In aeply ^efer Tot -2-1 December 19. 1966 Phillips Petroleum Corapany Attentlont nr. Louis Hoover, I I I Poet Office Dc* 51107 Lafayette, Louis 1 aoa 70505 Gentlseen: Reference fs nade to your Initial Deve!opr.ont Operations Coordination Oocu&ient (OOCO) and Lnv1rof»eirUl Report received December 5# 1966, for Le*_«j OCS-0 6642, Block 40, Chaftoe? Area. This OOCD includes the activities proposed for the A platfona complex and Wells A-l and A-2. In accordance with 30 CFR 250.34, revised December 13, 1979, and Notice to Leasees and Operators No. 34-1. this DOCO is hereby determined to be conplete aod Is now being considered for approval. Tour control nuwbe* Is K-2616 *r.d L. too Id be referenced 1n yoer cowaun Ication and correspon<it?nce concerning t ' m OOCO. Sincerely yrxji-s, iijr, i- Jnd.) A. Dousid Giroir , 0. J . Bourgeois rjor Regional Supervisor Field Operat tons boci , Lease OCS-G 6642 (OPS-3-2) (FILE ROOM) ^CPS-3k4 w/Publlc Info. Cony of the DOCD ond ER (PUBLIC RECORDS) / AOGobc ttamw:12/18/66 Phillips Petroleum Co. OCS-G 6642 . \ . Office of Program Services DEC 22 J986 Information Sendee!

Transcript of i- Jnd.) A. Dousid Giroir - BSEE Data Center

Page 1: i- Jnd.) A. Dousid Giroir - BSEE Data Center

In aeply ^efer Tot -2-1 December 19. 1966

Phillips Petroleum Corapany Attentlont nr. Louis Hoover, I I I Poet Office Dc* 51107 Lafayette, Louis 1 aoa 70505

Gentlseen:

Reference fs nade to your Initial Deve!opr.ont Operations Coordination Oocu&ient (OOCO) and Lnv1rof»eirUl Report received December 5# 1966, for Le*_«j OCS-0 6642, Block 40, Chaftoe? Area. This OOCD includes the activities proposed for the A platfona complex and Wells A-l and A-2.

In accordance with 30 CFR 250.34, revised December 13, 1979, and Notice to Leasees and Operators No. 34-1. this DOCO is hereby determined to be conplete aod Is now being considered for approval.

Tour control nuwbe* Is K-2616 *r.d L. too Id be referenced 1n yoer cowaun Ication and correspon<it?nce concerning t 'm OOCO.

Sincerely yrxji-s,

iijr,i- Jnd.) A. Dousid Giroir

, 0. J . Bourgeois rjor Regional Supervisor

Field Operat tons

boci , Lease OCS-G 6642 (OPS-3-2) (FILE ROOM) ^CPS-3k4 w/Publlc Info. Cony of the DOCD ond ER (PUBLIC RECORDS)

/ AOGobc ttamw:12/18/66 Phillips Petroleum Co. OCS-G 6642 . \

. Office of Program Services

DEC 22 J986

Information Sendee!

Page 2: i- Jnd.) A. Dousid Giroir - BSEE Data Center

DEVELOPHENT OPERATIONS COORDINATION DOCUMENT

GULF OF MEXICO, CENTRAL

OFFSHORE LOUISIANA-MISSISSIPPI

SUBMITTED BY

PHILLIPS PETROLEUM COHPANY

LAFAYETTE, LOUISIANA

DECEMBER 1, 1986

Page 3: i- Jnd.) A. Dousid Giroir - BSEE Data Center

PHILLIPS PETROLEUM COMPANY LAFAVETTE. LOUISIANA 70505 1107 PO BOX 51107 TELEPHONE 318261 4100

EXPLORATION ANO PRODUCTION GROUP

I December 1, 1986

FILE: OCS-G-6842 'ease Chandeleur *;*ea P'ock 40 Gulf of Mexico C ntral Offshore Louis; aria/Ml ssi ssi ppl

RE: USDI, Minerals Management Service Development Operations Coordination Document

In i t i a l Plan

U. S. Department o the Interior Minerals Management Service FO-2-1 1420 South Clearview Parkway New Orleans, Louisiana 70123-2394

Attent ion: Mr. D. W. Solanas

Gentlemen:

Enclosed are eleven (11) copies of Phi l l ips Petroleum Company's proposed Development Operations Coordination Document for the captioned lease. Included in the Plan Is Phi l l ips Petroleum Company's Coastal Zone Management Consistency Cert i f icat ion for the Siates of Louisiana and Mississippi. Addi t ional ly, eleven (11) copies o. the Environmental Report are enclosed for your d ist r ibut ion as required pursuant to the provis ions of T i t le 30 CFR, Part 250.34 and NTL 80-6 of June 2, 1980. Final well numbers, lo-at ions, and depths w i l l be Included on the United States Departmen of the In ter ior , MMS Form 331C, Application f o r Permit to D r i l l , Deepen, or Plugback (APD). Other relevant Information to be provided therein shall Include casing, cement and mud programs, procedures to be followed throughout the d r i l l i n g of the wel l , Including testing of cement jobs, Insta l la t ion of casing, blowout prevent ion equipment, l i n e s , and other such data as the D i s t r i c t Supervisor may require.

As specified 1n the Document, Phi l l ips proposes to use a d r i l l i n g vessel such as the Chiles Gulfstream, a jack-up type d r i l l i n g vessel or equivalent. However, I t should be noted that the f inal decision to use any r ig 1s contingent upon several factors, e .g . , r ig comi tmen t( s) at the time t h i s Document 1s approved and the timely consummation of a contract with a d r i l l i ng contractor.

A complete r i g description and Inventory w i l l be submitted with the Application for Permit to D r i l l .

Page 4: i- Jnd.) A. Dousid Giroir - BSEE Data Center

U. S. Departnent of the Interior • Re: Chandeleur Area Block 40 Decenber 1, 1966 Page -2 -

Addi t ional ly , that Information presented herein judged exempt (by Ph i l l i ps ) from public disclosure under the Freedom of Information Act (5 U.S.C. 552) and Implementing Regulations (43 CFR, Part 2) has been marked "CONFIDENTIAL" or deleted.

This le t te r Is to be considered part of the Document.

P h i l l i p s respectfully so l i c i t s your timely approval of th is document and appreciates your consideration in th is matter. Should you require additional Information relevant to the Document, please contact the undersigned.

Very t ru ly yours,

LH,I I I /sd Enclosures

cc: Minerals Management Service New Orleans Dis t r ic t

Page 5: i- Jnd.) A. Dousid Giroir - BSEE Data Center

PHILLIPS PETROLEUM COMPANY

DEVELOPMENT OPERATIONS COORDINATION DOCUMENT

CHANDELEUR AREA BLOCK 40 OCS-G-6842

Development d r i l l i n g on these blocks w i l l be accomplished by

d r i l l i n g up to two (2) wel ls wi th a jack-up type d r i l l i n g MODU. A

t yp ica l MODU that would be employed for the proposed operations is the

Chiles Gulfstream MODU.

Should a well Indicate the presence of hydrocarbon bearing sands In

commercially paying quant i t ies, the well may be temporarily abandoned

according to the prov is ions of GOM-OCS Order No. 3 and any other

requirements as specified by the Dis t r ic t Supervisor. Addit ionally,

approved DOT, United States Coast Guard Navigational Aids shal l be

Instal led where required following temporary abandonment.

Upon completion of development d r i l l i n g , a platform may be

Instal led over the locatlon(s) for the development/prciuction phases. A

separate platform Installation application with appropriate documentation

would be submitted at that t ime.

Throughout the l i f e of the proposed project , a l l available

safeguards shall be u t i l i zed In an e f fo r t to prevent any possible damage

to the ecosystem.

D r i l l i ng act iv i t ies w i l l be conducted from a dock f a c i l i t y located

in Venice, Louisiana.

A geophysical report Is not Included in th is Document since I t was

or ig ina l ly f i l ed with the Plan of Exploration. Interpretations made at

that time remain unchanged.

Page 6: i- Jnd.) A. Dousid Giroir - BSEE Data Center

P h i l l i p s Petroleum Company Is an active member of Clean Gulf

^Associates (CGA). Should an upset occur at the proposed project s i te ,

the nearest CGA base 1s located at Grand Is le , Louisiana. The

jantlcipated response time from Grand Isle, Louisiana, Including loadout

of equipment, 1s approximately eighteen (18) hours. Phillips will be

operating under EPA Gulf of Mexico General Permit Number GMG280000,

effective 2 July 1986.

The following exhibits shall constitute the remainder of this

proposed Development Operations Coordination Document:

1. EXHIBIT I Louisiana/Mississippi CZM Consistency Certification.

2. EXHIBIT II A table Indicating the proposed well locations and

proposed total depth. Exact locations will be determined prior

to submittal of the MMS APD. A discussion of the proposed

timetable 1s also presented.

3. EXHIBIT I I I Vldnity map.

4. EXHIBIT IV General well location plat.

5. EXHIBIT V Structure maps.

6. EXHIBIT VI Typical production platform drawing.

7. EXHIBIT VII Typical MODU (3 legged jack-up).

8. EXHIBIT VII*I Oil Spill Contingency Plan Brief.

9. EXHIBIT IX Typical Drilling Mud Component Listing.

10. EXHIBIT X Listing of typical field equipment that would be

used when doing seismic surveys on the block.

11. EXHIBIT XI AQR.

12. EXHIBIT XII Environmental Report.

Page 7: i- Jnd.) A. Dousid Giroir - BSEE Data Center

1

• /

NOTES:

Note 1: Phillips Petroleum Company is a member of Clean Gulf

Associates.

Note 2: A Pollution Contingency Plan has been submitted and approved by

the Minerals Management Service pursuant to the provisions of

GOM-OCS Order No. 7.

Note 3: Phillips Petroleum Coinpany representative:

Mr. Louis Hoover, III

(318) 261-4137

Page 8: i- Jnd.) A. Dousid Giroir - BSEE Data Center

J

PHILLIPS PETROLEUN COMPANY OEVELOPMENT OPERATIONS COORDINATION DOCUMENT

CHANDELEUR AREA BLOCK 40 OCS-6-6842

1. WELL LOCATIONS

WELL NO. SURFACE LOCATION BH LOCATION PTVD

AVERAGE WATER DEPTH

A-l A-2

7438' & 6685' FSL 7438' & 6685' FSL

110' 110'

2. SHALLOW HAZARDS DISCUSSION AND CERTIFICATE

A-l/A-2: A review of the multi-sensor, high resolution engineering hazard survey (Odom Offshore) has revealed the absense of shallow hazards at the proposed locations of Wells Nos. A-l and A-2. Addit ional ly, no geologic, archeological or cu l tu ra l hazards w i l l be encountered, nor have any man-made structures or other magnetic hazards been Iden t i f i ed . I t Is further believed that d r i l l i n g or construction at these locations w i l l not Impact h is tor ic or pre-historic cultural resources.

CERTIFICATION

"PHILLIPS PETROLEUM COMPANY ce r t i f i e s that the proposed locations are free from any and a l l known shallow hazards".

3. PROPOSED TIMETABLE

Commencement of d r i l l i n g ac t i v i t i es are planned for February 1 , 1987. Two (2) locations have been chosen. These locations are based on current available data. The decision to d r i l l a l l proposed wells w i l l be based on that data obtained from the f i r s t we l l . I f operations do commence on February 1, 1987, the f i r s t well would be completed on or about March 2, 1987. Each well Is expected to require an average of t h i r t y (30) days to d r i l l . Therefore, 60 days would be required to d r i l l two (2) consecutive we l ls . Weather condit ions, approvals, and such things as problems encountered while d r i l l i n g may af fect the timetable in general.

4. MULTI-SENSOR SURVEY

This document was previously submitted wi n the i n i t i a l Plan of Exploration in December, 1984 and therefore i s omitted from th is submittal.

Page 9: i- Jnd.) A. Dousid Giroir - BSEE Data Center

DEVELOPMENT OPERATIONS COORDINATION DOCUMENT CHANDELEUR AREA BLOCK 40 Page -2-

5. TRANSPORTATION OF OIL AND GAS

Current plans for the transportation of produced hydrocarbons as a result of th is pro ject are to t i e Into an existing Texas Eastern 24" pipeline located approxi­mately 12 miles away. The pipeline is located in Main Pass Block 94. The proposed l ine from the platform to the t i e - i n point is anticipated to be an 8 5/8" gas sales pipel ine. Tie-in point has not been determined.

6. FACILITIES

I t 1s proposed to ins ta l l a jack-up production platform with gas processing f a c i l i t i e s and l i v ing quarters. The f a c i l i t i e s w i l l be capable of handling 30 MMCFGPD, 450 BCPD and 3000 BWPD. A bridge w i l l be used to connect the jackup to the four s lot d r i l l i n g jacket and the flowlines from the wellheads w i l l be connected to the manifold on the jackup platform.

7. PRODUCTION RATES

Gas - 12 MMCFGPD 011 - 0 BPD Water - 0 BWPD

PHILLIPS reserves the r ight to terminate the proposed project should the results of the I n i t i a l well Indicate a lack of su f f i c ien t reserves to warrant further ac t i v i t y , and further reserve the r ight to abandon the lease without further ac t i v i t y .

Page 10: i- Jnd.) A. Dousid Giroir - BSEE Data Center

COASTAL ZONE MANAGEMENT CONSISTENCY CERTIFICATION

' VELOPMENT OPERATIONS COORDINATION DOCUMENT TYPE OF PLAN

CHANDELEUR AREA BLOCIC 40 AREA AND BLOCK

OCS-G-6842 LEASE NUMBER

"THE PROPOSED ACTIVITIES DESCRIBED IN DETAIL IN THIS PLAN COMPLY WIlH

LOUISIANA'S ANO MISSISSIPPI'S APPROVED COASTAL ZONE MANAGEMENT PROGRAM

AND HILL BE COMPLETED IN A MANNER CONSISTENT WITH SUCH PROGRAM."

PHILLIPS PETROLEUM COMPANY LESSEE OR OPERATOR

J CERTIFYING OFFICIAL

DATE

Page 11: i- Jnd.) A. Dousid Giroir - BSEE Data Center

3 9

• H U N CAH TO*

V I C I N I T Y MAP •30 Ml

34 CM

X

v • 396. oee.os

PHILLIPS PETROLEUM CO. O.CS. - 6-6042

40

A 2

CHANi<»LEUR AREA y * 381.330.00' MAIN PASS A R E A

60

41

VICINITY PLAT « 2 . •ooo r t

S C A L C

PROPOSED MINERAL DEVELOPMENT

CHANDELEUR AREA G U L F OF M E X I C O

APPLICATION BY NOVEMBER 10.1986

PHILLIPS PETROLEUM CO. L A F A Y E T T E . LA.

Page 12: i- Jnd.) A. Dousid Giroir - BSEE Data Center

3 9

PHILLIPS PETROLEUM CC

O. .C S. - 6-6842

B L K . 4 0

A l T V O 4V0C" A - 2 Y .VT S iOO'

A i A - 2 WEST 7 4 3 8 '

x !

CHANDELEUR AREA

MAIM PASS A R E A 60

PUbLiC INFORMATION

PLAT '

Prepared By I John E. Chonct 8> A M O C : c o t , lnc

P H I L L I P S PETROLEUM COMPANY

DEVELOPMENT OPERA IONS

COORDINATION DOCUMENT

PROPOSED LOG*. "IONS

CHANDELEUR AREA

3C0'_t . l" s ? 0 0 0 * 11 /10 /16

Page 13: i- Jnd.) A. Dousid Giroir - BSEE Data Center
Page 14: i- Jnd.) A. Dousid Giroir - BSEE Data Center
Page 15: i- Jnd.) A. Dousid Giroir - BSEE Data Center

TYPICAL THREE LEGGED 5EW-ELEVATING MOBILE RIG

Page 16: i- Jnd.) A. Dousid Giroir - BSEE Data Center

AgRMDXX VX

I . TYPICAI INVENTORY OF A SEU i- EVATING DRILLING UNIT

1) D*-two rks:

2) Derrick:

j ) Substructure:

4) Rotary and Traveling Equipment:

5!» Mid Pumps (2):

6) Power Plane:

7) Hlotioit Preventers:

8> Choke Manifold:

9) PvAipe, mud exing:

10) Mud Cleaning Equipment*. *

National 1320UE, 1 3/8" dril l ing l ine, driven by tvo (2) Ct 75 DC electric motors.

Pyvam.'.f*, 147* x 30* * 30* cantilever mast. Nominal hook load capacity 1,330,000 lbs.

54' x 32* x 8'. Combination load capacity, hook and setback -1,000,000 lbs.

National C-375 . ;?<eary. 37 1/2" table opeining. National 660-K-1 7 bloek: 500 ton capacity. National H-500 hr* 500 ton capacity. National P-500 «.*ivel, 500 con capacity.

National 12-?-:60 rlplex; driven by two (2) G.B. 752 DC sle-.tri - motors.

Two (2) EMD 16-',45~S8 DloMl Engine, 1650 HP Three (3) AC Generators, 1500 KW each. Rose-Hill SCt System.

One (1) 13 5/8" - 10000, Cameron, Type "\T, Single Gate Sam Presenter.

One ( i ) 13 S/8T - 10000, Cameron, Type "IT, Double Gate Raa Preventer.

One (1) 13 S/8" - 5000, Shaffer, Spherical, Annular Prever er.

One (1) 21 1/4* - 2000 Shaffer, Spherical, 4*«umr Prove .er.

Two (2) Adjustable choke, Cameron, Type B-2. One (1) adjustable choke, Swaco, super. One (1) Positive choke, Cameron.

All .'lokes trimmed for h2S service.

Two (2) Centrifugal, 6" x 8", Mission. Capacity 500 GPM eaeh

One (1) Shale Shaker Ono (1) Desalter, Demco mod. MD416H, tf/16-4" cones. One (1) Desalter, Demco, mod. KD86V, w/6-8" cones. One (1) Degasser, Sweco.

Page 17: i- Jnd.) A. Dousid Giroir - BSEE Data Center

Appendix VI i

! 11) Cementing Unit;

12) Logging Unit:

13) Crane9:

14) Lifeboats:

15) Heliport:

16) Quarters:

17) Crew:

One (1) Halliburton, HT-400 Skid-Mounted Unie.

One (1) Schlumberger Wireline Unit.

Three (3) Le Tourneau PC-120-AS Cranes, with 100' Booms. Rate SO Ton at 20' Radius.

Three (3) Capsules9 28 man, Brucker. One (I) Life Raft, 20 man, inflatable.

Mounted on starboard side. Designed to fu l f i l l Government requirements for worldwide operation of Sikorsky 561 helicopters.

Accommodations for + 90 men, galley and messing facilities.

Toolpusher 2 Drilling crew, 5 man 2 Mechanic 1 Electrician 1 Welder 1 Crane Operator/Roustabout Foreman 1

Roustabouts 4 Barge Master 1 Storekeeper 1 Commissary Crew 1

2-

Page 18: i- Jnd.) A. Dousid Giroir - BSEE Data Center

OIL SPILL CONTINGENT PLAN

Pursuant to MMS OCS Order No. 7 (Pol lut ion Control and Waste Disposal) , P h i l l i p s O i l Company has an approved O i l S p i l l Contingency Plan on f i l e with the MMS. This Plan provides s p e c i f i c information for n o t i f i c a t i o n and action procedures i n the event a s p i l l s i tuat ion occurs in the Gulf of Mexico.

Action and n o t i f i c a t i o n procedures are s p e c i f i e d in the Plan for varying degrees of response depending on the s i z e and nature of the s p i l l . N o t i f i c a t i o n and reporting procedures include s tate and federal agency requirements and emergency n o t i f i c a t i o n telephone numbers. Action procedures are s p e c i f i e d to include r e s p o n s i b i l i t y , s p i l l containment and cleanup, equipment and materia l , operat ing personnel, communication, and Offshore O i l S p i l l Task f o r c e .

P h i l l i p s O i l Company i s a member of the CLEAN GULF ASSOCIATES, hereafter r e f e r r e d to as CGA. By reference, the CGA Operations Manual i s incorporated into and made a part of P h i l l i p s O i l Company's Offshore O i l S p i l l Contingency Plan . Equipment stored and maintained by CGA i s a v a i l a b l e should the need a r i s e . I n an emergency s i t u a t i o n , P h i l l i p s O i l Company w i l l c a l l for as much a s s i s t a n c e and addi t iona l equipment as necessary from a number of contractors who are located on the Gulf Coast that spec ia l i ze i n o i l s p i l l containment and cleanup. These con­trac tors , w i t h c a p a b i l i t i e s to include manpower, equipment and mater ia l , a r e l i s t e d in the Contingency P lan .

CGA equipment located at Grand I s l e , I n t r a c o a s t a l C i t y , Cameron, and Houma, L o u i s i a n a , can be u t i l i z e d and deployed from the CGA base or the P h i l l i p s O i l Company onshore support base located at Grand Cheniere or Fourchon Docks, Louis iana . A Fast Response Open Sea Skimmer System w i l l be used as the primary s p i l l con­tainment and cleanup equipment and i s located at the above mentioned CGA base l oca t ions . This i s a portable system designed for boat mounting. I t c o n s i s t s i n part of a f l oa t ing o i l boom, skimmer, outr igger , pump and storage tanks. The system i s designed to provide equipment capable of f a s t response to emer­gency s p i l l s i t u a t i o n s . Allowing 2 hours for loadout and 10 hours cru i s ing a t 10 knots r e s u l t s i n a general c a p a b i l i t y of being 100 miles o f f shore 12 hours a f t e r n o t i f i c a t i o n of a s p i l l . Maximum recovery w i t h the system i s 360 b a r r e l s of f l u i d . Trained operating personnel for the f a s t response skimmer and other CGA equipment w i l l be obtained f r c ^ a contractor .

Page 19: i- Jnd.) A. Dousid Giroir - BSEE Data Center

1

Drilling Mud Coaponenes Thae May Be Ueilized Offihore

IV.

produce Trade Haas ioa Nam*

I . weight Maeerlalt and Vlscosifisrs

MIL-SAA*

MILGEL1

SALT WATER CEL*

FLOSAL1

I I . Dispersants (Thinners)

UNI-CAL1

DESCO*

barlee

bentonite

attapulgite

asbeseoe fiber

lignosulfonate

modified tannin

I I I . Filtration Control Addltlvee

LIGCON*

CHEKTROLr-X

DRISCOSE*

DRISPACE

Chemicals

Causcic Soda

Soda Ash

Bicarb of Soda

MIL-LIME

V. Specialty Addielves

LD-8*

Aluminum Stsarsee

NOXYGEN"

NOXYGENT

causticized lignite

polymer-treated lignite

CMC

PAC

ea.sele

soda ash

bicarb

lime

defoamer

defoamer

oxygen scavenger

oxygen scavenger

Chemical Trade Saae

barium sulfate

benconlte

attapulgite clay

chrysoelle asbeseos

•odium lignosulfonate

sulso oethylated tannin + sodium di chromaee

NaOH ereaced lignite

polymer-treated lignice

sodium carboxy methyl cellulose

polyanionic cellulose derlvaeive

sodium hydroxide

sodium carbonate

sodlua bicarbonate

calclua hydroxide

non-hydrocarbon defoaaer

alualnua stearate

catalyzed, sodlua sulfite ?vd

catalyzed aaaonlua bisulfite solution

Page 20: i- Jnd.) A. Dousid Giroir - BSEE Data Center

I

Product Trad*. Saae ioa Rase Chenical Trade N'ame

LUBRI-SAL"

SUPER SHALE-TROL- 02

MILCHEXRMD

SOLTEX*

lubricant

Shale-Trol

dril l ing detergent

shale cootrol additive

Loss of Circulation Addleive*

HIL-PLUG* LCM

MILMICA* LC»

KWIK-SEAL LCM

DIASEAL-M* high water loss lose circulation squeeze aatl .

biodegradable, non-polluting vegetable oi l

Alualnua organic aclJ coaplez

drilling fluid detergent

modified hydrocarbon (noa polluting)

ground uie shells

flake alca

coabinacl' of granules, flakes, au fibers

non-ruizardous dlaeorles blend

Page 21: i- Jnd.) A. Dousid Giroir - BSEE Data Center

y*****"0- - - - - - &i<u pdii u e i s tne; wx j, De used when flg the seismic survey on this prospect w i l l be as follows:

crtw Typ* Boat Length 3oat Width Loaded Draft No. of Generators Size! of Generators Type} of Radios Number of Bunks Radar Gyro Auto-Pilot Fathometers Navigation

Boat Information

Marine-Streamer 115- to 135' 25' to 30' 10' 2 • 60 Xilowatts Single side band, VHF and CB 22 to 24 Deeea (usually two) Sperry Sperry Raytheon or Simrad (usually two) Lorac or Radist with a Western Sate l l i te Receiver- for Lane Coun'

Cable Information

MFG and Type Length

Number of Groups Group Interva l Group Array Sensitivity Number of Hydrophones 'umber of Depth Control Devices

Type of Depth Control Devices Number of Depth Detectors Towing Depth

Hestern Streamer 10,560* + 2-220' E l a s t i c Sec

tions + Leadin <8 - .... 220' 210' 4.2 mv/microbar 26 per group 10 Condep 6 30' to 35'

Recording System

Type Number of Amplifiers Type Amplifiers Normal Recording Filters Format Sample Rate* Record Length

Digital Data Systems 48 data channels, 6 to 12 auxcha Binary Gain or Floating Point Lo-cut-out, High-Cut 125 Hz Seg-A or Seg-C 2 Millisecond 6 Second

. Energy

Type

Number of Guns' Towing Depth No. of shots per group interval

Source

Aquapulse (Sleevf "eTcpIoSer using oxygen and propane)

6 25' to 30' 2

Page 22: i- Jnd.) A. Dousid Giroir - BSEE Data Center

Phi l l ips Petroleum Company Chandeleur Block 40

PROJECTED EMISSIONS FOR DEVELOPMENT OPERATIONS COORL NATION DOCUMENT PURSUANT TO 30 CFR 250.57 AIR QUALITY REGULATIONS

I . General Information

elation Description: Development/Production Owner/Operator: Phi l l ips Petroleum Company Address:?.0. Box 51107, Lafayette, LA. 70505-1107 Contact Person: Louis Hoover, Area Regulatory and Permit Analyst Location of Project:Chandeleur Block 40 (OCS-6842)

Operation Schedule DriiUng Production

Begin: February 1, 1987 Begin: Apri• 1, 1987 End: March 31,1987 End: Continuous Distance to Shoreline (mean high water Une): Twenty Miles

I I . Synops<s

The projected emissions derived as a result of th is review represent a maximum ( l i be ra l ) assessment for indicator pollutants. The findings of th is assessment Indicate that the proposed emissions herein are well below the exemption rates and pose no signi f icant Impact on the ambient a i r qual i ty of the onshore environment. Based on th is assessment, no further a i r quality review 1s required.

I I I . Projected Emissions

Platform Projected Emissions- Chandeleur Block 40

1987 1988+ Exmpt. 11utant tons/yr* tons/yr** Rate Status

CO 11.73 14.28 25051.4 Exempt S02 1.80 1.71 666.0 Exempt NOx 43.67 50.71 666.0 Exempt VOC 3.68 4.71 666.0 Exempt TSP 1.10 1.48 666.0 Exempt

•Based on 334 day period * Continuous through l i f e of f i e l d

Page 23: i- Jnd.) A. Dousid Giroir - BSEE Data Center

Service Base Projected Emissions

Pollutant 1987 1988+

tons/yr* tons/yr

co] SOt

2.72 0.39 6.84 0.52 0.08

3.69 0.07

11.47 0.80 0.09

NOx VOC TSP

•Based on 334 day period ** Continuous through l i f e of f i e l d

IV. Exemption Formula

The projected emissions from operations are to be compared with "exemption rules" for the fac i l i t y location. I f the amount of these projected emissions 1s les., than or equal to the emissions amount "EM for the a i r pol lutant, the f a c i l i t y i s exempt for that a i r pollutant from further air quality review.

The fol lowing formulas pursuant to 30 CFR Part 250 Sec. 250-57-1 (d)are used to determine exemption rates:

For CO; E-3400 D EXP 2/3 For TSP, S02, NOx, VOC: E-33.3D D* distance of the f ac i l i t y 1n statute miles from the closest onshore area

Based upon these exemption formulas, the following emission rates were computed for Chandeleur Bloclc 40 01 stance from nearest onshore area 1s twenty (20) statute miles.

Pollutant Exemption Rate (tons/year)

CO 25C1.4 S02 666.0 NOx 666.0 VOC 666.0 TSP 666.0

Page 24: i- Jnd.) A. Dousid Giroir - BSEE Data Center

V. Methodology i

Dri l l ing:) Horsepower/Hour Method 'Power generation factor 60 HP-hr/ f t , Reference #1 - / j . 86) prodijctlop: Horsepower'Hour Method (Pjwer generation factors Table 4.7 Reference #1 - pg. 94) Transportation Mooes: Boats-Horsepower/Hour Method - Reference #2 Helicopters - Landing/Take Off (LTO) cycle method - Reference 42

VI. References

1. EPA-450/3-77-026 June 1977 - "Atmospheric Emissions from Offshore 011 and Gas bevelopment and Production" pp.81-92

2. EPA Report AP-42 MCompilat1on or A i r Pollutant Emission Factors", 3rd Edition (August, 1977) pp. 116,125,127.

Page 25: i- Jnd.) A. Dousid Giroir - BSEE Data Center

EXHIBIT A j

] • Emission Factors Used in Calculations

Emission Factors for Dr i l l ing

Pollutant lb/hp-hr

CO .0042 S02 .0019 NOx .028 VOC .00095 TSP * •Not . u .a. ie from EPA publication

Emission Factors In Transportation Modes Helicopters

Pollutant (lb/eng1ne LTO cycle) *oats ( lb /^a l )

CO 5.7 .0598 S02 .18 * NOx .57 .41*6 VOC .52 .0226 TSP .25 • •Not available fror. EPA publication

Emisslc actors for Production

Pol'uUrit lb/hp-hr

X .00084 .>02 .00013 NOX .00311 VOC .00031 TSP .00011

Page 26: i- Jnd.) A. Dousid Giroir - BSEE Data Center

EXHIBIT B J

MlscelMneous Information

Dri l l ! ' -q: Totial Well Footage to be Dri l led - 9300 f t PeJlod - 60 days Supply Boats: 3000 Hp 4 hours waiting time: 4/wk d r i l l i n g ; 0/wk production Base: Venice, Louisiana

Jrew Boats: 2500 Hp 1 Hour Malting Time: 1/wk d r i l l i n g ; 5/wk production Base: Venice, Louisiana

Helicopters; 2 Engines 1 Trip Per Day: 7/wk d r i l l i n g ; 7/wk production Base: Venice, Louisiana

Page 27: i- Jnd.) A. Dousid Giroir - BSEE Data Center

I

ENVIRONMENTAL REPORT

FOR COASTAL ZONE MANAGEMENT CONSISTENCY DETERMINATION

DEVELOPMENT OPERATIONS COORDINATION DOCUMENT CHANDELEUR BLOCK 40

PHILLIPS PETROLEUM COMPANY LAFAYETTE, LOUISIANA

CONTACT PERSON:

LOUIS HOOVER, III AREA REGULATORY AND PERMIT ANALYST

P.O. BOX 51107 LAFAVtTTE, LOUISIANA 70505-1107

(318-261-4137)

NIVEMBER 17, \986

Prepared by: McClelland Engineers, Inc. 440 Industrial Parkway Laf ayette,Louisiana 70508

(318-235-3200)

Page 28: i- Jnd.) A. Dousid Giroir - BSEE Data Center

, TABLE OF CONTENTS

i I.DESCRIPTION OF THE PROPOSED ACTIVITY 1

/ A. Transportation Modes, Routes and Support Vessels 1

B. Support Base 2

C. New Support Facilities 7-

D. New or Unusual Technologies 2

E. Maps 3

F. Transportation of Oil and Gas 3

I I . DESCRIPTION )F THE AFFECTED ENVIRONMENT AND IMPACTS 4

A. Physical and Environmental 4

1. Commercial Fishing 4

2. Shipping 6

3. Recreation 6

4. Cultural Resources 7

5. Ecologically Sensitive Features 7

6. Existing Pipelines and Cables 8

7 Other Mlnera: Uses 8

8. Ocean Dumping Grounds . > » • 8

9. Endangered or Threatentd Species 9

B. Socio-economic 10

I I I . UNA VOIDABLE ADVERSE IMPACTS i l

IV. REFERENCES 13

V( APPENDIX

Coastal Zone Management Consistency Certification

Page 29: i- Jnd.) A. Dousid Giroir - BSEE Data Center

/' LIST OF MAPS

MAP #1

MAP #2

IA

2A

Page 30: i- Jnd.) A. Dousid Giroir - BSEE Data Center

I . DESCRIPTION OF THE PROPOSED ACTIVITY

The Phillips Petroleum Company proposes to conduct development, production and associated pipelines 1n support of production operations 1n the Chandeleur Block 40 area. Two wells will be drilled, one straight hole (Well A-l) and one directional well (Well A-2). Both wells will be dnlled from the same surface location. The approximate location of these activities 1s forty (40) statute miles off the Plaquemine Parish, Louisiana coast, (see Map # 1)

The surface locations of the development wells are as follows:

Well Site Surface Location Drilling Depth

A-l 6685'FSL & 7438'FEL 4200' TVD A-2 6685'FSL & 7438'FEL 5100' MTD

The proposed activities will be carried out and completed with the

guarantee of the following Items:

1. The best available ar.. safest technologies will be utilized throughout

the project. This Includes meeting all applicable requirements for equipment

types, general project layout, safety systems and equipment and monitoring

systems.

2. All operations will be covered by a MMS-approved oil spill contingency

plan.

3. A l l applicable Federal, State and local requirements regarding a i r

emissions and water quality and discharge for the proposed ac t i v i t i es , as well

as any other permit condit;nns, w i l l be tomp'Med wi th .

Page 31: i- Jnd.) A. Dousid Giroir - BSEE Data Center

S o

TEXAS

y y •rot

— —A * »0 l 1 ao 4ooii

'jzi::: rrr

I I I H H

-UiilnUUXAMICH

BI iaa axim

OCS Araaa Adjacent Tc Tht Statet of Atobama, Louisiana and Mississippi VICINITY MAP

A

Page 32: i- Jnd.) A. Dousid Giroir - BSEE Data Center

McClelland Engineers, Inc. November 17, 1986 Report No. 0286-2304 Page 2

A. Transportation Modes, Routes and Support Vessels:

* The proposed project w i l l u t i l i ze the Venice, Louisiana Service Base for

{supplies and transportation. Logistical support during d r i l l i n g w i l l be

(provided by one crewboat making one t r ip ' per week and one workboat making

four t r i p s per week. Aviation support w i l l require one helicopter making one

t r i p per day.

During production one crewboat will be needed making five trips per week. Helicopter support will require one trip per day.

Boat traffic to the rig/platform will depart Venice via the most 01rect route to the Gulf of Mexico, thence to Chandeleur Block 40. Helicopter flights will depart the Venice terminal following FAA specified clearance, thence via the most direct VFR, IFR flight paths to the platform.

B. Support Base

All support functions will be provided by the Venice, LA support base. The facility is currently manned at an adequate level to support the proposed activity. Therefore, no additional onshore employment will be generated as a result of this action.

C. New Suppor. . ar.i 1 ities

It has been determined in the Development Operations Coordination Document (DOCD) that the existing support facilities are adequate at this time to service the level of activity projected as a result of this project. Therefore, no new support facilities are required.

D. New or Unusual Technologies

No new or unusual technology will be utilized that may affect coastal waters.

Page 33: i- Jnd.) A. Dousid Giroir - BSEE Data Center

MAP 2

3 9

PHILLIPS PETROLEUM CO.

O.C.S.- S- 6842

PHILL IPS PETROLEUM COMPANY

Prepared By ! John E. Chonct 8 Associates, Inc.

PROPOSED LOCATIONS CHANDELEUR AREA

SCALE : l " t 2 0 0 0 ' 11/10/86

Page 34: i- Jnd.) A. Dousid Giroir - BSEE Data Center

McClelland Engineers, Inc Report No. 0286-2304 '

November 17, 1986 Page 3

E. Maps , J T

Two maps are Included < w th is report: Map #1 is a v ic in i t y map showing

the general location of the proposed project in relation to the affected

states coastal zone. Map #2 contains a locatior. plat showing the location of

the proposed project.

F. Transportation of 011 and Gas

Current plans for the transportation of produced hydrocarbons as a

result of th is project are to t i e into an existing Texas Eastern 24"

pipeline approximately 12 miles away. The pipeline is located in Main

Pass 94. The exact t i e - i n po in t has not been determined. However, 1t is

expected to follow the most direct and shortest route practicable.

Hydrocarbon production as a result of the proposed project 1s expected to

result 1n:

Gas- 12 MMCFPD

Page 35: i- Jnd.) A. Dousid Giroir - BSEE Data Center

McClelland Engineers, Inc. Report No. 0286-2304 ,

U . OESCRIPTION OF THE AFFECTED ENVIRONMENT \ s

This section wi l l address the effects of the proposed act iv i ty on the

areas adjacent to the si te and the states coaxal zone.

A. Physical and Environmental

1. Commercial Fisheries

Louisiana ranks amr.-j the top f ive states In the nation with reqard to

the total value of i ts f isher ies. The ricr and productive estuarine complox 0/

the Louisiana Coastal Zone supports a wide variety of species of comm.- a}

Importance.

Mississippi produces large quantities of f i n f i sh and she' l f ish as a

result of I t s highly productive estuarine system. The Mississippi Sound area

Is the greatest contributor to the total productivity cf the region. State

managed oyster beds are located throughout the Sound.

The shrimp fishery 1s the most valuable fishery in both 'ouisiana and

Mississippi. The Gulf of Mexico region accounts for over h- i f the U.S.

shrimp production. However, in terms of harvested weight the i f Me.ihaden Is

by far the largest contributor to uhe total commercial landings 1n the region.

Commercial f ishing 1n the coastal zone and offshore areas of Louisiana

and Mississippi are Important contributors to the state, regional and local

economies along the Gulf Coast region.

The proposed project 1s located In the National Marine Service f isnlng

zone 11. In th i s grid zone, shrimp account for approximately 25X of the total

commercial landings by weight. Menhaden, croaker and unclassified Industrial

species account for the remainder of the harvested weight landed. The average

catch based on 1977-1981 landings for grid zone 11 is 171,587,963 pounds worth

over $35 m i l l i o n .

November 17, 1986 Page 4

Page 36: i- Jnd.) A. Dousid Giroir - BSEE Data Center

McClelland Engineers, Inc. November 17, 1986 Report No. 0286-2304 Page 5

The oyster landings along the Gulf region constitute approximately 15 million lbs/yr, valued at $13 million. Blue crab landings are worth $5-6 million to the yearly regional economy.(USDI,Regional EIS,Gulf of Mexico)

The major potential impacts of the proposed activity on commercial fisheries are:

a. Loss of approximately two hectares of seufloor from use by trawlers near the platform. Installations like drilling rigs/platforms take up l i t t l e sea space, however, operators are allowed to establish a safety zone around them, generally a one quarter nautical mile radius 1s sufficient to maintain .safe operations.

The C S Act Amendments provide for a Fisherman's Contingency Fund financed from oil revenues to compensate commercial fisherman for losses or damage to gear resulting from oil Industry operations.

The Impacts associated with the proposed activities are considered minimal. These impacts are otherwise offset by the beneficial increase In biomass near the platform. These structures serve as artificial reefs for marine communities by offering a substrate for attached epifauna to grow on. Pelagic fish are then attracted to these areas to feed on the attached animals thereby resulting In greater fishery yields In these areas.

Page 37: i- Jnd.) A. Dousid Giroir - BSEE Data Center

McClelland Engineers, Inc. Report No. 0286-2304 .

November 17, 1986 Page 6

2. Shipping

The Mississippi River 1s a very active shipping corridor. This great rlvfer provides a vital link to the center of the nation. The Port of New Orleans is the third largest port In the world. Hydrocarbon fuels and related materials constitute over 40 percent of the total tonnage. Agricultural commodities such as grains and soybeans are also major components of the Port's waterborne commerce.

Pascagoula Harbor Is the most active harbor 1n Mississippi. During 1981 the annual commercial vessel traffic totaled approximately 16000 vessels. Of this total approximately 1000 were deep draft (>18 ft.) vesseis.

A shipping fairway Is located in the southern sector of Chandeleur Block 39. The Phillips Petroleum Company 1s aware of the limitations regarding fairway operations and will conduct their operations 1n compliance with all applicable regulations.

3. Recreation

Many fish and shell fish sought after for commercial value are also pursued for sport in coastal Louisiana and Mississippi. Saltwater sport species Include spotted sea trout, red drum, red snapper, Florida pompano and tarpon.

The offshore permanent structures provide highly productive artificial reefs that are favorable fishing areas for saltwater sport fisherman. Additionally, these offshore structures serve as navigational aids for small boat operators and occasionally provide shelter and refuge during storms and mechanical breakdowns. Thus the Implementation of this project Is not expected to produce any adverse Impacts on sport fishing and pleasure boating; in fact, recreational potential will be slightly Increased due to this action.

Page 38: i- Jnd.) A. Dousid Giroir - BSEE Data Center

McClelland Engineers, Inc Report No. 0286-2304

November 17, 1986 Page 7

4. Cultural Resources

I The results of an underwater archaeological survey conducted for the

previous Plan of Exploration by Odum Offshores Indicates that no archaeological features were Identified 1n Chandeleur Block 40. No reported shipwrecks were determined on MMS Lease Sale Visual # 4. Phillips Petroleum Company 1s aware of the restrictions with regard to Impacts on cultural resources and will conduct their operations In full compliance with all applicable regulations.

5. Ecologically Sensitive Features

The proposed project 1s located approximately 40 miles northeast of the Plaquemine Parish, Louisiana -oast. This area Is characterized by numerous acres of marsh which provide habitat for a variety of wildlife and serves as primary nursery grounds for fish and shellfish.

The 8reton National Wildlife Refuge and Wilderness Area 1s located approximately 20 miles west of the proposed activity. This area of environmental significance has a highly Indented shoreline with black mangroves and salt marsh on the protected bay sides. These barrier Islands are Important nesting and roosting areas for many shorebirds and sea birds.

Along the adjacent Louisiana coast are the Pass A Loutre State Wildlife Management Area and the Delta National Wildlife Refuge. These areas are over 40 miles from the proposed project site and serve many conservation and preservation functions In wildlife and waterfowl management.

The Gulf Islands National Seashore Is a series of barrier Islands. These barrier Islands are Important geological features along the Gulf Coast. Barrier Islands are extremely Important In regulating and maintaining the water exchange and saltwater balance between the Gulf and the bays. They also reduce storm surge and wave action on the marshes and bays behind the barrier Islands and provide nesting areas for many shore birds and sea birds. The proposed action Is approximately 35 miles south of the Management Area.

Page 39: i- Jnd.) A. Dousid Giroir - BSEE Data Center

i

McClelland Engineers, Inc. November 17, 1986 Report No, 0286-2304 Page 8

The proposed act iv i ty is not expected to produce any adverse Impacts

ton the coastal environment or any w i l d l i f e management area In the v l d n i t y of

the proposed s i t e . There are no ecologically sensitive areas of part icular

concern in Chandeleur Block 40 which would be adversely or otherwise affected

'by the proposed ac t i v i t y . i

The nearest recreational beaches occur on the Gulf side of the

Chandeleur Islands. These areas are undeveloped. No direct Impact on the

recreational potential of these beaches 1s expected to occur as a result of

th is action.

6. Existing Pipelines and Cables

There are no known pipelines or cables in Chandeleur Block 40 which

would obstruct or hinder the proposed action.

7. Other Mineral Uses

There are no known plans to produce other minerals other than those

hydrocarbons associated with the proposed ac t i v i t y .

P. Ocean Dumping Grounds

Ocean dumping 1s prohibited in Chandeleur Block 40. The nearest E.P.A.

approved s i te for th is purpose Is approximately 275 m'les southwe.t of the

act iv i ty s i te (USDI, Regional EIS, Visual #11).

The Ph i l l i ps Petroleum Company w i l l dispose of a l l d r i l l i n g f l u ids ,

d r i l l cutt ings, wastewater and produced water 1n accordance with the

provisions of the i r NPDES permit.

Page 40: i- Jnd.) A. Dousid Giroir - BSEE Data Center

McClelland Engineers, Inc. Report No. 0206-2304

November 17, 1986 Page 9

j 9. Endangered or Threatened Species

»

The proposed project, located 40 miles off the Plaquemine Parish coast, 1s within the range of five endangered species of whales, three species or endangered turtles and two species of threatened turtles. Onshore the adjacent coastal area 1s within the range of the endangered bald eagle and the threatened American alligator. There 1s also a possible Brown Pelican nesting area on North Island in the Chandeleur Sound.

a. Whales (Endangered)

The Plaquemine Parish coast, 1s within the range of five endangered species of whales,

-Se1 whale (Balaenoptera borealis) This species 1s a possible winter

resident of the Gulf of Mexico.

-F1n whale (Balaenoptera physalus) This species is a possible winter resident of the Gulf of Mexicc,

-Blue whale (Bala; musculus) This species Is uncommon to the Gulf of Mexico.

-Humpback wh,< ' t e ^ novaeangliae) This species Is a possible winter residpnt jf tne G» f Mexico.

-Sperm whaie (Physeter catodon) The most common of the endangered

whales to occur In tne Gulf of Mexico.

Migratory patterns of the whales listed above are not directly known. It 1s presumed, however, that these species occur mainly in the deeper waters of the Gulf of Mexico. Therefore, the proposed project Is not expected to adversely affect whale populations or migratory patterns.

b. Turtles (Endangered and Threatened)

-Kemps Atlantic ridley (Lepidochelys kempii) The shrimping grounds of the northern Gulf of Mexico 1s a primary feeding area for this endangered species.

Page 41: i- Jnd.) A. Dousid Giroir - BSEE Data Center

McClelland Engineers, Ir«c. Report No. 0296-2304

November 17, 1986 Page 10

-Hawksbill tu r t le (Eretmochelys imbricata) An endangered species

hat my occur 1n the coastal waters of Louisiana.

-Leatherback tu r t le (Dermochelys coriacea) The range of this

endangered species is usually the deeper waters of the Gulf of Mexico;

hWver, observations have been made of Urge numbers ot leatherbacks feeding

on j e l l y f i sh 1n inshore waters during s ^ e r (USDI, EIS OCS Sale 58A, pg. 62).

-Green tu r t l e (Chelonia mydas) and the Loggerhead tu r t l e (Caretta

caretta) are l i s t e d as threatened and occur in the Gulf of Mexico waters.

There is a se? tur t le nesting area approximately 25 miles northwest of the

proposed si te on Chandeleur island. Nevertheless, the proposed project w i l l

not havt any direct impact on these areas or the endangered tur t les in

genet at .

c. Onshore Species (Endangered and Threatened)

-American allfgator (Alligator mississippiensis) This species i f currently classified as Threatened due to "Similarity of Appearance" on the federal list of endangered species in the coastal areas of Louisiana. Subsequently, twelve parishes currently are allowed to permit regulated harvests of alligators in their respective parishes; St. Bernard Parish Is one of these. State laws govern the harvests and allow the taking of alligator hides and meat during harvest seasons. The American Alligator 1s the only species currently on the federal list of endangered or threatened species that is commonly found in the coastal areas near the project.

-Southern Bald Eagle (Haliaeetus lencocephalus) Plaquemine Parish, 40 miles southwest of the project site, is within the range of the bald eagle. Nesting sites are found 1n trees near waterbodies.

-Brown Pelican (Pelicanus occidental is) The North Island area of Chandeleur Sound provides a nesting area for this endangered species. This area Is approximately 25 miles northwest of the proposed project.

The proposed project does not require any additional onshore facilities; therefore, there are no associated Impacts on the habitat of these onshore endangered or threatened species as a result of this action.

B. Socio-economic — Not applicable at this time.

Page 42: i- Jnd.) A. Dousid Giroir - BSEE Data Center

j McClelland Engineers, Inc. r Report No. 0286-2304

November 17, 1936 Page 11

IV. UNAVOIDABLE ADVERSE IMPACTS

The environmental consequences cf tie proposed project are expected to be minimal. Most Impacts Identified will be of a temporary nature and will occur In the Immediate vicinity of the operation. Therefore, no long term effect on the environment is expected.

Unavoidable adverse Impacts Include:

a. An Increase in air pollutants Is a result of power generation, transporta­tion modes, and Inadvertent emissions during drilling/production. However,an air quality review has been conducted pursuant to federal regulations, the findings of this review Indicate that the projected emissions are well below the exemption rates and pose no significant Impact on the ambient air quality of the onshore environment.

b. A temporary reduction in water quality due to discharges of deck drainage, sanitary and domestic waste, drilling fluid and cuttings and produced water will occur as a result of this action. The Phillips Petroleum Company conducts wastewater analysis In the area to Insure compliance with their NPDES permit. These wastewater discharges are expected to produce minimal and short-term effects on the water quality near the platform. Discharges are regulated by the U.S.Envlronmental Protection Agency's effluent guidelines (40 CFR Part 435) for oil and gas extraction. Conformance to these guidelines will be carried out throughout the project period.

c. Burial of immobile benthic organisms will occur during drilling operations in the discharge of drill cuttings. Drill cuttings accumulate on the sea floor covering an area of approximately 150 feet in diameter. In the affected area the Impact 1s localized and dissipates over time by currents. Mobile benthic organisms adjust rather rapidly to these changes and build homes on top of the cuttings. Within months the affected area Is again flourishing with new benthic communities (Zingula et al, 1977). Consequently, the Impacts are short-term and localized. Immobile benthic organism will be affected In the same way during the construction of the pipeline originating at the platform

Page 43: i- Jnd.) A. Dousid Giroir - BSEE Data Center

McClelland Engineers, Inc. November 17, 1986 Report No. 0286-2304 Page 12

and terminating at the t1e-1n point . This consequence Is unavoidable but w i l l

be Minimized by the selection of the shortest and most direct route to the

existing p ipel ine.

d. Lhere w i l l be a temporary loss of approximately f ive acres (2 hectares) of

sea space that w i l l be unavailable for commercial f ish ing. Nevertheless, there

are some posit ive external i t ies associated with the proposed ac t iv i t ies that

Id, In the long run, benefit commercial and recreational f ish ing; these

.re:

-An Increase 1n biomass near the rig/platform, thus resulting In higher

productivity

-Offshore structures may serve as navigation aids and during mechanical breakdowns or Inclement weather provide refuge for small boat operators.

Page 44: i- Jnd.) A. Dousid Giroir - BSEE Data Center

McClelland Engineers, Inc Report No. 0286-2304

November 17, 1986 Page 13

, REFERENCES

t • Buck, D.H. "Effects of Turbidity on Fish and Fishing". North American Wildlife Conference 21: 249-261.

Burke and Associates, Inc. Unique Ecological Features of the Louisiana Coast. Louisiana State Planning Office: Baton Rouge, Louisiana, 1977.

Gowanlock, James Nelson. Fishes and Fishing 1n Louisiana. Cla1tor's Book Store

Press: Baton Rouge, Louisiana. 1965.

Hay, Keith. "Fishing and OCS Energy Development/Charting a Course of Compatibility" Coastal Zone '80 Proceedings of the Second Symposium on Coastal and Ocean Management. 1980.

Renner, James R. The Coastal Zone: An Overview of Economic, Recreational and Demographic Patterns. Baton Rouge: Louisiana State Planning Office. 1976.

Lowery, G.H., Jr. The Mammals of Louisiana and its Adjacent Waters. Louisiana

University Press, Baton Rouge, Louisiana. 1974.

United States Department of Commerce, National Oceanic and Atmospheric Administration. Final Environmental Impact Statement for the Louisiana Coastal Resources Program, Office of Coastal Zone Management, Washington, D.C, 1980.

United States Department of the Interior, Bureau of Land Management. Draft Environmental Impact Statement: OCS Sale 58A: Proposed 1979 Outer Continental Shelf 011 and Gas Lease Sale 58A: Washington, D.C, 1979.

United States Department of the Interior, Bureau of Land Management. Draft Environmental Impact Statement: OCS Sales A62 and 62. Proposed 1980 Outer Continental Shelf Oil and Gas Lease Sales A62 and 62: Washington, D.C, 1976.

United States Department of the Interior, U.S. Geological Survey. Compilation of Regulations Related to Mineral Resource Activities on the Outer Continental Shelf: Volume 1 and 2. Washington, D.C, 1981.

Page 45: i- Jnd.) A. Dousid Giroir - BSEE Data Center

McClelland Engineers, Inc Report No. 0286-2304

November 17, 1986 Page 14

United States Department of the Inter1or,Mirerals Management Service. Final

Final Regional EIS; Volumes m i : Gulf of Mexico, Washington D.C. 1983

United States Oepartment of the In ter io r , F1sh and Wi ld l i fe Service; Region 4

Endangered Species Notebook. Atlanta, Georgia, 19/9.

Zingula, Richard P. Larson, Dana W. "Fate of D r i l l Cuttings 1n the Marine

EnvironmentM Offshore Technology Conference. 1977.

Page 46: i- Jnd.) A. Dousid Giroir - BSEE Data Center

1

COASTAL ZONE MANAGEMENT CONSISTENCY DETERMINATION

DEVELOPMENT OPERATIONS COORDINATION DOCUMENT

Type of Plan

CHANDELEUR BLOCK 40

Area and Bloclc

The proposed activit ies described In detail in this Plan comply with Louisiana and Mississippi's approved Coastal Zone Management Programs an 1 will be conducted i n a manner consistent with such Program.

PHILLIPS PETROLEUM COMPANY

Lessee or Operator

Certifying Official

Date