I Duke Bryan J. DolanOwEnergyo VP, Nuclear Plant Development
Duke EnergyECO0DI 526 South Church StreetCharlotte, NC 28201-1006
Mailing Address:P.O. Box 1006-ECO0D
December 3, 2008 Charlotte, NC 28201-1006
704-382-0605
Document Control Desk [email protected]
U.S. Nuclear Regulatory CommissionWashington, DC 20555-0001
Subject: Duke Energy Carolinas, LLCWilliam States Lee III Nuclear Station - Docket Nos. 52-018 and 52-019AP1000 Combined License Application for theWilliam States Lee III Nuclear Station Units 1 and 2Response to Request for Additional InformationLtr# WLG2008.12-04
Reference: Letter from J.M. Muir (NRC) to B.J. Dolan (Duke Energy), Request forAdditional Information Regarding the Environmental Review of theCombined License Application for William States Lee Nuclear StationUnits I and 2, dated August 21, 2008
This letter provides the Duke Energy response to the Nuclear Regulatory Commission's(NRC) requests for the following additional information (RAI) items listed in thereference letter:
RAI 55, Aquatic EcologyRAI 56, Aquatic Ecology
Responses to these NRC requests are addressed in the enclosure which also identifiesany associated changes that will be made in a future revision of the William States LeeIII Nuclear Station application.
If you have any questions or need any additional information, please contact Peter S.Hastings at 980-373-7820.
Vice PresidentNuclear Plant Development
www. duke-energy. com
![Page 2: I Duke OwEnergyo VP, Nuclear Plant Development · ".-tp4 i 'i an'" tr solno `c section t ' notes 1111 i 0 i i i i iii i-t 41ii 3-t tin sflttilmat 'in. j • --toutn- sic cii typical](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f14c41bafb6b101a847cd18/html5/thumbnails/2.jpg)
Document Control DeskDecember 3, 2008Page 2 of 4
Enclosure:
1. Responses to RAI 55, Aquatic Ecology and RAI 56, Aquatic Ecology
![Page 3: I Duke OwEnergyo VP, Nuclear Plant Development · ".-tp4 i 'i an'" tr solno `c section t ' notes 1111 i 0 i i i i iii i-t 41ii 3-t tin sflttilmat 'in. j • --toutn- sic cii typical](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f14c41bafb6b101a847cd18/html5/thumbnails/3.jpg)
Document Control DeskDecember 3, 2008Page 3 of 4
AFFIDAVIT OF BRYAN J. DOLAN
Bryan J. Dolan, being duly sworn, states that he is Vice President, Nuclear PlantDevelopment, Duke Energy Carolinas, LLC, that he is authorized on the part of saidCompany to sign and file with the U. S. Nuclear Regulatory Commission thissupplement to the combined license application for the William States Lee III NuclearStation and that all the matter and facts set forth herein are true and correct to the bestof his knowledge.
Subscrid and swornt me on Dpc -b 3- 3, o-
Notary Public
My commission expires: ~LL~Z ~Lz~ ~&fl
SEAL
![Page 4: I Duke OwEnergyo VP, Nuclear Plant Development · ".-tp4 i 'i an'" tr solno `c section t ' notes 1111 i 0 i i i i iii i-t 41ii 3-t tin sflttilmat 'in. j • --toutn- sic cii typical](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f14c41bafb6b101a847cd18/html5/thumbnails/4.jpg)
Document Control DeskDecember 3, 2008Page 4 of 4
xc (wo/enclosure):
Luis Reyes, Regional Administrator, Region IILoren Plisco, Deputy Regional Administrator, Region IIThomas Bergman, Deputy Division Director, DNRLStephanie Coffin, Branch Chief, DNRLGregory Hatchett, Branch Chief, DSER
xc (w/enclosure):
Linda Tello, Project Manager, DSERBrian Hughes, Senior Project Manager, DNRL
![Page 5: I Duke OwEnergyo VP, Nuclear Plant Development · ".-tp4 i 'i an'" tr solno `c section t ' notes 1111 i 0 i i i i iii i-t 41ii 3-t tin sflttilmat 'in. j • --toutn- sic cii typical](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f14c41bafb6b101a847cd18/html5/thumbnails/5.jpg)
Enclosure No. 1 Page 1 of 2Duke Letter Dated: December 3, 2008
Lee Nuclear Station Response to Request for Additional Information (RAI)RAI Letter Dated: August 21, 2008
Reference NRC RAI Numbers: ER RAIs 55 and 56
NRC RAI:
ER RAI 55: Provide the finalized Make - Up Ponds A and B intake structure designs andupdated descriptions when they are available. Include information on any fish -friendly parts of the design, or indicate why they are not included in the finaldesign.
ER RAI 56: Provide the finalized cooling water intake and discharge structure design and anupdated description when it is available. Include information on traveling screensand parts of the design that make it "best available technology" for protectingaquatic organisms.
Duke Energy Response:
Preliminary drawings of the intakes and discharge structures are attached to this response.Drawings WLG-7500-CCH-001 and WLG-7500-CCH-002 provide existing conditions, planarrangement, plan view, and sections for the river water intake. The intake will be equipped withtraveling screens, with 3/8 inch or smaller mesh, installed in the vertical position and designedfor continuous operation. The screens are of the modified "Ristroph" design with Fletcher typefish-friendly buckets on each screen basket. The screens have dual pressure spray headersystems with separate fish and debris troughs. The troughs are supplied with supplemental flowsufficient to move the fish and debris through the separate return troughs. The fish return troughwill exit the intake on the downriver side and return the fish to the section of the Broad River.The river water traveling screens are designed to provide a through velocity that is less than 0.5foot per second. After passing through the intake the water is conveyed by a pipe to thenorthwest comer of Make-Up Pond A where it is discharged into Make-Up Pond A through asurface outfall.
Drawings WLG-7510-CCH-001 through WLG-7510-CCH-003 describe the Make-Up Pond Aintake structure. The structure is currently designed with removable panel screens with a 3/8inch or smaller mesh and a through-velocity that is less than 0.5 foot per second. Duke iscurrently evaluating the civil, mechanical and electrical requirements for the use of travelingscreens similar to the traveling screens described for the river water intake.Drawings WLG-7520-CCH-001 through WLG-7520-CCH-004 describe the Make-Up Pond Bintake structure. The structure is currently designed with a submerged inlet (see WLG-7520-CCH-002 and WLG-7520-CCH-004) approximately 50 feet below the surface and removablepanel screens at the intake structure (see WLG-7520-CCH-003) with a 3/8 inch or smaller meshand a through-velocity that is less than 0.5 foot per second. Duke is currently evaluating thecivil, mechanical and electrical requirements for the use of traveling screens similar to thetraveling screens described for the river water intake.
![Page 6: I Duke OwEnergyo VP, Nuclear Plant Development · ".-tp4 i 'i an'" tr solno `c section t ' notes 1111 i 0 i i i i iii i-t 41ii 3-t tin sflttilmat 'in. j • --toutn- sic cii typical](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f14c41bafb6b101a847cd18/html5/thumbnails/6.jpg)
Enclosure No. 1 Page 2 of 2Duke Letter Dated: December 3, 2008
Drawings WLG-3900-P6H-001 through WLG-3900-P6H-003 describe the wastewater dischargestructure and its mountings on the Ninety-Nine Islands Dam. The discharge water will betransmitted through a 36-inch diameter high density polyethylene (HDPE) pipe anchored to theNinety-Nine Islands Dam approximately five feet below the full pond elevation to the diffuser.The design of the diffuser is not defined at this time (e.g., the diffuser drawing detail in WLG-3900-P6H-002 does not depict the final arrangement of holes in the diffuser). The final design isexpected to be similar to that shown in ER Figure 5.3-4.
Associated Revisions to the Lee Nuclear Station Combined License Application:
None
Associated Attachments:
Attachment 55/56-1
Attachment 55/56-2
Attachment 55/56-3
Attachment 55/56-4
Attachment 55/56-5
Attachment 55/56-6
Attachment 55/56-7
Attachment 55/56-8
Attachment 55/56-9
Attachment 55/56-10
Attachment 55/56-11
Attachment 55/56-12
WLG-7500-CCH-001, River Water Intake Structure Location Plan
WLG-7500-CCH-002, River Water Intake Structure Outline Plans andSections
WLG-7510-CCH-001, Pond A Intake Structure Location Plan
WLG-7510-CCH-002, Pond A Basin Intake Structure Section A
WLG-7510-CCH-003, Pond A Intake Structure Outline Plans andSection
WLG-7520-CCH-001, Pond B Intake Structure Location Plan
WLG-7520-CCH-002, Pond B Intake Structure Section
WLG-7520-CCH-003, Pond B Intake Structure Outline Plans andSections
WLG-7520-CCH-004, Pond B Intake Drop Inlet Plans and SectionsWLG-3900-P6H-001, WWS Discharge General Area Plan
WLG-3900-P6H-002, Discharge Pipe Support Details
WLG-3900-P6H-003, General Notes Raw Water System and WasteWater System
![Page 7: I Duke OwEnergyo VP, Nuclear Plant Development · ".-tp4 i 'i an'" tr solno `c section t ' notes 1111 i 0 i i i i iii i-t 41ii 3-t tin sflttilmat 'in. j • --toutn- sic cii typical](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f14c41bafb6b101a847cd18/html5/thumbnails/7.jpg)
w o0STAOE
EXISTING CONDITION PROPOSED PLAN ARRANGEMENT
LEcEN..- LTIS W OISYl-CM- MT4TTEM LNES.Z FT INTERVAlS
T0*T LIOS.S FT INTERVALS
IF. . LACES I ERSISTIN4IAC E a EXSTAG N TWIVALI*,.a .1Cf =u,--masA
coF~-e mRA~M -*• - -•T•N -r - - F - eeU I ---- ---- ----
EVATALI 0m It 0 TOESEOD IALIVTENRRE-E OYEER I-EH 0FV C0100ý, .E -. "s
PmR-'T LLm1 wr[xmME COFTIO ILL BE POE OTlRW- -T ARDAT I - -
STOTTA ARLACIO ETIL COASIACIIOL REu~rk
WAAAI -cSCKfuMOENTTOINAIC RIRCIAL.S P E"IE NVO C11EE"lSS. EILILI.ICUA STATES LEE IIlWOCtEAR STLTMIRA e
SECTIۥON A-tAOimelxlal~/m0
![Page 8: I Duke OwEnergyo VP, Nuclear Plant Development · ".-tp4 i 'i an'" tr solno `c section t ' notes 1111 i 0 i i i i iii i-t 41ii 3-t tin sflttilmat 'in. j • --toutn- sic cii typical](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f14c41bafb6b101a847cd18/html5/thumbnails/8.jpg)
NOTES:1. o CtW*LfL i,$ t•t MtrG x.q-vWO-,.-O€3.
9 M I'.-"
MAT PLAN 0 EL. 497-0 'ECK PLAN 0 EL. 537'-S"
L:l
![Page 9: I Duke OwEnergyo VP, Nuclear Plant Development · ".-tp4 i 'i an'" tr solno `c section t ' notes 1111 i 0 i i i i iii i-t 41ii 3-t tin sflttilmat 'in. j • --toutn- sic cii typical](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f14c41bafb6b101a847cd18/html5/thumbnails/9.jpg)
LOCATION PLAN - POND ARAW WATER INTAKE STRICTULE
SCAE: t.wQOEXISTING CONOTION
SCALE: r-.5-o
LEGEND:r
NIT AsT-
MI. StPA OtF -I-litM'WPitf2-IUW . V: es MtL K .t0 . A FAt
tltS IC-E L tl OOOt.KI•t~
2. Wtootu or4 KA'VAOA W~on P0TW Sttttil itOOtnitrt(t t$iOtulit itt o fl vU MWrr Citit . "POAO
MW EL€[[nVp CWLMS.P*LLS
."II-J4 StUtES LEE Ill-ULE.t STATION
POON A INTAOKE STRUICTLCSLOCATION PLAN
rin
![Page 10: I Duke OwEnergyo VP, Nuclear Plant Development · ".-tp4 i 'i an'" tr solno `c section t ' notes 1111 i 0 i i i i iii i-t 41ii 3-t tin sflttilmat 'in. j • --toutn- sic cii typical](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f14c41bafb6b101a847cd18/html5/thumbnails/10.jpg)
![Page 11: I Duke OwEnergyo VP, Nuclear Plant Development · ".-tp4 i 'i an'" tr solno `c section t ' notes 1111 i 0 i i i i iii i-t 41ii 3-t tin sflttilmat 'in. j • --toutn- sic cii typical](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f14c41bafb6b101a847cd18/html5/thumbnails/11.jpg)
F__ :-EL EE t o,.
_J J -J
MAT PLAN Q EL 510'-0" PLAN SECTION @_EL 54T-6" DECK PLAN @ EL 554-6
NOTES:
FPRELIMINARY
h[C SalTY VASSIFICslTIOE I
ou• [N[EGy CARL~TýSLLI
VI ELLIW4 S~t&ES LIE I..N[LMSTATIOM
PONO A INTAKE STRUCTUREOUTLINE PLANS AN SECTIONT
Till
I -'I6..
111 1
![Page 12: I Duke OwEnergyo VP, Nuclear Plant Development · ".-tp4 i 'i an'" tr solno `c section t ' notes 1111 i 0 i i i i iii i-t 41ii 3-t tin sflttilmat 'in. j • --toutn- sic cii typical](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f14c41bafb6b101a847cd18/html5/thumbnails/12.jpg)
NoTES.*
LIm'£E mv wa-ý Wl•• •Q~I 4NOAL L DITUB•CE ITNCLUDE "L "T, MT,,.l..1W tI" BE a.-TC -C~ AS NEL AS T-1 ARATWAC iT.D a, "WAL" TIO AAK)t OSOSEýT iAS"
OF THE COFTON s[o xsT •ýI LTKAIZDTWEINO W•L•.• • PCUP NrVO0T
TO TIC NORTHS M OF EiXISTIN CUETMAO
k (51MVIN STEE. 5100W! WATTS PIK$TS tedCONCRETE JiT•ME UT COT. K KNDNO•l
G. alieN INS OCLITO A OF" STAdNOC NATERis K! COME•Eo 1T O . M I K TC STATE."SWA WL KIE$ . TL NTS I NECESS R 0 LMT
.OFT i L N TSflCIDI WITH WITITL IN. VIC
AL FO DETAIL. ELEVATIONS MON0 WAIT LEMELKTTIM'o ETCINET TR.1TPO - M-0.OES tAEUL AND"'M&IETS, WITy COLLECTET IN 2K AN0 2,5
7. COTFIROA WILL K KICIES AFTER WuW~ STALCLFEAN
SOPEOGiN EWIWYCT SIL K TAUlR SMT TO AENWRENAiKANSýWILtT ITl-F
EXISTING CONDITIONSCALE; 1"-s0"0
LECEND*.- tIS OF OISTT.SWCE- TSITCTW EMLCSIE IT WTTEITIS
TUTTSLIMES. 5TISt ~tas
0 T .0' 12T' 16T,
"ALES t ..
DUSC E[ERGY CAROINIAS. LLCRtmergs VI LIAM STATES LEE III
EWJCLEAR STATION
LOCATION PLANPOND B INTAKE STRUCTURE
![Page 13: I Duke OwEnergyo VP, Nuclear Plant Development · ".-tp4 i 'i an'" tr solno `c section t ' notes 1111 i 0 i i i i iii i-t 41ii 3-t tin sflttilmat 'in. j • --toutn- sic cii typical](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f14c41bafb6b101a847cd18/html5/thumbnails/13.jpg)
-.ncta t-c cut
".-TP4 I
'I AN'" tr SOLNO `C
SECTION t '
NOTES
1111 I 0
I I I I iii I
-t41ii
J3-t tin SflttILmat 'IN.
• -- toUtn- SIC cii
TYPICAL EXCAVATION SECTIONNOT TO SCA.LE
PRELIMINARY
VtEC WETy CLASSIFIrCAlI E
¥.]SUI4 T/IS LEE[ III
PONO 8 INTAKE STRUCTLRESECTION
EZ W___tLG-7520-CCII-092 A
I;+A
![Page 14: I Duke OwEnergyo VP, Nuclear Plant Development · ".-tp4 i 'i an'" tr solno `c section t ' notes 1111 i 0 i i i i iii i-t 41ii 3-t tin sflttilmat 'in. j • --toutn- sic cii typical](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f14c41bafb6b101a847cd18/html5/thumbnails/14.jpg)
SECTIONSC[ Xt r \,
SECTION /(Bs1•: i'.r- "•
NOTES Wt M ~f.
ROOF PLAN 0 EL. 592'-0"
![Page 15: I Duke OwEnergyo VP, Nuclear Plant Development · ".-tp4 i 'i an'" tr solno `c section t ' notes 1111 i 0 i i i i iii i-t 41ii 3-t tin sflttilmat 'in. j • --toutn- sic cii typical](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f14c41bafb6b101a847cd18/html5/thumbnails/15.jpg)
F- -i
. PCI Uýt4 -. I NI MQn-l.
CTON /A" --- ---P1 AN
. POND B INTAKE STRUCTURE DROP INLET
LU
:ýj
![Page 16: I Duke OwEnergyo VP, Nuclear Plant Development · ".-tp4 i 'i an'" tr solno `c section t ' notes 1111 i 0 i i i i iii i-t 41ii 3-t tin sflttilmat 'in. j • --toutn- sic cii typical](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f14c41bafb6b101a847cd18/html5/thumbnails/16.jpg)
EXISTINl CONDITIONSCXt: r.w6o-- PROPOSED PtAN ARRANGEMENT
SC4lE: rT.W0
2. bdtv 0! OSKt. PMq 0tn C• gt lo Ot .'Et tt,
C 1. T.T O t 2 t 0
T01bOt.og 0140 .41141 EF itro.TMCTT
![Page 17: I Duke OwEnergyo VP, Nuclear Plant Development · ".-tp4 i 'i an'" tr solno `c section t ' notes 1111 i 0 i i i i iii i-t 41ii 3-t tin sflttilmat 'in. j • --toutn- sic cii typical](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f14c41bafb6b101a847cd18/html5/thumbnails/17.jpg)
-~ CREST-REST S L. VARIE S
'El ITA iHM-ERCM.)
riIn PON ,A "-* R, r.
:.-2S
•l~j i ,1l.7
ýCIEST
I- %. S5 ISLAN0S DAV,€(E '%S ~ IS F:N(;
CYCLOPEANMASCNRY\ \.
.:. I . W
'"" l ' " ' *"' NORMAL 7" .W
*..L 441.-..... .~~~~.c .....": • ::•" ' v,
SECTEION A
UCREST FL VARIPSINI .; tl.F D-A A HI51R;CALl
PCERF•AT:. IPC'-_ P/YR INr-L_ PLC"O tL 5|l•*? FL• _ (I S -1t .1'
'-.I 5-. 42IA11 75 9 '
1.' 5ISLA4DS GA&
SLUOCGCATE ý'ON)
", y INW EL. 175•5'
.. . . . " . ........ . . '.. ... . " . " . •:-CLOTAX
•-:•: . •" ACI R ."C N,~:• ". ;..6, M~UAX Tom*
E.- 454.7'
.• ' iT,::.. : 0 . :--\- ;.,r--- .. r\. 7 :.. " N .a-\F'~,.A1, ~ L VARIES
,F- o .- 3 ,-1.~-•
SFC71O( 3S-A-E 11'A~-0'
MCCLOPLEA'I
SINSIDE OIfk'CTERý .10RE PIPE "" "•
I "VA L-NO TA\G:NTU-Slt.[ {GSA.V)•""I~ %I • ,.",
tRIPE F-.
SBEAR T P5 R N/' T•H[11.CLI N•AtI A 15
M. m . . .l CA:
LLs
IT E,_ .'.1,'0 0:T(.PCAL__-PIE__SUIPQORT 2L10'-0"l 0._C_.
r,-I" IAA.?*TR JALVENIZE.M LLA• IAUGI4 U-.l)
DWR - 1A'IS5; OA'SII.GOBE WIN$-S D*AýIETE
HSX&G:NAL NLTS SFCTIN STAT
.LEVA-ICN VIEW ®
CYC.-CEAN CO'NCYCE_- ..
, 1. . . .......... ." ..
I W.. .
SRI.. CONCRETE AN, NSTACLmCý-CR BOLT ACCCPD 70 ti SMA'IJFACT•,R~rs PI:O4P'.O','ATOPIS p. 54111 PI ATF" I "P TPS.Jl=II --
p r1t1n' IP"YVfl PP"I 'F IIR I.FDR CElrRAL N3TES S-E O;AWING •LO-3.OC-PEH-C03l '- I 5.MSnr iil 0 h,1 0I• ' I•cV.-in 010G uALPT.iI. rR' 10
-I.STr,ITC:AV.5. r,'PEC VIta ,C VLO*TCO AND TENSUAI.I•CSD INTO 5
LtCY .01,INC TFROIM THE WEST BE-NK
"I CF T--E APOAD RIVER TONA"KI TIE IIDRC-ELECTR:C- 5 POwCRHOUSE. A 6-IND FLANGE WiLL OE PROVIICO
t)PZNG :CNSTAcCutOl IEAII .IN[ ISERI1LL eE :CS7ALLZD A-TEP DISCHARGC PIPE IS
S7A:P.LESS STCEL S ECuk ED.": -'-T-. . - . T.;EAD"D O EURD
IIOL- SIZE ' | J TAIEIOIS S.O., *.CON-nT.CTSN S- Lý AC KRSPO',S:B.o8EVOl TilC CSIGNVIic'oRl 30T r TAýr . i CF HE DIFFUSER tIPE AN:IHORPAQ SYSTEM.CIAVI*[E• PLLS3'miJ N----' 5. 5LTH & 1.NU
ti ýLATE VIO SEEL PI,.A' 4.M.TXal. -- CSICAL UrT rCsCC ASTT!NG n15OJG11 TII:TYPICAL SURFACE MCUNT -LATE 7YPTCAL ANCHOR RILT D7TATL QE1 OTERSI CEN' CF IHtP.F AT FE HSt-PORT :S F-9.SK-
(BY OTHERS) JNLESS NOTED CTH:R';IS: IN PLAN(BY OTHERS)
![Page 18: I Duke OwEnergyo VP, Nuclear Plant Development · ".-tp4 i 'i an'" tr solno `c section t ' notes 1111 i 0 i i i i iii i-t 41ii 3-t tin sflttilmat 'in. j • --toutn- sic cii typical](https://reader033.fdocuments.net/reader033/viewer/2022060417/5f14c41bafb6b101a847cd18/html5/thumbnails/18.jpg)
1. INTAKE WATER STRUCTURES ARE DESIGNED IN ACCORDANCE WITHREFERENCE SPECIFICATION WLG-RWS-MI-001.
2. BASEMAP, CONTOUR DATA AND BATHYMETRY SUPPLIED BYDEVINE TARBELL AND ASSOCIATES, COLLECTED IN 2007 AND 2008.
3. REFER TO SITE PLAN DRAWING WLG-7500-X2H-001 FOR LOCATIONOF INTAKE AND DISCHARGE STRUCTURES.
4. REFER TO MECHANICAL DRAWING WLG-GI-P6-001 FOR PIPINGLAYOUT PLANS.
5. ALL ELEVATIONS AND DIMENSIONS SHOWN ON THE DRAWINGS ARENOMINAL AND SUBJECT TO CHANGE DURING FINAL DESIGN.
6. CONCRETE WORK SHALL CONFORM TO PROJECT SPECIFICATIONSAND BUILDING CODE REQUIREMNTS FOR REINFORCED CONCRETE(ACI-318-05) AND THE SOUTH CAROLINA BUILDING CODE ANDSPECIFICATIONS FOR STRUCTURAL CONCRETE.
7. SPECIFIED COMPRESSIVE STRENGTH OF CONCRETE SIHALL BE4,000PSI AT 28 DAYS.
8. REINFORCING STEEL SHALL HAVE A MINIMUM YIELD STRENGTH OF
60000PSI CONFORMING TO ASTM A615 GRADE 60.
9. ALL STRUCTURAL STEEL SHALL CONFORM TO THE FOLLOWING:
W SIIAPES: ASTMA572 GRADE 50 ORASTM A992PLATES: ASTM A36
10. ALL PLATES SHALL BE 1 INCH THtICK UNLESS OTHERWISE NOTED.
1I. ALL WELDING SHALL BE IN ACCORDANCE WITH AWS DI.t.
12. CONT-RCTOR SHALL BE RESPONSIBLE FOR THE DESIGN OF ALLTEMPORARY STRUCTURES
PRELIMINARY
W' WETY CLASSIFICATII6 E
,ILLIIAM STATES LEE[ III
CNRl r AL NOTESM _AW WATER STEM AND
WASTE WATER SYSTEM
Ii. WLG-"°O-P6*03