Hyoung Suk KIM KNU KOREA CCAST ILC Accelerator Workshop and

17
Hyoung Suk KIM KNU KOREA CCAST ILC Accelerator Workshop and 1st Asian ILC R&D Seminar under JSPS Core University November 7, 2007 Design Status of IOT for ILC

description

Design Status of IOT for ILC. Hyoung Suk KIM KNU KOREA CCAST ILC Accelerator Workshop and 1st Asian ILC R&D Seminar under JSPS Core University November 7 , 200 7. MBK(Multi-Beam Klystron) for ILC. 10MW MBK parameters. ILC RDR. 5MW IOT. 10MW MBK (64kV). 10MW SBK. Pros. and Cons. - PowerPoint PPT Presentation

Transcript of Hyoung Suk KIM KNU KOREA CCAST ILC Accelerator Workshop and

Page 1: Hyoung Suk KIM KNU KOREA CCAST ILC Accelerator Workshop and

Hyoung Suk KIM

KNU

KOREACCAST ILC Accelerator Workshop and

1st Asian ILC R&D Seminar under JSPS Core University

November 7, 2007

Design Status of IOT for ILC

Page 2: Hyoung Suk KIM KNU KOREA CCAST ILC Accelerator Workshop and

10MW MBK parametersMBK(Multi-Beam Klystron) for ILC

ILC RDR

Page 3: Hyoung Suk KIM KNU KOREA CCAST ILC Accelerator Workshop and

10MW SBK 5MW IOT 10MW MBK (64kV)

Page 4: Hyoung Suk KIM KNU KOREA CCAST ILC Accelerator Workshop and

Pros. and Cons.

Pros. Cons.

- Low cost

- Easy installation in the

tunnel

- No expensive modulator

- Economic maintainability

- No L-band yet

- Not easy to increase freq.

- Need fund to make

prototype and industrialize

Page 5: Hyoung Suk KIM KNU KOREA CCAST ILC Accelerator Workshop and

Klystron

CathodeCollector

Electron Beam Velocity Modulation

+-

Modulator

Input Output

+- +- +- +-Focusing

+-Filament

Body current

overtemp

Interlocks

Page 6: Hyoung Suk KIM KNU KOREA CCAST ILC Accelerator Workshop and

IOTElectron Beam Density Modulation

Cathode

+-

Power Supply

Input

Bias Voltage

+-Filament

Interlocks

Collector

Output

+-

Body current

overtemp

+ -

Page 7: Hyoung Suk KIM KNU KOREA CCAST ILC Accelerator Workshop and

What’s new?

• Planar IOT (Inductive Output Tube)• Horizontal Design• L-band (1.3GHz) 5MW Tube• Calculation of Design Parameters• Feasible RF interaction Cavity

Page 8: Hyoung Suk KIM KNU KOREA CCAST ILC Accelerator Workshop and

Equivalent Circuit Approximation

• Capacitance– from Gauss’ Law

• Inductance– from Ampere’s Law

• Resonance Frequency

• Unloaded Q

Lumped-constant circuit

i(t)

V(t) C R L

Page 9: Hyoung Suk KIM KNU KOREA CCAST ILC Accelerator Workshop and

HOM IOT

Ez field in the interaction region H field in the interaction region

L-band HOM IOT Cavity S-parameters of L-band HOM IOT

Ez field in the interaction regionf(cold)=1.1GHz (MAGIC)

Page 10: Hyoung Suk KIM KNU KOREA CCAST ILC Accelerator Workshop and

Beam Voltage 55 kV (nom)

Beam Current 123 A (nom)

Frequency 1.3 GHz

Gain - dB (min)

Efficiency ~70 % (nom)

Cathode Loading <1.0 A/cm2

Design Specifications

Page 11: Hyoung Suk KIM KNU KOREA CCAST ILC Accelerator Workshop and

Pre-modulated Electron Beam

T/2 T 3T/2 2T 5T/2t

I0

I

0Pre-modulated electron beam in current v.s. time ; cut-off sinusoidal current which is used in class B operation, I = I0 MAX(sinwt, 0).

Electron Gun

Page 12: Hyoung Suk KIM KNU KOREA CCAST ILC Accelerator Workshop and

Cavity Design

Electric field intensity in RF resonator on the gap-centered cross section. This shows the cavity has TM01-mode where the resonator frequency is 1.255GHz in the absence of conductivity of cavity and electron beam.

S-parameters of the RF resonator ; real (red) and imaginary (blue) values which shows us its cold frequency is 1.255GHz. (TM01-mode)

cathode area = 300cm2

Page 13: Hyoung Suk KIM KNU KOREA CCAST ILC Accelerator Workshop and

Schematic Representation for Definition

ty

tx

T0

T00

; snapshot timetx ; transit timety ; departure timeT0 ; gap (d) transit time

= ty + tx

e-

e-

e-

e-

e-

e-

resonatorgrid 1

resonatorgrid 2

zd0

Schematic representation for the definition of snap shot time transit time (tx) to z, departure time (ty).

Page 14: Hyoung Suk KIM KNU KOREA CCAST ILC Accelerator Workshop and

Electron Beam Dynamics in 1-D

Page 15: Hyoung Suk KIM KNU KOREA CCAST ILC Accelerator Workshop and

Output Power & Gap Field

Page 16: Hyoung Suk KIM KNU KOREA CCAST ILC Accelerator Workshop and

Gap Field & Efficiency

From resonator field theory,

Page 17: Hyoung Suk KIM KNU KOREA CCAST ILC Accelerator Workshop and

Design efforts for IOT (ILC) started.

This feasibility study to design IOT for ILC looks very positive.

Design parameters are calculated along with its performance.

Final electrical design will be released soon. And industrialization will be considered. (Toshiba,CPI,…)

After fund is available, more flexible design will be performed and more resources will be put in.

SUMMARY