I-405 Sepulveda Pass Improvements ProjectClick to edit Master title style
p p jQuarterly Community Meeting November 17, 2011
• Click to edit Master text styles– Second level
• Third level– Fourth level
» Fifth level
1
Click to edit Master title style
• Click to edit Master text styles– Second level
• Third level– Fourth level
Wilshire Segment
» Fifth level
2
Quarterly Community Meetings 2012Click to edit Master title styleQuarterly Community Meetings 2012
• Click to edit Master text styles– Second level
Month Meeting(s)February 16 Quarterly
May 17 Quarterly
• Third level– Fourth level
May 17 Quarterly
August 16 Quarterly
November 15 Quarterly» Fifth level
Q y
3
Wilshire SegmentClick to edit Master title style
W s e Seg e t
Columns rise south of Wilshire/Sepulveda intersection to support Bridge 7• Click to edit Master text styles
– Second level
Columns rise south of Wilshire/Sepulveda intersection to support Bridge 7
• Third level– Fourth level
» Fifth level
4
Wilshire SegmentClick to edit Master title style
W s e Seg e t
• Click to edit Master text styles– Second level
• Third level– Fourth level
» Fifth level
5
Columns for northbound off‐ramp cure
Wilshire SegmentClick to edit Master title style
g
Construction north of Wilshire/Sepulveda intersection• Click to edit Master text styles
– Second level
Construction north of Wilshire/Sepulveda intersection
• Third level– Fourth level
» Fifth level
6
Wilshire SegmentClick to edit Master title style
g
Construction north of Wilshire/Sepulveda intersection• Click to edit Master text styles
– Second level
Construction north of Wilshire/Sepulveda intersection
• Third level– Fourth level
» Fifth level
7
Wilshire SegmentClick to edit Master title style
g
Ab f B id 7• Click to edit Master text styles
– Second level
Abutment for Bridge 7, northbound off‐ramp to east Wilshire
• Third level– Fourth level
» Fifth level
8
Wilshire SegmentClick to edit Master title styleWilshire Segment
R l i ili i Wil hi d S l d 18 f• Click to edit Master text styles
– Second level
Relocating utilities at Wilshire and Sepulveda; some are 18 feet below street level
• Third level– Fourth level
» Fifth level
9
Wilshire SegmentClick to edit Master title styleExtended Ramp Closures
Maximum
• Click to edit Master text styles– Second level
Ramp Tentative DateMaximum
Duration (Days)
WB Wilshire on-ramp to NB I-405 1st Quarter 2012 90
NB I 405 ff WB Wil hi 1 t Q 2012 90• Third level
– Fourth level
NB I-405 off-ramp to WB Wilshire 1st Quarter 2012 90
WB Wilshire on-ramp to SB I-405 TBD 14
EB Wilshire on-ramp to SB I-405 TBD 14» Fifth levelSB I-405 off-ramp to WB Wilshire TBD 14
SB I-405 to EB Wilshire TBD 90
0 ff l hNB I-405 off-ramp to EB Wilshire TBD 21
EB Wilshire on-ramp to NB I-405 TBD 90
SB I-405 off-ramp to Santa Monica TBD 14
10
NB I-405 on-ramp from Santa Monica TBD 7
SB I-405 on-ramp from Santa Monica TBD 7
Wilshire SegmentClick to edit Master title styleNB I-405 to WB Wilshire Off-Ramp
• Click to edit Master text styles– Second level
• Third level– Fourth level
» Fifth level
11
Wilshire SegmentClick to edit Master title styleWB Wilshire to NB I-405 On-Ramp
• Click to edit Master text styles– Second level
• Third level– Fourth level
» Fifth level
12
Wilshire SegmentE t d d R Cl O t h PlClick to edit Master title styleExtended Ramp Closure Outreach Plan
U i L L d f M lh ll d D liti• Click to edit Master text styles
– Second level
Using Lessons Learned from Mulholland Demolition• Launching public campaign early
• Plan aheadA id h l k li h
• Third level– Fourth level
• Avoid the area unless you work or live there• Traffic study underway with DOT concerning Sepulveda utility work impacts• We understand capacity on Sepulveda needs to be optimized
» Fifth level• Eblast to 6,000 agencies and business groups
13
Wilshire SegmentE t d d R Cl O t h Pl (C td )Click to edit Master title styleExtended Ramp Closure Outreach Plan (Contd.)
bl l d d• Click to edit Master text styles– Second level
• Public service announcements in print, online, video media
• Media Relations Outreach
• Detour maps updates via Metro net I-405 website
• Third level– Fourth level
Detour maps, updates via Metro.net, I 405 website
• Changeable message signs, static signs and traffic control officers
• Repeated alerts via I-405 social media sites» Fifth level• Community Meeting (date TBD)
14
Wilshire SegmentClick to edit Master title styleExtended Ramp Closure Activities
Work required before 90-day closure:
• Click to edit Master text styles– Second level
Wo equ ed be o e 90 day c osu e:• Adjacent retaining walls• Structural excavation• Install shoring
• Third level– Fourth level
Install shoring• Drive steel pilesWork required during 90-day closure:• Demolition of steel railing top deck and bridge structure*» Fifth level• Demolition of steel railing, top deck and bridge structure*• Drive steel piles• Form, pour and strip wingwalls, footings, abutments, diaphragms,
approach slabs top deckapproach slabs, top deck• Erect girders*• Install overhang falsework, top deck, concrete barrier*
15
* Requires full closure of Sepulveda (Wilshire to Montana); local access will be maintained; nighttime closure from 9pm to 6am
Wilshire SegmentClick to edit Master title styleExtended Ramp Closure Demolition
• Click to edit Master text styles– Second level
• 3-4 nights to demolish WB Wilshire to NB I-405 on-ramp and NB I-405 off-ramp to WB Wilshire
• Will occur on nights 2 and 3 of 90 day closure• Third level
– Fourth level
• Will occur on nights 2 and 3 of 90-day closure
• Requires full closure of Sepulveda, from Wilshire to Montana
• Requires full closure of WB Wilshire, from Veteran to Federal» Fifth level
q
• Demolition occurs at night only, 9pm to 6am.
• Sepulveda detours during demolition:
• Eastbound: Barrington, Sunset, Veteran, Montana
• Westbound: Veteran to Montana
16
Wil hi S tClick to edit Master title styleWilshire Segment
• Click to edit Master text styles– Second level
• Third level– Fourth level
» Fifth level
38
Click to edit Master title style
• Click to edit Master text styles– Second levelSunset Segment
• Third level– Fourth level
g
» Fifth level
18
Sunset Segment – Utility WorkClick to edit Master title styleSunset Segment Utility Work
Wall 1702 – south of Montana to Constitution
• Click to edit Master text styles– Second level
Wa 70 sout o o ta a to Co st tut o• Verizon
• Sewer line
• Third level– Fourth level
Montana Undercrossing• Storm drain
Chevron » Fifth level• Chevron
Utility excavation is shown here
19
Sunset Segment – Utility WorkClick to edit Master title styleSunset Segment Utility Work
Walls 1720/1730• Click to edit Master text styles
– Second level
Walls 1720/1730
Sections of 16 inch diameter Exxon Mobil petroleum
• Water main
• Sewer line and manholes
• Third level– Fourth level
Sections of 16-inch- diameter Exxon Mobil petroleum pipe wait for installation along Sepulveda Bl.
• Sewer line and manholes
• Storm drains
• So Cal Gas» Fifth level
So Cal Gas
• Verizon Telecom
• Exxon Mobil
• LADWP Power
20
Sunset Segment – Utility WorkClick to edit Master title styleSunset Segment Utility Work
Wall 1738 A/B/C–Sunset NB Ramps• Click to edit Master text styles
– Second level
Wall 1738 A/B/C Sunset NB Ramps • Storm drain/catch basin
• Sewer line (Jack & Bore)
• Third level– Fourth level
Sunset Bridge• LADWP Water/manhole
& » Fifth level• Verizon/AT&T
• LADWP Power
Utility relocation will extend the lifespan of underground utilities, making them safer.
21
Sunset Segment--Utility RelocationClick to edit Master title styleTypical Infrastructure Beneath Sepulveda Bl
• Click to edit Master text styles– Second level
• Third level– Fourth level
» Fifth level
Illustration of utility sizes, their spatial relationship to one another and their depth below Sepulveda Bl.
Sunset Segment – Utility WorkClick to edit Master title styleSunset Segment Utility Work
Wall 1746/Church Ln Undercrossing• Click to edit Master text styles
– Second level
Wall 1746/Church Ln Undercrossing • Water line
• Exxon Mobil
• Third level– Fourth level
• LADWP-Power
• Sewer line» Fifth level
23
Sunset Segment – Utility WorkClick to edit Master title styleSunset Segment Utility Work
Wall 1766 – Moraga Dr• Click to edit Master text styles
– Second level
Wall 1766 Moraga Dr• Verizon wireless
• LADWP-Power
• Third level– Fourth level
• Storm drain
» Fifth level
24
Sunset Segment – Bridge WideningClick to edit Master title styleSunset Segment – Bridge Widening
Montana Undercrossing Widening Typifies Bridge Work (Before)
• Click to edit Master text styles– Second level
o ta a U de c oss g W de g yp es dge Wo ( e o e)
• Third level– Fourth level
» Fifth level
25
Illustration not to scale.
Sunset Segment – Bridge WideningClick to edit Master title styleSunset Segment – Bridge Widening
Montana Undercrossing Widening Typifies Bridge Work (After)
• Click to edit Master text styles– Second level
o ta a U de c oss g W de g yp es dge Wo ( te )
• Third level– Fourth level
» Fifth level
26
Illustration not to scale.
Sunset Segment – Bridge WideningClick to edit Master title styleSunset Segment Bridge Widening
In advance of bridge or freeway widening, utilities must be
• Click to edit Master text styles– Second level
g y gmoved out of the way first.
• Third level– Fourth level
» Fifth level
27
Sunset Segment – Utility WorkClick to edit Master title styleSunset Segment Utility Work
Getty Center Drive• Click to edit Master text styles
– Second level
Getty Center Drive • Power relocation
Sepulveda Undercrossing Getty Ramps• Third level
– Fourth level
Sepulveda Undercrossing – Getty Ramps • Verizon telecom
• LADWP-Power» Fifth level
LADWP Power
7
l k d l lSunset Segment
Click to edit Master title styleClick to edit Master title styleg
• Click to edit Master text styles– Second level
• Click to edit Master text styles– Second level
• Third level– Fourth level
• Third level
– Fourth level
» Fifth le elRetaining walls leave less space underneath them than» Fifth level » Fifth levelspace underneath them than would first appear.
2929
l k d l lCompleted Sunset Bridge
Click to edit Master title styleClick to edit Master title stylep g
• Click to edit Master text styles– Second level
• Click to edit Master text styles– Second level
• Third level– Fourth level
• Third level
– Fourth level
» Fifth le el» Fifth level » Fifth level
30
Click to edit Master title style
• Click to edit Master text styles– Second levelMulholland Segment
• Third level– Fourth level
g
» Fifth level
31
Mulholland Segment(S l d t V t )Click to edit Master title style(Sepulveda to Ventura)
Key Upcoming Activities• Click to edit Master text styles
– Second level• Utility relocations on the Skirball Bridge and Sepulveda
• Freeway overpass/bridge widening at Bel Air Crest
Key Upcoming Activities
• Third level– Fourth level
y p / g g
• Mulholland Bridge reconstruction
• Valley Vista early prep work
» Fifth level
d b kWest side abutment takes shape at Mulholland Bridge.
32
Bridge Widening At Bel Air CrestClick to edit Master title styleBridge Widening At Bel Air Crest
• Click to edit Master text styles– Second levelRetaining wall
• Third level– Fourth level
Fwy Widening
Bridge Widening
» Fifth level
33
Bridge Widening At Bel Air CrestClick to edit Master title styleBridge Widening At Bel Air Crest
Bel Air Crest undercrossing
• Click to edit Master text styles– Second level
glooking northwest
• Third level– Fourth level
Pile drilling on north side of Bel Air Crest; only small drill can be used this close to
» Fifth levelcan be used this close to freeway.
34
Relocated Southbound Skirball RampsClick to edit Master title styleRelocated Southbound Skirball Ramps
• Click to edit Master text styles– Second level
• Third level– Fourth level
» Fifth level
N
Retaining Wall
35
Valley Vista Sound/Retaining Wall Construction Click to edit Master title styleZone Layout
Yellow: Work/Yard areasRed: Structures to be demolished
• Click to edit Master text styles– Second levelSh O k A
Red: Structures to be demolishedBlue: Retaining wall with sound wallGreen: Existing sound wall to remain during constructionOrange: Existing sound wall to be demolishedPurple: New sound wallPink: New retaining wallBl k C t ti f d t
• Third level– Fourth level
Sherman Oaks Ave. Black: Construction fence and gatesMaroon: Truck haul routes
» Fifth level
N
36
N
Mulholland SegmentClick to edit Master title styleMulholland Bridge Reconstruction—Ongoing Work
Mulholland Segment
• Click to edit Master text styles– Second level
• Pile driving of bridge abutment
• Bridge column footing construction
Mulholland Bridge Reconstruction—Ongoing Work
• Third level– Fourth level
Bridge column footing construction
• Freeway roadway widening
» Fifth levelUnder Mulholland Bridge looking southwestsouthwest
37
Mulholland SegmentClick to edit Master title styleMulholland Bridge Reconstruction—Upcoming Work
Mulholland Segment
• Click to edit Master text styles– Second level
• Construction work zone development at freeway median
• Temporary lane widening on the Mulholland Bridge
Mulholland Bridge Reconstruction—Upcoming Work
• Third level– Fourth level
• Utility work
» Fifth levelExcavation at west side of Mulholland Bridge
38
Mulholland SegmentClick to edit Master title styleMulholland Bridge Reconstruction—Continuing Work
Mulholland Segment
• Click to edit Master text styles– Second level
Mulholland Bridge Reconstruction—Continuing Work
• Third level– Fourth level
» Fifth level
Bridge supports rise on both
39
Bridge supports rise on both sides of Mulholland Bridge
Mulholland Bridge ReconstructionClick to edit Master title styleMulholland Bridge Reconstruction
Completed Mulholland Bridge
• Click to edit Master text styles– Second level
• Third level– Fourth level
» Fifth level
40
40
Social Media OutreachClick to edit Master title styleSocial Media Outreach
• This week Community Relations
• Click to edit Master text styles– Second level
Link to LADOT street conditions• This week Community Relations
sent its 12,000th Twitter posting.
• Last month 54,721 visitors viewed the project website
• Third level– Fourth level
viewed the project website.
• Twitter has 3,380 followers.
• Our Facebook page currently has 5 881 lik d 3 359 f ll» Fifth level
• Nixle has 278 followers.
5,881 likes and 3,359 followers.
1241
Click to edit Master title styleFor More Information
• Click to edit Master text styles– Second level