition of engineering knowledge in chosen field of operations. Knowledge of engineering principles. Codes, standards and specifications

    K

    Apply appropriate theoretical and practical methods to the analysis and solution of engineering* problems

    B1 Contribute to the identification of problems and the production of solutions

    Application of engineering principles. Possible solutions. Links to codes, standards and specifications. Specific solutions. E

    B2 Review and select appropriate techniques, procedures and methods to undertake tasks

    Link your knowledge of core engineering principles to codes, standards, specifications and tasks within your chosen field of operations. Consider HS&W, quality, cost, time, buildability, sustainability.

    K

    B3 Contribute to the implementation of solutions to problems HS&W, quality, cost, time, buildability, risk assessment. Link to standards and specifications E

    Provide technical and commercial management

    C1 Plan, organise and supervise resources to complete tasks Programmes. Plans. Progress monitoring. Records. Instructions E

    C2 Control budgets, tasks, people and resources Management systems. Team working. Competences. Co-ordination of project activities:- programme, quality, cost, staff, other consultants, suppliers. Monitoring. Payment processes

    K

    C3 Take responsibility for the work of self and others Work effectively without close supervision. Lead by example. K

    C4 Contribute to quality systems Quality plans and systems. Maintain quality standards. Quality records. Recommend improvements. E

    C5 Demonstrate Commercial awareness Relationship between budget and cost. Record keeping. Instructions and variations. Forms of contract. Responsibility of parties to a contract.

    A

  • Appendix B Guide for students on a design placement or working in a consulting organisation

    Demonstrate effective interpersonal skills

    D1 Communicate with others Communicate effectively with others, orally, in writing, graphically. Contribute to meetings. Consult with others. Knowledge and use of IT. Reports. Drawings. Presentations. Exchange of information.

    E

    D2 Work effectively with others Develop good working relationships with colleagues, clients, suppliers and the public to achieve collective goals. Equal opportunities and diversity. Set an example for others to follow

    E

    Demonstrate a personal commitment to professional standards, recognising obligations to society, the profession and the environment

    E1 Comply with relevant codes of conduct Purpose of ICE History of ICE. Comply with ICE Codes of Conduct. Current developments and issues affecting the construction industry. Ethical and professional behaviour. Promotion of the construction industry.

    K

    E2 Manage and apply safe systems of work Identify and take responsibility for own obligations for health, safety and welfare issues. Implement health, safety and welfare systems. Current Health, Safety & Welfare codes and legislation. CDM Regulations. Risk assessments. Method statements. Recommend improvements. Have detailed knowledge of the hazards applicable to your field of work. Proactive approach to HS&W practice. Safety briefings. Apply risk management techniques appropriate to your field of work. Prepare and review risk assessments.

    E

    E3 Contribute to sustainable development through engineering activities

    Comply with environmental legislation and best practice. Awareness of sustainability issues K

    E4 Manage your own continual professional development Review of your own development needs. Development Action Plans. Record CPD activities (Personal Development Record). Evaluate CPD outcomes. Company appraisals. See ICE 3006.

    E

  • Examples Good or Bad?

    E I have worked on several different projects that used different forms of contract. As such I have experienced the different ways that sites are managed under differing contracts

    E Although I have been fortunate enough not to have experienced first hand any serious hazards relating to my field of work, I have always paid close attention to safety briefings and take such events extremely seriously.

    E Jan March 2005 XXXXXX Roundabout Project:I was also responsible for carrying out all of the setting out for this project from kerb-lines to carriageway excavation and construction hence I was able to experience issues surrounding the buildability of the roundabout. In addition, I was responsible for checking the quality of work and ensuring that the project was built to specification.

    B Secondment to XXXXXXX Consultants - Design Engineer.Over a period of 6 months I was employed on many various designs, and I learnt all about structural design

    x

    x

    x

    x

  • Examples Good or Bad?

    B April July 2005 Section 278, XXXXXX Site: I carried out site-specific inductions on all employees starting work on the

    site. I was also charged with carrying out site inspections on a regular basis and

    took actions resulting from these inspections.

    B XXXXXX Consultants - Design Engineer.There were numerous approaches when considering the drainage layout for an office block car park solved by brainstorming and reviewing all possible solutions to problems. Thus enabling practical and economic solutions to be reviewed in depth. Allowing sketches to be presented, enabling an informed choice to be made

    E June Oct 2007 Pedestrianisation of xxxxx. Site Manager. I recorded labour, plant and materials utilised due to unexpected services

    and obstructions including delays ensued as a result. I also recorded delays caused due late supply of products from a nominated

    subcontractor

    B CDM Regulations Lecture, March 2005I attended this lecture as part of my training. As well as learning more about the regulations as they stand, I also learned about the new regulations due to come into force.

    x

    x

    x

  • Dos and Donts

    Do: Start recording your experience as soon as possible Be Specific Fill the objectives in regularly Get the objectives signed off regularly

    Dont: Give too little information Give too much information Use vague phrases such as I produced, I was involved with.., I was responsible for

  • What happens when I have completed them all?

    Training Review Completion Meeting, or Apply for a career appraisal

    Then a gap before Professional Review Ideally 6-12 months

    Time for Consolidation of experience, and Preparation for review.

  • EngTech

    Studying for your HND/HNC by day release?

    Your Development Objectives for EngTech could be complete by the time you finish your academic studies

  • Initial Professional Development Objectives

    ProfessionalCommitment

    Communication

    SustainableDevelopment

    H, S & W Commercial

    Independent Judgement

    Managementand

    Leadership

    Engineering Application

    Engineeringprinciples

    Trainee

  • Professional Review Candidate

    Engineeringprinciples

    Engineering Application

    Managementand

    Leadership

    Independent Judgement

    Commercial

    H, S & W

    SustainableDevelopment

    Communication

    ProfessionalCommitment

  • Hare or Tortoise?

  • Hare or Tortoise?

  • Hare or Tortoise?

  • ice.org.ukRegistered charity number 210252

    Thank You

    Annie Silver

    ICE Development Objectives -How to get the most from your experienceIntroductionHealth WarningGood NewsOverview of Professional Qualification processInitial Professional DevelopmentInitial Professional DevelopmentRecording Your IPDGetting the most from your experienceDevelopment ReportGetting the most from your experienceDevelopment ObjectivesWhat are the Development Objectives?What are the Development Objectives?What are the Development Objectives?Content of the Objectives A1Content of the Objectives B1, B2, B3Content of the Objectives B1, B2, B3Content of the Objectives B1, B2, B3Content of the Objectives B1, B2, B3Content of the Objectives B1, B2, B3Content of the Objectives C1, C2, C3, C4, C5Content of the Objectives C1, C2, C3, C4, C5Content of the Objectives D1, D2Content of the Objectives E1, E2, E3, E4Why are they Necessary?Who should use Development Objectives?When should you start recording your experience?Where can each objective be achieved?Site ExperienceSite ExperienceSite ExperienceHow do you complete the Development Objectives?Development objectives level of achievementTypical EntriesDevelopment objectives - evidenceTypical EntriesFor example CEng evidence:Who should sign them off?How quickly can I complete them?How quickly can I complete them?How quickly can I complete them?Appendix A Guide for students on a site placementAppendix A Guide for students on a site placementAppendix B Guide for students on a design placement or working in a consulting organisationAppendix B Guide for students on a design placement or working in a consulting organisationExamples Good or Bad?Examples Good or Bad?Dos and DontsWhat happens when I have completed them all?EngTechInitial Professional Development ObjectivesProfessional Review CandidateHare or Tortoise? Hare or Tortoise? Hare or Tortoise? Thank You