DOC ID © Chevron 2005 Hydrocarbon Impacts and Remedial Action at an Active Service Station Jeff Linke, Chevron Canada Limited, Vancouver, BC Saleh A. Haidar, Keystone Environmental, Burnaby, BC Remediation Technologies Symposium 2006 Fairmont Banff Springs Hotel October 11, 2006

Transcript of Hydrocarbon Impacts and Remedial Action at an Active ...

Page 1: Hydrocarbon Impacts and Remedial Action at an Active ...

DOC ID© Chevron 2005

Hydrocarbon Impacts and Remedial Action at an Active Service Station

Jeff Linke, Chevron Canada Limited, Vancouver, BC

Saleh A. Haidar, Keystone Environmental, Burnaby, BC

Remediation Technologies Symposium 2006

Fairmont Banff Springs Hotel

October 11, 2006

Page 2: Hydrocarbon Impacts and Remedial Action at an Active ...

2DOC ID© Chevron 2005

WHAT WE LEARNED

Value in Early Communication with Stakeholder Groups

Spend Time to Choose the Right Team

Do Not Hesitate to Innovate

Page 3: Hydrocarbon Impacts and Remedial Action at an Active ...

3DOC ID© Chevron 2005

BACKGROUND

Retail Location Since 1920’s

Chevron Retail Outlet Since 1950’s

Currently Four 46,000L Fiberglass USTs

Maintenance Upgrade Work in the 1990’s

Early Investigation Work in Late 1990’s

On Site Source Removal in Late 1990’s

Page 4: Hydrocarbon Impacts and Remedial Action at an Active ...

4DOC ID© Chevron 2005

PROJECT GOALS

Ensure Safety of All Receptors

Manage Contamination Issue and Liabilities

Obtain CoC for Off-Site Stakeholders

How to Obtain These Goals:

Define and Delineate Hydrocarbon Plume

Abate Further Migration

Remove Existing Contamination

Retain Future Lingering Contamination to Site

Execute Monitoring Strategy

Page 5: Hydrocarbon Impacts and Remedial Action at an Active ...

5DOC ID© Chevron 2005

SITE CHARACTERIZATION

Keystone Environmental Conducts Detailed Site Investigation

62 Boreholes Advanced On and Off-Site

Analyzed > 400 Soil samples for Hydrocarbon Indicators

Analyzed > 500 Ground Water Samples for Hydrocarbon Indicators

Developed Detailed Conceptual Site Model

Conducted Indoor Air Quality Monitoring

Regular Liaison with Stakeholders (i.e. Residents, Local and Provincial Governments)

Page 6: Hydrocarbon Impacts and Remedial Action at an Active ...

6DOC ID© Chevron 2005

SITE LAYOUT

Work Area

Page 7: Hydrocarbon Impacts and Remedial Action at an Active ...

7DOC ID© Chevron 2005

INVESTIGATED AREAS

Soil Data

Page 8: Hydrocarbon Impacts and Remedial Action at an Active ...

8DOC ID© Chevron 2005

INVESTIGATED AREAS

Groundwater Data

Page 9: Hydrocarbon Impacts and Remedial Action at an Active ...

9DOC ID© Chevron 2005

SOIL AND GROUNDWATER PLUME

Page 10: Hydrocarbon Impacts and Remedial Action at an Active ...

10DOC ID© Chevron 2005

PROJECT PLANNING

Evaluate Remedial Options

Series of Options Developed

Economic Evaluation of Options

Select Remedial Option

Agreement with Stakeholders, Internal and External

Assemble Project Team

Coordinate with Municipality, Utilities, Residents and Neighbours

Page 11: Hydrocarbon Impacts and Remedial Action at an Active ...

11DOC ID© Chevron 2005

REMEDIATION

Underpinning and Shoring

Piles and grade beams installed on 4 homes

One home demolished

Excavation

Removed all backyard improvements

Removed soil from backyards and under homes

Barrier Wall Installation

45m by 5.5m organic reactive barrier wall installed on retail station property line

Page 12: Hydrocarbon Impacts and Remedial Action at an Active ...

12DOC ID© Chevron 2005

UNDERPINNING AND SHORING

Page 13: Hydrocarbon Impacts and Remedial Action at an Active ...

13DOC ID© Chevron 2005

UNDERPINNING AND SHORING

Page 14: Hydrocarbon Impacts and Remedial Action at an Active ...

14DOC ID© Chevron 2005

UNDERPINNING AND SHORING

Page 15: Hydrocarbon Impacts and Remedial Action at an Active ...

15DOC ID© Chevron 2005

UNDERPINNING AND SHORING

Page 16: Hydrocarbon Impacts and Remedial Action at an Active ...

16DOC ID© Chevron 2005

UNDERPINNING AND SHORING

Page 17: Hydrocarbon Impacts and Remedial Action at an Active ...

17DOC ID© Chevron 2005

UNDERPINNING AND SHORING

Page 18: Hydrocarbon Impacts and Remedial Action at an Active ...

18DOC ID© Chevron 2005

EXCAVATION LIMITS

Page 19: Hydrocarbon Impacts and Remedial Action at an Active ...

19DOC ID© Chevron 2005

EXCAVATION

Page 20: Hydrocarbon Impacts and Remedial Action at an Active ...

20DOC ID© Chevron 2005

EXCAVATION

Page 21: Hydrocarbon Impacts and Remedial Action at an Active ...

21DOC ID© Chevron 2005

EXCAVATION

Page 22: Hydrocarbon Impacts and Remedial Action at an Active ...

22DOC ID© Chevron 2005

EXCAVATION

Page 23: Hydrocarbon Impacts and Remedial Action at an Active ...

23DOC ID© Chevron 2005

EXCAVATION

Page 24: Hydrocarbon Impacts and Remedial Action at an Active ...

24DOC ID© Chevron 2005

EXCAVATION

Page 25: Hydrocarbon Impacts and Remedial Action at an Active ...

25DOC ID© Chevron 2005

EXCAVATION

Page 26: Hydrocarbon Impacts and Remedial Action at an Active ...

26DOC ID© Chevron 2005

EXCAVATION

Page 27: Hydrocarbon Impacts and Remedial Action at an Active ...

27DOC ID© Chevron 2005

BARRIER WALL DESIGN

Page 28: Hydrocarbon Impacts and Remedial Action at an Active ...

28DOC ID© Chevron 2005

BARRIER WALL MODEL

Page 29: Hydrocarbon Impacts and Remedial Action at an Active ...

29DOC ID© Chevron 2005

BARRIER WALL INSTALLATION

Page 30: Hydrocarbon Impacts and Remedial Action at an Active ...

30DOC ID© Chevron 2005

BARRIER WALL INSTALLATION

Page 31: Hydrocarbon Impacts and Remedial Action at an Active ...

31DOC ID© Chevron 2005

BARRIER WALL INSTALLATION

Page 32: Hydrocarbon Impacts and Remedial Action at an Active ...

32DOC ID© Chevron 2005

BARRIER WALL INSTALLATION

Page 33: Hydrocarbon Impacts and Remedial Action at an Active ...

33DOC ID© Chevron 2005

BARRIER WALL INSTALLATION

Page 34: Hydrocarbon Impacts and Remedial Action at an Active ...

34DOC ID© Chevron 2005

POST REMEDIATION ACTIVITIES

Install Post Remediation Confirmatory Wells

Reinstate Structures (eg. floor slabs)

Reinstate Rear Yards, Fences, Garages

Reconnect Utilities

Performance Monitoring of Barrier Wall

Preparing Closure Reports for Certificates of Compliance on Off-Site Properties

Page 35: Hydrocarbon Impacts and Remedial Action at an Active ...

35DOC ID© Chevron 2005

PROJECT PARTICIPANTS

Chevron Canada Limited (Environment, Public and Government Affairs, Legal, and Engineering)

Keystone Environmental Ltd. (Environmental and Contract Administrator)

Hazco Environmental Services Ltd. (Remediation Contractor)

City of Burnaby (Engineering, Planning, Traffic)

GeoPacific Consultant Ltd. (Geotechnical)

Sommerset Engineering Group (Structural)

PLUS several other sub-contractors

Page 36: Hydrocarbon Impacts and Remedial Action at an Active ...

36DOC ID© Chevron 2005

CONCLUDING REMARK

Treat project as an investment, not an expense

Page 37: Hydrocarbon Impacts and Remedial Action at an Active ...

37DOC ID© Chevron 2005