HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871, AUSTRALIA Phone:(Int.) 612 9601 2022 Fax: :(Int.) 612 9602 6971 Phone:(Nat.) (02) 9601 2022 Fax: :(Nat.) (02) 9602 6971 Email: [email protected] Web: www.hyquestsolutions.com.au OPERATING MANUAL LATROBE WINCH MODELS DDT900 & WS900/P

Transcript of HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM...

Page 1: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,

HyQuestSolutionsPtyLtd 2018

Issue 5:   July 2018  1

QUALITY SYSTEM 

ISO:9001 

CERTIFIED 

HYQUESTSOLUTIONSPTYLTDPO BOX 332, LIVERPOOL B.C NSW 1871, AUSTRALIA 

Phone:(Int.) 612 9601 2022  Fax: :(Int.) 612 9602 6971 

Phone:(Nat.) (02) 9601 2022  Fax: :(Nat.) (02) 9602 6971 

Email: [email protected] 

Web: www.hyquestsolutions.com.au 

OPERATING MANUAL LATROBE WINCH MODELS DDT900 & WS900/P

Page 2: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,

HyQuestSolutionsPtyLtd 2018

Issue 5: July 2018 2

ContentsINTRODUCTION ....................................................................................................................................... 3 

SPECIFICATIONS ...................................................................................................................................... 4 

LATROBE WINCH MODES ........................................................................................................................ 5 

INSTALLATION PROCEDURE .................................................................................................................. 12 

OPERATIONAL PROCEDURE .................................................................................................................. 12 

DISMANTLING PROCEDURE .................................................................................................................. 13 

MAINTENANCE ...................................................................................................................................... 13 

FAULT FINDING ..................................................................................................................................... 15 

FITTING THE C1 CONNECTOR ................................................................................................................ 16 

FITTING ANGLE PLUG TO AMERGRAPH CABLE ....................................................................................... 17 

FITTING TEE PLUG TO AMERGRAPH CABLE ............................................................................................ 19 

FITTING AMERGRAPH CABLE TO SOUNDING DRUM .............................................................................. 20 

APPENDIX (A) STEELWORK ................................................................................................................ 22 

Page 3: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,

HyQuestSolutionsPtyLtd

Issue 5: July 2018 3

Double Drum Winch 

Model DDT900 Single Drum Powered 

Winch Model WS900/P 

LATROBE WINCH

INTRODUCTIONThe HyQuest Solutions Latrobe Double Drum winch is based on the long established approach to obtaining current meter observations and sediment samples from streams of moderate widths. The principal advantage of the double drum concept lies with the ease of traversing, as. the forces exerted by the gauging weight, are largely cancelled out. The winch exhibits state-of-the-art design features, representing years of both in-house and field development. It comprises a rugged cast aluminium body and cable drums, with stainless steel shaft components and corrosion resistant fasteners throughout.

2018

Page 4: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,

HyQuestSolutionsPtyLtd

Issue 5: July 2018 4

SPECIFICATIONS

Load capacity:

Sounding Drum:

Traversing Drum:

Geared Transmission System:

Traveller Block:

Steelwork:

Dimensions:

Weight:

Operating Cables:

Operation:

Designed for weights up to 90Kg (DDT900) and 140Kg (WS900/P)

Cast aluminium - capacity 95M of 3.2mrn (1/8") diameter Amergraph cable, fitted with silver plated slipring and depth counter registering in centimetres.

Cast aluminium of same capacity as sounding drum, fitted with counter registering in decirnetres and mounted in a pivoting yolk with handle for disengaging from sounding drum.

Incorporates a Weston brake and a free fall drag brake for DDT900. Not available for WS900/P

Conventional size and shape, aluminium construction with pactene sheaves and stainless steel axles and pins.

The steelwork need only be a simple structure as outlined in Plan No. 7A. Lockable steel cover can be supplied attached to the mounting platform. (This is optional)

Single Drum: 650 long x 440 long x 630 high

Single Drum: 31 Kg weight

Meter Suspension Cable (Amergraph)

Single Conductor 3.2 (1/8") diameter, 4.5 Kg/100 Metres

Traversing Cable (Double Drum Only) 2.5 (3/32") stainless steel 7/7 construction Weights 3.0 kg/100 Metres

Manual crank handle operation for models DDT900; Model WS900/P Raise & Lower switch using 12VDC, 38Ah battery operated motor.

2018

Page 5: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,

HyQuestSolutionsPtyLtd

Issue 5: July 2018 5

LATROBEWINCHMODES

Winchmode(DoubleDrum):

Latrobe Winch shown in "winch mode", that is, the traverse drum is out of mesh (for double drum winch) with the sounding drum and is prevented from rotating by drum stop. In this mode, the sounding weight can be raised and lowered whilst the traversing block remains stationary.

It will be observed that if the winch handle is released, the weight will be held in position - this is due to the automatic (Weston) brake. To lower, it is necessary to wind the weight down. This again is due to the influence of the Weston brake.

For the brake to operate in this manner, the pawl must engage with the ratchet wheel on the operating shaft. With the pawl engaged, a loud click will be heard as the handle is rotated in a clockwise direction.

2018

Page 6: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,

HyQuestSolutionsPtyLtd

Issue 5: July 2018 6

WinchmodePowered (SingleDrum):

The single drum winch powered mode comes with a powered 12VDC motor that require a 

12VDC:38Ah battery. 

The motor is connected to a 12VDC battery (not supplied), the gear on the motor meshes to the gear 

on the drum and the distance travelled during raise or lower is registered on the digital sounding 

counter. 

Please note the setup and operating steps are listed below: 

Step1: Connect the battery lead supplied by HyQuest Solutions to the battery (Please note battery 

not supplied by HyQuest Solutions), ensuring the polarity is right as the wrong polarity will result in 

the motor to operate in the opposite direction. The battery required is 12VDC, 38Ah. 

Step2: Connect the remote for raise and lower switch to the winch panel 

2018

Page 7: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,

HyQuestSolutionsPtyLtd

Issue 5: July 2018 7

Raise and lower controller 

Digital Counter 

Connectors 

Sounding Counter 

Step3: Connect the battery female terminal to the mating terminal on the winch frame. 

Step4: Use the raise and lower switch to operate the winch in the vertical position. Once you at the 

right position reset the digital counter to start gauging at different water level. 

 

2018

Page 8: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,

HyQuestSolutionsPtyLtd

Issue 5: July 2018 8

Please note the powered winch does not come with a Weston brake as the motor has an automatic 

brake system that will activate when motor stops. 

However, in a situation where the battery fails to operate, an override brake latch on the motor can 

be unlatched to release the brake, and the handle supplied with the winch can be used to operate 

the winch manually as follows: 

WARNING!!! 

Ensure that crank handle is engaged to the shaft and load on winch is firmly supported by 

the operator before releasing the brake latch. Failure to do so will result in the winch 

being in free fall mode. 

1) Attach the handle to the shaft

2) Hold the Handle firm in position

3) Release the brake by moving the latch to the opposite position

4) Lower or raise the winch as requested

Normal position of the 

brake latch for raise and 

lower. 

When Battery fails. This 

is the latch position to 

release the brake 

2018

Page 9: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,

HyQuestSolutionsPtyLtd

Issue 5: July 2018 9

Traversingmode(DoubleDrum Only):

Latrobe Winch shown in "traversing mode ", that is, the drum ring gears are in mesh and the drums rotate in opposite directions when the operating handle is moved. In this mode, the traveller block can be traversed in and out – refer Diagram 7A.

The traversing drum cradle pivots under the influence of the disengaging handle mounted on the opposite side. To engage the drum gears, release the locking handle and whilst holding the disengaging handle with the left hand, rotate operating handle slightly until gear teeth can be meshed, then move disengaging handle down with the left hand and lock it in place.

2018

Page 10: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,

HyQuestSolutionsPtyLtd

Issue 5: July 2018 10

Western Brakemode(Nonpowered winchesonly):

2018

Page 11: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,

HyQuestSolutionsPtyLtd

Issue 5: July 2018 11

FreeFallmode:

A supplementary drag brake is provided to permit a controlled "FREE FALL" of the gauging weight. To achieve "FREE FALL", it is first necessary to disengage the Heston brake. The Weston brake is essentially a screw clutch, which incorporates a plate ratchet wheel between the pressure plates. In the raise direction the whole assembly locks up, providing a positive drive and the ratchet wheel is cut to allow it to pass the pawl without engagement. When the raising operation stops, the brake assembly unwinds sufficiently for the pawl to engage in the ratchet wheel. With the central plate ratchet wheel stationary, the brake locks up under the influence of the load. To lower, the handle must be rotated in the appropriate direction which releases pressure from one side of the screw clutch, allowing the load side to rotate in sympathy.

To disengage the Weston brake, it is only necessary to move the pawl clear of the ratchet wheel, so that it will not engage and hold the load.

The Latrobe unit is fitted with a spring loaded pawl lifter. To bring into operation, rotate knob, hold handle of drag brake and rotate operating handle in raise direction until pawl springs clear of ratchet. Apply drag brake and disengage operating handle from spline.

Operate brake handle to give the desired rate of fall.

NOTE: FOR SAFETY REASONS, RE-ENGAGE PAWL AS SOON AS FREE FALL LOWERING IS COMPLETE.

2018

Page 12: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,

HyQuestSolutionsPtyLtd

Issue 5: July 2018 12

COUNTERS

The winch is fitted with two counters. The TRAVERSING counter is situated to the right of the traverse drum and registers in decimetres. The SOUNDING counter is situated on the control panel and registers in centimetres.

INSTALLATIONPROCEDURE

A typical installation is depicted in Drawing 7A & 8. The layout shown in drawing 7A is basedon HyQuest Solutions standard steelwork components, all of which can be supplied ready for installation. Alternatively, drawings can be provided for the components to be fabricated elsewhere. However, as a minimum, the sheave block assembly should be supplied.

1. Install winch on mounting plate using the same bolts that fixed it in the box.NOTE: The winch is designed to sit on a flat surface. If the mounting plate is distorted, pack upunder the appropriate pad before tightening - DO NOT OVERTIGHTEN.

2. Remove lower half of traveller block, re-assemble onto main cable and tie in position.

3. Fit thimble end of traversing cable through traveller block, around return sheave on far banksupport post (note that the keeper pins will have to be removed temporarily to allow thimble

clearance) and back to the cable anchorage, refer Drawing 8. The cable should be manuallytensioned and then fixed in position, with the soft clamp, on the river side of the traveller block. Cut cable to length, then fit thimble and swage supplied.

OPERATIONALPROCEDURE

1. Install winch and traveller block as described in “INSTALLATION PROCEDURE”2. Disconnect C1 cable connector from tension spring on winch, wind out Amergraph cable

over layer winding sheave of winch and then over· sounding sheave of traveller block it isnecessary to remove lower section of traveller block for this operation. Connect to currentmeter hanger bar. Fit angle plug to current meter.

3. Remove end of upper traversing cable from anchorage and connect to the stream side ofthe traversing block. Similarly, release the lower traversing cable and pass end over thelayer winding sheave of the traversing drum, and fit to the slotted hole in the slipring endof the drum - refer Drawing 7A.

4. Remove soft clamp from traversing cable and main cable.5. With traversing drum disengaged, wind the weight up to the traveller block - engage

traversing drum and lower the weight to the ground. Repeat this procedure until thetraversing cables are tensioned.

6. Connect the current meter revolution counter to the winch terminals and check circuitoperation.

7. Position weight over zero chainage indicator and zero traversing counter.8. Proceed with discharge measurement.

2018

Page 13: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,

HyQuestSolutionsPtyLtd

Issue 5: July 2018 13

DISMANTLINGPROCEDURE

1. Traverse traveller block to operating side position.2. Tie traveller block in position near winch.3. Attach soft clamp to traversing cables and main cable on river side of traveller block.4. Disengage traversing drum, then lower sounding weight to the ground (thus reducing

tension in the cables).5. Remove traversing cable from drum and connect to anchorage chain with padlock. Refer

Drawing 8.6. Loosen soft clamp, remove traversing cable end from traveller block, pull cable in and

attach to padlock. Tighten soft clamp.7. Remove traveller block from main cable.8. Disconnect current meter, weight and current meter counter.9. Wind on Amergraph cable and secure C1 connector to tension spring.10. Remove winch from mountings.

MAINTENANCEFor the most part, the Latrobe Winch is maintenance free. However periodic maintenance is required as set out below.

Lubrication

1. Grease the Weston brake every six months through the grease nipple located on theoutside of the main shaft. Ampol APlW or similar water resistant grease isrecommended. Following this, engage pawl and wind operating handle half a turn inboth directions approximately five (S) times to ensure that grease is spread on thebrake screw.

2. Wipe the layer winding screws every. six (6) months with a clean rag and solvent,preferably Trichloroethylene. Inspect for damaged threads and repair as necessary. Nolubrication is normally required but a light spray of Hawker Pacific WD40 orequivalent can be used.

3. The drum gear teeth should be lightly lubricated every six (6) months with AmpolAPlW grease or equivalent.

4. The sounding drum slipring should be wiped every three (3) months with a clean dryrag and solvent such as Trichloroethylene, then lightly sprayed with a non-insulatinglubricant such as WD40.

.

2018

Page 14: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,

HyQuestSolutionsPtyLtd

Issue 5: July 2018 14

WestonBrake

The Weston brake is a proven and reliable component of the winch drive and will provide many hours of service life. However, in the event of a breakdown, the following procedure should be followed

Removal

1. Remove all sources of external loading from the drums.2. Engage pawl and wind operating handle quarter turn anticlockwise. This will loosen

the brake screw.3. Remove grease nipple, washer and operating handle from brake shaft.4. Remove transmission cover (six setscrews) leaving brake shaft and in position on the

winch.5. Remove nyloc nut.6. Remove counter and mounting bracket.7. Remove chain guard, spacer, sprocket and drive chain from end of brake shaft.8. Remove drag brake.9. Slide brake shaft out of winch.10. Unscrew brake drum from Weston brake screw and remove both.

Assembly of these components back in to the winch is a reversal of Steps 1 - 9.

Inspection

1. Remove nylon pinion (four setscrews). Separate the ratchet wheel and the two (2) brakepads.

2. With the brake disassembled, clean all metal components thoroughly in a solvent, such asTrichloroethylene. Note: Brake pads should only be wiped with a clean, dry rag.

3. Inspect the surfaces of the ratchet wheel and brake pads for scores. Repair if necessary byplacing each of the components onto a sheet of fine grade emery cloth and work in acircular motion. Note: The Weston brake will not operate smoothly if either theratchet wheel or pads are not perfectly flat. Check that brake pad thickness is notless than 1.5mm. Replace if necessary.

4. Check the brake screw surfaces for wear or corrosion and repair with a fine file or emerypaper if necessary. Note: Lack of use of the Weston brake could cause seizure of thebrake screw. To avoid this, follow lubrication recommendation (Step 1)

5. Coat the brake screw and bore of ratchet wheel with grease before assembly. · (AmpolAPlW or equivalent)

6. Smooth any wear marks on the nylon gear and pinion teeth with a medium grade file.

2018

Page 15: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,

HyQuestSolutionsPtyLtd

Issue 5: July 2018 15

ElectricalSystem

The winch is designed for operation with conventional current meters using single core insulated meter suspension cable. A "quick connect" terminal is located at the left hand end of the sounding drum, (accessible after removing cover plate) providing an electrical connection between. the slipring and suspension cable conductor, thus allowing the cable to be fitted without removing the drum.

FAULTFINDING

The following is included to assist field staff to remedy electrical problems that can occur when taking current meter observations. Using the counter to indicate a complete circuit, proceed as follows.

1. Bridge out red and black terminals situated on control panel. If the counter does not operate, repairor replace counter.

2. Connect the red terminal to frame. No indication shows that black terminal is not properlyconnected to frame. Check for corrosion under terminal, or loose mounting.

3. Bridge slipring to frame. Operation suggests the connection through brush to the red terminal issound - proceed to step 4. Failure to operate suggests either a break in red lead from brush to redterminal or broken/sticking brush. To inspect brush, remove and ensure that it moves freely inholder. If brush is broken, reclaim unbroken portion and extend the spring, thus providing atemporary connection until a replacement can be fitted.

4. Bridge out current meter terminals. Operation indicates a failure in the meter contacts - repair. Nooperation indicates a failure in the circuit between the slipring and the Meter i.e. the circuit fault isin the suspension cable. Check quick connect terminal at winch. Check cable adjacent to meter.Check for damaged or bent cable. Repair or replace sounding cable.

2018

Page 16: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,

HyQuestSolutionsPtyLtd

Issue 5: July 2018 16

FITTINGTHEC1CONNECTOR

2018

Page 17: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,

HyQuestSolutionsPtyLtd

Issue 5: July 2018 17

FITTINGANGLEPLUGTOAMERGRAPHCABLE

2018

Page 18: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,

HyQuestSolutionsPtyLtd

Issue 5: July 2018 18

2018

Page 19: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,

HyQuestSolutionsPtyLtd

Issue 5: July 2018 19

FITTINGTEEPLUGTOAMERGRAPHCABLE

2018

Page 20: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,

HyQuestSolutionsPtyLtd

Issue 5: July 2018 20

FITTINGAMERGRAPHCABLETOSOUNDINGDRUM

2018

Page 21: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,

HyQuestSolutionsPtyLtd

Issue 5: July 2018 21

2018

Page 22: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,

HyQuestSolutionsPtyLtd

Issue 5: July 2018 22

APPENDIX(A)STEELWORK

Please note this steelwork is not supplied with the winch. This is an optional accessory. 

2018

Page 23: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 24: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 25: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 26: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 27: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 28: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 29: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 30: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 31: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 32: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 33: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 34: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 35: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 36: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 37: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 38: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 39: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 40: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 41: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 42: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 43: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 44: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 45: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 46: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 47: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 48: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 49: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 50: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 51: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 52: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 53: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 54: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 55: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 56: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 57: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 58: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 59: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,
Page 60: HyQuest Solutions Pty Ltd 2018...HyQuest Solutions Pty Ltd 2018 Issue 5: July 2018 1 QUALITY SYSTEM ISO:9001 CERTIFIED HYQUEST SOLUTIONS PTY LTD PO BOX 332, LIVERPOOL B.C NSW 1871,