I wonder - norskoljeoggass.no€¢ Product range from Simple CT and WL equipment to full size Mobile...
Transcript of I wonder - norskoljeoggass.no€¢ Product range from Simple CT and WL equipment to full size Mobile...
DELIVERING EQUIPMENT EFFICIENCY FOR 25 YEARS
8
• Founded as JMC in 1989 – Bought by ODIM 2007 – Bought by Rolls Royce 2010 – Dwellop 2014
• Specializes in delivering innovative efficient well intervention and P&A equipment
• Product range from Simple CT and WL equipment to full size Mobile Drilling Units
• Highest focus on the overall cost
Dwellops contribution to a P&A operation sequence
10
RESERVOIR DIAGNOSTICS
•WIRELINE
PULL COMPLETION TUBING
•P&A UNIT
•WORK OVER UNIT
WELLBORE ISOLATION AND MILLING
•WORK OVER UNIT
CUT/PULL CONDUCTORS
•P&A UNIT
•WORK OVER UNIT
Dwellop P&A Unit
12
• Low day rates
• Low POB / 3-4 people
• Fully skid able
• Fast mobilization/demobilization
• Compact design
• Modularized to be lifted with
existing platform cranes
• Limited interface
Dwellop P&A Unit
13
• Cutting And pulling unit / Jack
• Rotation table on jack
• Optional top drive for milling
• NORSOK compliant remote
operated pipe handling
• Interface to mud system and
circulation setups
• Control cabin
acc. to S-002
Dwellop P&A Unit - Operations
14
• Plug & Abandonment w/ CT&WL
• Slot recovery w/ CT&WL
• Casing and conductor recovery
• Tripping pipe
Suitable for CT and WL operations
17
• The A-frame of the P&A unit is equipped for
rigging up the wire line lubricator stack for running
slick line
• Optional multiple pad eyes and extra winch for
running E-line operations or braided wires with
different sheave dimensions.
• CT jacking frame fits on
Dwellop Work Over Unit
• NORSOK pipe handling
• 250 MT Rack & pinion drive, highly accurate
• Top drive
• Cabin with 2 ea cyber chairs
• CE marked
• NORSOK built
• Onshore drilling at the moment
18Dwellop WOU.wmv
Work Over Unit (WOU) Possible Operations
• Work Over
• Plug & Abandonment
• Slot recovery
• Pulling/Cutting of old casing/tubing
• Set new casing/tubing
• ESP change-out
• Setting whip stock and drill shorter
side tracks.
• Wire line / coiled tubing work
20
Your alternatives for NCS platforms
Platform upgrade Jack up Work Over Unit P&A unit100 millions USD 300.000+USD/day 60.000 USD/day 25.000 USD/day
1 2 3 4
SIMOPS for P&A
23
• Lower day rates
• Lower POB on extra unit
• Skid able
• Fast mobilization/demobilization
• Compact design
• Modularized to be lifted with existing
platform cranes
• Reducing Platform campaign time
SIMOPS Increased efficiency
24
RESERVOIR DIAGNOSTICS
•WIRELINE
PULL COMPLETION TUBING
•P&A UNIT
•WORK OVER UNIT
WELLBORE ISOLATION AND MILLING
•WORK OVER UNIT
CUT/PULL CONDUCTORS
•P&A UNIT
•WORK OVER UNIT
Pull completion tubing
• SIMOPS RunningP&A UNIT And platform RIG
Cut/PullConductors
• SIMOPS RunningP&A UNIT And platform RIG
Cut/Pull Conductors
• SIMOPS RunningP&A UNIT And platform JACK UP
SIMOPSINCREASED
EFFICIENCY
SIMOPS Savings
Running SIMOP-Simultaneous Operations can save potential 8 days per well of
operation, and a 35 % cost reduction to the operation.
25
Operation method USD/DAYOne well
Days Cost (USD)
Alternative 1, Existing Drilling Rig 200 000 20 4 000 000
Alternative 2, Existing Drilling Rig 200 000 12 2 400 000
Alternative 2, Dwellop P&A Unit 25 000 8 200 000
Alternative 2, SUM cost SIMOPS 12 2 600 000
Savings 8 1 400 000
Dwellop cantilevered solutions
26CT Light Cantilever.wmv
Liftboat/cantilever for wellheads and shallow waters
(SNS)
• High mobility
• Fast rigup (pre rigged and tested)
• Low day rates