Hybrid Solar Thermal Power Plant in Algeria

14
ALSOL – HYBRID SOLAR THERMAL TOWER POWER PLANT IN ALGERIA 2nd German-Arabic Energy Forum 20 – 21 October 2011 3.05

Transcript of Hybrid Solar Thermal Power Plant in Algeria

Page 1: Hybrid Solar Thermal Power Plant in Algeria

3.0

5

German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 1

ALSOL – HYBRID SOLAR THERMAL TOWER POWER PLANT IN ALGERIA

2nd German-Arabic Energy Forum 20 – 21 October 20113.0

5

Page 2: Hybrid Solar Thermal Power Plant in Algeria

3.0

5

German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 2

Solar Tower Jülich

Page 3: Hybrid Solar Thermal Power Plant in Algeria

3.0

5

German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 3

Solar Tower Jülich

Page 4: Hybrid Solar Thermal Power Plant in Algeria

3.0

5

German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 4

Chemical & petrochemical industries

Renewable energies Underground piping construction

Utility service

Power plant technology Energy technology

Kraftanlagen München GmbH

KAM is a leading EPC and piping construction company in Germany & Europe

Almost 6 decades of experience with a capacity of 2.400 persons and 360 Mio. €turnover

Over 10 years of experience in R&D and construction of CSP technology and an implemented reference facility

Local presence in the region

Page 5: Hybrid Solar Thermal Power Plant in Algeria

3.0

5

German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 5

Technology Transfer from Jülich Germany – to Tipaza Algeria:

ALSOL – Phase I - Feasibility

Work is based on a Bilateral Agreement between Germany & AlgeriaAdaption of the technology for algerian condition (e.g. hybrid)Selection of the suitable plant designsBasic engineering for the selected plant designsEstablishment of a sientific collaboration ( Training of Sientists in Jülich)Elaboration of a founding and finance Scheme

Page 6: Hybrid Solar Thermal Power Plant in Algeria

3.0

5

German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 6

Project partners & funders

Dirección generale de la Recherche sientifique y du Developpment technologique

Public Funding

Donee Project Partners

•Planning•Engineering•Installation•Comminssioning

•Tools & Methods•Monitoring•Optimization •Developement

•Trial Operation•Normal Operation•Investigational Operation

ProjectConstruction Research Operation

Owner & Operator: CDER DLR, SIJ, KAM CDER, SWJ, KAM, DLR, SIJKAM

Centre de recherche Energetique renouvables

Solar Tower Tipasa

ALSOL – Partners

Page 7: Hybrid Solar Thermal Power Plant in Algeria

3.0

5

German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 7

ALSOL Technical Concept

~

AirRecirculationHeliostat Field

Open VolumetricReceiver

Cold Air 120 °C

Steam

HRSG

TurbineThermalStorage

∼∼∼

Natural gas

Coolingcycle

Hot Air 680 °C Gas Turbine2

5

3

8

7

6

441

~

AirRecirculationHeliostat Field

Open VolumetricReceiver

Cold Air 120 °C

Steam

HRSG

TurbineThermalStorage

∼∼∼

Natural gas

Coolingcycle

Hot Air 680 °C Gas Turbine22

55

33

88

77

66

444411

Solar only plant concept

Page 8: Hybrid Solar Thermal Power Plant in Algeria

3.0

5

German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 8

~

AirRecirculationHeliostat Field

Open VolumetricReceiver

Cold Air 120 °C

Steam

HRSG

TurbineThermalStorage

∼∼∼

Natural gas

Coolingcycle

Hot Air 680 °C Gas Turbine2

5

3

8

7

6

441

~

AirRecirculationHeliostat Field

Open VolumetricReceiver

Cold Air 120 °C

Steam

HRSG

TurbineThermalStorage

∼∼∼

Natural gas

Coolingcycle

Hot Air 680 °C Gas Turbine22

55

33

88

77

66

444411

ALSOL Technical Concept Solar only plant concept -> Hybrid plant concept

Page 9: Hybrid Solar Thermal Power Plant in Algeria

3.0

5

German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 9

2

1

5

6

7

8

4

4

3

Operational concept: GT-hybrid parallelHeliostat field: North field, 25000 m²Tower height: 60 mReceiver design power 13,7 MWHeat storage capacity 20 MWhGT / ST design power 4,6 MW / 2,5 MWCooling concept dry air cooling

ALSOL Technical Concept

Page 10: Hybrid Solar Thermal Power Plant in Algeria

3.0

5

German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 10

Technology Advantages

☼ Bridge technology through hybridisation

simple combination with conventional (gas or biogas) firing or turbine – technology bridge

☼ Energy on demand

adaptation to the consumption profile through simple storage

☼ High system efficiency

steam cycle operates on parameters as usual for conventional power plants

☼ Environmental friendly – low water consumption

low water consumption due to dry cooling system no hazardous media used such thermal oil

ALSOL Technical Concept

Page 11: Hybrid Solar Thermal Power Plant in Algeria

3.0

5

German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 11

ALSOL Objectives

Close German – Algerian Cooperation in the field of latest renewable technologydevelopment

Proximity to research institutes, universitiesand airports in the north of Algeria

Investigation facility providing a broad spectrumfor future R&D-studies such as Hybrid with GT, heat storage, heat extraction for desalination, research platform, modular extendable scale

Innovative plant concept with gas turbine hybridization and heat storage for operation on demand and high plant availability

Light tower to promote the technology in the north African region where the future application will take place

CDER

USTHB

National universities

National university

International cooperation

TIPAZA / Bourkika

UDES

CDER

USTHB

National universities

National university

International cooperation

TIPAZA / Bourkika

UDES

TIPAZA, Bourkika36°29'39.70"N, 2°28'38.01"E

The expected annual DNI:

1900 kWh/(m² a)

Page 12: Hybrid Solar Thermal Power Plant in Algeria

3.0

5

German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 12

ALSOL II - Implementation

Time Schedule for next steps

preparation ALSOL phase II government-founded research cooperation:- Project organization- Definition of WPs

Budget acquisition and financial structure for plant construction

2012 2013 2014 2015 2016Permit Process

Detail engineeringComponent ordering

Delivery and works

Commissioning and test operationPlant handover

ALS

OL

phas

e II

Start of CSP R&D Work

Current activities

Page 13: Hybrid Solar Thermal Power Plant in Algeria

3.0

5

German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 13

CDER

USTHBNational universities

National university

International cooperation

TIPAZA / Bourkika

UDES

CDER

USTHBNational universities

National university

International cooperation

TIPAZA / Bourkika

UDES

Energy

North Africa to Europe

☼ clean & ambient friendly

☼ reliable & on demand

Technology

Europe to North Africa

☼ creation of local value

☼ development

Outlook – the bigger picture

Page 14: Hybrid Solar Thermal Power Plant in Algeria

3.0

5

German-Arabic Energy Forum 2011 Dipl. Ing. MBA Gerrit Koll 20.10.2011 14Kraftanlagen München GmbHRidlerstraße 31c - 80339 München

www.ka-muenchen.de

3.0

1

Contact: Dipl. Ing. MBA Gerrit KollE-Mail: [email protected]

Thank you for your attention