Hyunday Case Study
Transcript of Hyunday Case Study
Zephyr 7707 Gateway Blvd, Suite 100, Newark, CA 94560 | www.getzephyr.com
The process of assembling an automobile has changed dramatically with the introduction of automated machinery and robotics capable of assembling vehicles without human intervention. It is crucial to not only have software that ensures vehicles are constructed properly to be safe and functional, but that they also provide a user experience beyond just the bare minimum of driving a car.
Innovations in the field of vehicle telematics have added features to automobiles to create a truly unique, driving experience. Telematics refers to the joining of “telecommunications” and “informatics” where local information is stored and used in different business applications. Some examples of common vehicle telematics include vehicle tracking (such as through the use of GPS satellites and receivers) and wireless vehicle safety communications that assist in car and road safety.
Based in Anaheim, California, Hyundai AutoEver America is a provider of these telematics offerings through Hyundai’s Blue Link services.
Moving from Excel to a dedicated testmanagement solution
In an effort to move away from Excel spreadsheets for a dedicated test management solution, Dharmveer Sidhu, QA Manager at Hyundai AutoEver America, and his team selected Zephyr Enterprise.
Some specific challenges that the QA team needed to address include:
1. Could not link testcase to either defects or requirements in JIRA
2. Needed a way to see manual testcases and automated tests in one dashboard
3. Excel made reporting a time-consuming endeavor
Zephyr Enterprise
CASE STUDY
HYUNDAI TESTS TELEMATICS WITHZEPHYR ENTERPRISE
Zephyr Enterprise fulfills Hyundai’s needs
1. Zephyr Enterprise provided a bi-directional integration to JIRA, giving Hyundai’s project team complete traceability
2. By integrating Zephyr Enterprise to selenium, Hyundai was able to view manual and automated tests in one dashboard
3. Hyundai saved time as reporting became a result of work being done, improving communication on status and quality
Some of the additional considerations for why Hyundai selected Zephyr over other test management products included its ease of use, configurability and proven scalability.
Zephyr Enterprise improves overall QAproductivity and efficiency
Sidhu and his team have just scratched the surface regarding Zephyr’s features and capabilities, but they are currently using Enterprise for approximately 12 projects and 2,000 test cases.
By implementing a dedicated test management solution, Hyundai has gained end-to-end traceability and saved time on reporting. Previously, Sidhu and his team would have to create formulas in Excel and augment it based on their needs, but thanks to Zephyr’s dashboards and reporting capabilities, all he needs to do is send his superiors a URL to offer them full visibility into his team’s testing efforts.
Thanks to Zephyr’s best-in-class integrations, Sidhu and his team were able to maintain their test automation framework with Selenium and they are planning on importing their JIRA testing metrics into Zephyr’s dashboards in the coming months.
With the productivity and resource utilization benefits provided by Zephyr, Sidhu and Hyundai can ensure that they are conducting the best testing processes possible, resulting in better products, more safety and satisfied customers.
Zephyr 7707 Gateway Blvd, Suite 100, Newark, CA 94560 | www.getzephyr.com
“We found that it was the most mature product, as opposed to the others which we were evaluating,” Sidhu said when asked why Zephyr was selected. “There are fields which you can configure yourself for Zephyr, and they can actually make things easier and more traceable as compared to Excel or other tools.”
Cortex SoftwareQA Department
Release Setup
Requirements
Repository Setup
Testcase EAS
Project Dashboard
Metrics & Reports
Documents
Testcase Creation
Testcase Execution
Defect Tracking
Project Ironclad
Req
No Unread Messages
Project IroncladErika’s Desktop
Version 1.0 Version 2.0 Version 2.1
Cancel Create
Customize and Export Reports
Test Execution Report
ID
Priority
Cycle
Script ID
Coverage
M/A
Covered
Not Covered
All
Execution Date
From:
To:
1. Select fields:
2. Filter by:
3. Pick type of report: 4. Output as:
6. Title:
Testcase Name
Manual or Auto
Path
Script Path
Status
Actual Time
Environment
Tags
Notes
Executed By
Req Coverage
Attachments
Alt ID
Estimated Time
Build
Comments
Defects
Executed On
Script Name
Altld Holder
Select All Select None
Manual
Summary Detailed Data (Excel only)
Defects
Defects
PDFHTML Word
section of Department Dashboard Please provide a title for this report
Test Execution Reportsection of Project Dashboard
5. Automatically add report to: (Optional)
Please Select
Please Select
Metrics & ReportsReal-time Metrics
Test Case Distribution By Phase
Acceptance T...
12
8
4
0
20
16
12
8
4
0
200
160
120
80
40
0
300
240
180
120
60
0
Functional Te...
Mike Betts Erika Winslow Carlos Viera
shail... fada... mbettsewinslow asterix... pviera
pvierashailes... asteri...fkurshmbetts
Verification T...
Show in Project Dashboard
Test Case Created By User
Defect Totals By Resource Defect Backlog By Assignee
Show in Project Dashboard
Show in Project Dashboard Show in Project Dashboard
Critical
9
Trend charts
Testcase Creation
Testcase Execution
Defect
Testcase Execution
Defect
Overall
Testcase Creation
Requirements
Real Time charts
Add Testcase(s)
Search Other CyclesBrowse
Documentation Testing
Bring Herarchy of testcase(s)
0 node(s), 38 testcase(s)
Test Cases in this repository:
ID
10
11
12
13
M
M
A
A
Perform a fresh install on Windows X
Perform a fresh install on Windows X
Perform a fresh install on Windows X
Setup Windows auto-login security tra
00:00:10
00:00:10
00:00:10
00:00:10
Karthik Selvaki
Karthik Selvaki
Karthik Selvaki
Karthik Selvaki
P1
P1
P1
P1
Not Covered
1 requirement
1 requirement
Not Covered
Name M/A Req. Coverag Prior Estimated T Created By
Save
Release 4.7
Beta Testing Test
Function ABC
Function XYZ
Build Verification T
Function Test Case
GUI Test Cases
Incremental Integra
Integration Test Ca
Karthik’s Test Case
System Test Case
Unit Test Cases
Documentation Tes
1 Download and run setup.exe
No Attachment Comments
Perform a fresh install on Windows XP11Automated Priority:P1 History
Maps to 1 Requirement(s)
Tags
The setup filesdownloadsucessfully to thedesktop anddisplays the
2 Go through the setup wizard and answerdefaults for all prompt
Installation is almostcomplete
3 Go to Start menu and make sure theProgram Group has been created
Menu group iscreated
# Test Steps Test Data Expected Results
Map Req