Hywind Scotland Pilot Park
Presented by Rune T.AlmåsAS Stordbase
![Page 2: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase](https://reader031.fdocuments.net/reader031/viewer/2022030319/5867759d1a28ab87408baf6a/html5/thumbnails/2.jpg)
![Page 3: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase](https://reader031.fdocuments.net/reader031/viewer/2022030319/5867759d1a28ab87408baf6a/html5/thumbnails/3.jpg)
![Page 4: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase](https://reader031.fdocuments.net/reader031/viewer/2022030319/5867759d1a28ab87408baf6a/html5/thumbnails/4.jpg)
Hywind Demo – In operation since 2009
• 2.3MW WTG
• Located 10km off Norwegian coast at 200m water depth
• In operation since September 2009
• Produced over 140 GWh since start-up
• Capacity factor (overall) 41.4%
• Experienced maximum wind speed of ca.44m/s and maximum wave height of ca.19m
• Performance has been very good
• Best power producing 2.3 MW turbine delivered by Siemens!
![Page 5: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase](https://reader031.fdocuments.net/reader031/viewer/2022030319/5867759d1a28ab87408baf6a/html5/thumbnails/5.jpg)
![Page 6: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase](https://reader031.fdocuments.net/reader031/viewer/2022030319/5867759d1a28ab87408baf6a/html5/thumbnails/6.jpg)
![Page 7: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase](https://reader031.fdocuments.net/reader031/viewer/2022030319/5867759d1a28ab87408baf6a/html5/thumbnails/7.jpg)
Hywind Scotland Pilot Park
• Hywind Scotland
• Area (sea level) ~4 km2
• Water depth 95-120 m
• Average wind speed (@100 m) 10.1 m/s
• Mean waves, Hs 1.8 m
• Installed capacity (5 WTGs) 30 MW
• Offshore export cable length 30 km
• Onshore cable length 2-3 km
• Transmission voltage 33 kV
![Page 8: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase](https://reader031.fdocuments.net/reader031/viewer/2022030319/5867759d1a28ab87408baf6a/html5/thumbnails/8.jpg)
Hywind Scotland pilot park at a glance
![Page 9: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase](https://reader031.fdocuments.net/reader031/viewer/2022030319/5867759d1a28ab87408baf6a/html5/thumbnails/9.jpg)
Floating wind - Potential markets
![Page 10: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase](https://reader031.fdocuments.net/reader031/viewer/2022030319/5867759d1a28ab87408baf6a/html5/thumbnails/10.jpg)
![Page 11: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase](https://reader031.fdocuments.net/reader031/viewer/2022030319/5867759d1a28ab87408baf6a/html5/thumbnails/11.jpg)
Assembly at Stordbase – Stordbase overview
• Storage areas, inside and outside• Transport lanes between quay,
storage and assembly site• Offices• General assembly area• 5 erection stands• Elephant foot placement• Flotel• Temporary mooring of substructure• Security
![Page 12: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase](https://reader031.fdocuments.net/reader031/viewer/2022030319/5867759d1a28ab87408baf6a/html5/thumbnails/12.jpg)
SWT-6.0-154 turbine
Rotor Diameter: 154m Rotor Area : 18.600m2
![Page 13: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase](https://reader031.fdocuments.net/reader031/viewer/2022030319/5867759d1a28ab87408baf6a/html5/thumbnails/13.jpg)
![Page 14: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase](https://reader031.fdocuments.net/reader031/viewer/2022030319/5867759d1a28ab87408baf6a/html5/thumbnails/14.jpg)
Assembly at Stordbase
![Page 15: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase](https://reader031.fdocuments.net/reader031/viewer/2022030319/5867759d1a28ab87408baf6a/html5/thumbnails/15.jpg)
![Page 16: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase](https://reader031.fdocuments.net/reader031/viewer/2022030319/5867759d1a28ab87408baf6a/html5/thumbnails/16.jpg)
Marine Operation – Upending & Filling of solid ballast 38
![Page 17: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase](https://reader031.fdocuments.net/reader031/viewer/2022030319/5867759d1a28ab87408baf6a/html5/thumbnails/17.jpg)
Marine Operation – Lifting and installation of WTG Tower
![Page 18: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase](https://reader031.fdocuments.net/reader031/viewer/2022030319/5867759d1a28ab87408baf6a/html5/thumbnails/18.jpg)
Tow from Assembly Site and Hook-up at Installation Site
![Page 19: Hywind Scotland Pilot Park Presented by Rune T.Almås AS Stordbase](https://reader031.fdocuments.net/reader031/viewer/2022030319/5867759d1a28ab87408baf6a/html5/thumbnails/19.jpg)
Takk for meg!!
Takk for meg