HYATT PLACE | DESIGN ADVICE REQUEST
Transcript of HYATT PLACE | DESIGN ADVICE REQUEST
HYATT PLACE | DESIGN ADVICE REQUEST AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
| 02HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
TABLE OF CONTENTS & PROJECT TEAM
TABLE OF CONTENTS
PROJECT INFORMATION 03 - 04
ZONING 05
IMMEDIATE SITE CONTEXT 06
EXISTING CONTEXT 07
MAXIMUM ALLOWED HEIGHTS 08 BUILDING PROGRAM & FAR 09 SITE CONTEXT 10 - 16
MASSING SEQUENCE 13 - 15
POTENTIAL BUILDING MATERIAL PALETTE 17
MASSING OPTIONS 18 - 19
ELEVATION CONCEPT 20
MASSING SEQUENCE 21 - 22
LEVEL 01 SPACE DIAGRAMS 23 - 24
FLOOR PLANS 25 - 29
ELEVATIONS 30 - 31
OWNERParq on 12th, LLC606 Maynard Avenue S., Suite 251Seattle, Washington 98104Contact: James WongPhone: 206.659.5750
ARCHITECTOtak Architects, Inc.808 SW Third Avenue, Suite 300Portland, OR 97204Project Manager: Casey McKenna, AIAProject Planner: Li Alligood, AICPPhone: 503.287.6825
STRUCTURAL ENGINEERDCI Engineers921 SW Washington Street, Suite 560Portland, Oregon 97205Contact: Shirley Chalupa, PE, SEPhone: 503.242.2448
GENERAL CONTRACTORUEB1700 Westlake Avenue, N., Suite 702Seattle, Washington 98109Contact: Greg SmithPhone: 206.900.8806
| 03HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
PROJECT INFORMATION
PROJECT INTRODUCTIONThe applicant proposes development of a 23-story building including 11 stories for a new Hyatt Place brand hotel with ground floor public uses and 12 stories for a new residential apartment community. Hyatt Place offers short to medium stay accommodation for business and casual travelers and an array of hospitality features also available for public use. The residential apartments will primarily be one bedroom and studio apartments. The site is 10,000 sq. ft. in area and is currently developed as a surface parking lot in a neighborhood of mixed building types of varying scales from one story to mid-rise to high-rise with equally varied material applications. Visually, the area celebrates its former prime use as an industrial district.
PROJECT DATA SITE ADDRESS: 350 NW 12th AvenueLOCATION: SE Corner of NW 12th and NW FlandersSTATE ID: 1N1E33DA 2700ASSESSOR ID: R140647
APPLICABLE STANDARDSZONING • EX zone with a (d) overlayDEVELOPMENT STANDARDS • Central City Plan District, Pearl Sub-district - Map 510-1 • Maximum FAR of 6:1; bonus FAR of up to 3:1 - Map 510-2 • Base height of 100’; eligible for bonus height of up to 250’ - Maps 510-3 and 510-4 • Subject to Ground Floor Active Use requirements - Map 510-9 • Parking Sector 4 - Map 510-10 • Floor Area Transfer Sector 1 - Map 510-23 Unlimited area transfer up to a 250’ height limitBUILDING DESIGN STANDARDS • Ground Floor Windows • Windows above the Ground Floor • Bird-safe Exterior Glazing • Ground Floor Active Uses • Eco roofs • Low Carbon Buildings
PROJECT GOALS • Connect and contribute to the rich mix of street activity and uses that characterize this area of the Pearl District • Relate to the industrial character of the district street scale and the industrial material palette • Provide urban character city living with immediate access to the Pearl’s active street life, one block access to the Streetcar line and easy connection to the public transportation network • Benefit Community through increased activity, added population and public services and amenity • Provide a unique hotel experience in an active and particularly interesting part of the Pearl • Project High Quality and Sustainability
PROJECT COMPONENTSThe current project program proposes: • 250’ height • 11 stories of hotel use, 12 stories of residential use including shared use on level 23 • 170 hotel rooms • 115 dwelling units • Ground Floor will be substantially active uses including lobbies, lounge spaces, a hotel bar and hospitality food service areas • Inclusionary housing: 10% of residential units affordable to households earning 60% MFI • 180,200 sq. ft. of development above grade • FAR to be achieved through: • 3:1 FAR inclusionary housing bonus • 9.7:1 FAR transfer from other sites within Sector 1 • 2 off-street loading spaces • Bicycle Parking to meet standards • Automobile parking is not required and none is proposed
SITE ANALYSISNEIGHBORHOOD ACTIVITY The project is located in an extremely desirable corner of the Pearl. The immediate neighborhood is a mix of low and tall buildings, small footprint and large and with a variety of uses, restaurants, coffee shops, galleries, local retail shops, residential entries and lobbies and office space. The streets are continuously active; activity spills out on to the sidewalk in all but the most inclement weather. The proposed hotel/residential project expands and enhances the level of street activity by providing hotel bar/coffee bar, food service offerings, lobbies and lounging areas for nearly the full extent of the street facing frontages.
SCALE AND MATERIALSThis micro zone exemplifies the industrial soul of the district with extensive reuse of industrial components and materials. We think of the Pearl as largely brick masonry but that is far from the fact. Concrete, painted plaster and stone in simple, bold forms and surfaces dominate this area. Brick can be found in larger, old loft buildings, some of the one story buildings, mostly along Everett, and several of the newer mid-rise, full block projects.
The project site has as immediate neighbors the 16 story Casey and the 14 story Gregory. These projects, especially the Casey, have made positive contributions to the immediate neighborhood in terms of activity, great street presence and mid-scale elements and good texture and color. The project takes advantage of the new CC2035 zoning to propose a building height of 250’. The small site footprint will produce a narrow tower, very active at the street that we believe can creatively be integrated into the urban fabric of the immediate neighborhood. This goal of connecting, contributing and relating to our neighborhood will be addressed through material choices, manipulation of the building volume and form, pushing and pulling of the façade and related building elements and particular attention to the mid-scale vocabulary.
| 04HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
FIRST RESPONSES TO DESIGN GUIDELINESThe project goals of connecting to the neighborhood, making a strong contribution to activity and vibrancy at the street and relating to the personality and imagery of the immediate context of the Pearl shape the initial responses for the design. The neighborhood context provides the strongest influence on design. Response to the Portland Personality is a given. Guidelines that will clearly shape our response to the above goals include:A8 Contribute to a Vibrant StreetscapeA4 Use Unifying ElementsA5 Enhance, Embellish and Identify AreasA 7 Establish and Maintain a Sense of Urban EnclosureB4 Provide Stopping and Viewing Places.B6 Develop Weather ProtectionC7 Design Corners that Build Active IntersectionsThe ground level of the project is all active use and is busy throughout the 24 hour day. This level will respond in terms of materials to the area’s industrial character. Canopies will be provided along most of the street frontage. The street façade is set back from the property line by some three feet to provide more room along the public sidewalk for strolling, placement of outside tables and chairs, and opportunity to view into activity within the building. Street trees, too, will continue the strong sense of the mature green tree canopy of the immediate block.
The goals noted above also apply to the design of the building itself. The project is one of the first to be developed under the new Central City 2035 Plan. We are able to build to a height of 250’ within a series of available transfers of FAR to the site. The building will be a tall tower but a narrow one due to the quarter block site. As mentioned earlier, the immediate neighborhood holds both a 16 story high-rise across the street and a 14 story mid-rise less than a block away. Building massing studies explore several strategies to delineate mid-scale elements to help knit the building into the context. Cutting away at the pure form of the tower particularly at the top and at street level, modulating the surfaces of the elevation planes, carving out of the building form are all tools being used to respond to specific guidelines aimed at relating to the immediate context.
The neighborhood offers many choices for materials and mid-scale delineation of architectural form. The tough industrial aesthetic is still the strongest influence to material and form in this part of the Pearl. The immediate context still contains many buildings built in earlier times that validate the power of its industrial character. Specific contextual influences on materials and form relevant to our design are provided including the beginnings of design solutions or attitudes for design solutions. We are exploring a range of materials for use in cladding the structure to focus our thinking and suitable response to the site context.
The ground level can be envisioned as a robust, industrial expression of columns, surfaces and distinct forms framing full glazing to link the street and building interiors and join interior and exterior activity. A subtle differentiation of the hotel and residential zones applied building elevations is under study. Portions of the tower can be carved away at the top to differentiate the building top and make the building profile increasingly slender as it reaches the top levels. In addition, a public events lounge may be provided at the top of the building with an exterior terrace connecting the project to the river and spectacular city, river and distant views. The building roof surfaces will incorporate at least the minimum 60% green roof cover and will serve storm water management.
Specific guidelines that will require particular response in the design include:A5-1 Reinforce the identity of the Pearl District NeighborhoodB1 Reinforce and Enhance the Pedestrian SystemC1 Enhance View OpportunitiesC6 Develop Transitions between Buildings and Public SpacesB1-1 Provide Human Scale to Buildings along WalkwaysC11 Integrate Roofs and Use RooftopsC10 Integrate EncroachmentsA5-3 Incorporate Water Features
PROJECT INFORMATION
| 05HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
PROJECT SITE
NW 11
TH A
VE
NW 10
TH A
VE
NW 9T
H AV
E
NW 8T
H AV
E
NW 6T
H AV
E
NW BURNSIDE ST
NORTHPARK
BLOCKSI-405
NW 7T
H AV
E
NW 8T
H AV
E
5 MINUTE
WALK
NW EVERETT ST
NW DAVIS ST
NW COUCH ST
NW FLANDERS ST
NW GLISAN ST
NW HOYT ST
NW 13
TH A
VE
NW 12
TH A
VE
13TH AVEHISTORIC DISTRICT
EXd
CXd
EXd
EXd
CXd
CXd
ZONING
| 06HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
NW FLANDERS ST
NW 12
TH A
VENW EVERETT ST
NW 11
TH A
VENW DAVIS ST
NW 10
TH A
VE
NW 13
TH A
VE
NW 14
TH A
VENW GLISAN ST
NW 9T
H AV
E
BIKEBUS
RETAIL SHOP
RESTAURANT
BAR
COFFEE SHOP
SITE
STREETCAR
TRANSIT STOP
IMMEDIATE SITE CONTEXT
| 07HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
SITE
(EXd) CENTRAL EMPLOYMENT ZONING & DESIGN OVERLAY
(EXd-NW) CENTRAL EMPLOYMENT ZONING & DESIGN OVERLAY WITH NW 13TH AVE HISTORIC DISTRICT OVERLAY
EXISTING CONTEXT + HEIGHTS
185’
180’
185’
140’
180’190’
| 08HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
MAXIMUM ALLOWED HEIGHTS
SITE
(EXd) CENTRAL EMPLOYMENT ZONING & DESIGN OVERLAY
(EXd-NW) CENTRAL EMPLOYMENT ZONING & DESIGN OVERLAY WITH NW 13TH AVE HISTORIC DISTRICT OVERLAY
| 09HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
BUILDING PROGRAM + FAR
RESIDENTIAL10:1
TRANSFER
SECTOR 1
BONUS
BASE FAR
250’
MAX
HEIG
HT
3:1
6:1HOTEL
AMENITY
AMENITY
1:1 DOES NOT COUNT TOWARDS FAR
AFFORDABLE HOUSING BONUS
BOH
| 10HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
SITE CONTEXT - STREETSCAPES
BUILDING 1 - MACKENZIE LOFTS
BUILDING 3 - CULTURED PEARL ANTIQUE STORE
BUILDING 2 -THE CASEY CONDOMINUMS
BUILDING 4 - OAKWOOD
| 11HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
SITE CONTEXT - NEIGHBORHOOD BUILDINGS
NW FLANDERS ST
NW 12
TH AV
E
NW EVERETT ST
NW 11
TH AV
E
NW DAVIS ST
NW 10
TH AV
E
NW 13
TH AV
E
NW 14
TH AV
E
NW GLISAN ST
NW 9T
H AV
E
| 12HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
SITE CONTEXT - ACTIVE STREET FRONTAGE
MULTI-TIERED PEDESTRIAN ZONE04
OUTDOOR SEATING02
WEATHER PROTECTION03
OUTDOOR SEATING AND WEATHER PROTECTION01
| 13HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
THE DIANNE APARTMENTS04
THE CASEY CONDOMINIUMS02
THE LOUISA APARTMENTS03
937 CONDOMINIUMS01
SITE CONTEXT - NEIGHBORHOOD TALL BUILDINGS
| 14HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
SITE CONTEXT - MATERIALS
| 15HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
NW 11
TH AV
E
NW 10
TH AV
E
NW 9T
H AV
E
NW P
ARK
AVE
NW 8T
H AV
E
NW 12
TH AV
E
NW 13
TH AV
E
NW 14
TH AV
E
NW DAVIS ST
NW COUCH ST
NW EVERETT ST
NW FLANDERS ST
NW GLISAN ST
NW HOYT ST
NW IRVING ST
BRICKCONCRETE / STUCCOCMUMETAL PANELSTONEWOOD SIDINGSIGNIFICANT GLAZING
1928
1939
1920
1922
1907
1907 1927 19261935
1915
1939
1946
1912
1946 2002
1908
2007
1927
1909
1924
1910
1907 1921
1941 2016
1926
19391914191419141926
1998 2001
1928 1905 2008
1921 1913
2017
19241910
20051900
1921
19271920
1917
1920
19222016
1920
1959
1946
19411910
1925
1952
1880
1947
2014 19241929
19221925
1926
1890
20021891
19202017
1945
2004
2012
1917
1928
1900
1911
1921
SITE CONTEXT - MATERIALS + AGE
| 16HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
SITE CONTEXT - STRONG GROUND LEVEL MATERIALS
| 17HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
POTENTIAL BUILDING MATERIAL PALETTE
| 18HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
MASSING OPTION 1 - FULL BLOCK01
MASSING OPTION 2 - NORTH BAR BUILDING02
MASSING OPTION 3 - REVERSE L- SHAPE03
ADVANTAGES • Large floor platesDISADVANTAGES • Inefficient floor plan • Large scale is overwhelming
ADVANTAGES • Efficient floor plan layoutDISADVANTAGES • Not enough square footage for program
ADVANTAGES • Preserves tree on corner of lotDISADVANTAGES • No active corner of building • Limited openings on South and East facades
MASSING OPTIONS - EXPLORED
| 19HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
MASSING OPTION 1 - FULL BLOCK01
NW FLANDERS ST
NW 12
TH A
VE
NW 11
TH A
VE
View opprotunities from the amenity deck
L-shaped plan is efficient for hotel rooms and apartments
10 ft setback allows for windows on South facade
Double height ground floor establishes urban edge and creates opportunities for active street
Established corner of building promotes activity and permanence
MASSING OPTION - CHOSEN
| 20HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
FLOOR LEVELS01
PROGRAM02
GRID INTRODUCTION03
GRID MANIPULATION04
RESIDENTIAL OPEN GRID ALLOWS GRID DEVIATION
HOTEL TIGHT GRID NO GRID DEVIATION
AMENITY/LOBBY BASE GRID STRONG GRID
ELEVATION CONCEPT
| 21HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
MASSING SEQUENCE - NORTHWEST
FLOOR LEVELS01
PROGRAM02 GRID INTRODUCTION
03GRID MANIPULATION
04
| 22HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
MASSING SEQUENCE - SOUTHEAST
FLOOR LEVELS01
PROGRAM02 GRID INTRODUCTION
03GRID MANIPULATION
04
| 23HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
ELEVATORCORE
HOTEL LOBBY
HOTEL FUNCTIONS
RESIDENTLOBBY
LOADING BACK OF HOUSENW
12TH
AVE
NW FLANDERS ST
VEHI
CLE
ENTR
ANCE
ACTIVE STOREFRONT
ACTI
VE S
TORE
FRON
T
LOADING ON NW 12TH AVE PUTS (3) VEHICULAR LOADING AREAS AT MID-BLOCK
DISRUPTS THE SIDEWALK ACTIVITY LEVEL ALONG NW 12TH AVE
HOSPITALITY FUNCTIONS FACE NORTH WITH NO SUNLIGHT AND NO APPRECIABLE ACTIVE STREET ALONG NW FLANDERS
INTERNAL PLANNING COMPROMISED BY HAVING RESIDENTIAL LOADING ENTRANCE ON WEST SIDE STAIR
STAIR
LEVEL 01 SPACE DIAGRAM - OPTION 1
PRIM
ARY
PEDE
STRI
AN A
CTIV
ITY
SECONDARY PEDESTRIAN ACTIVITY
| 24HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
ELEVATORCORE
HOTEL LOBBY
HOTEL FUNCTIONS
RESIDENTLOBBY LOADING
BACK OF HOUSE
NW 12
TH A
VE
VEHICLE ENTRANCE
ACTIVE STOREFRONT
ACTI
VE S
TORE
FRON
T
MOST ACTIVE STREET ON 12TH AVE
EXTENDS ACTIVE STREET NORTH TO MCKENZIE BLOCK
COMPLEMENTS SIDEWALK ACTIVITY OF CAFFE UMBRIA
LOADING SPACES ON NW FLANDERS ST ARE ACROSS FROM EXISTING PARKING ACCESS
HOSPITALITY ON WEST FOR BETTER NATURAL LIGHT EXPOSURE
PARKING ACCESS FOR JANEY IS ON 12TH SOUTH OF SITE
STAIR
STAIR
LEVEL 01 SPACE DIAGRAM - OPTION 2
NW FLANDERS ST
PRIM
ARY
PEDE
STRI
AN A
CTIV
ITY
SECONDARY PEDESTRIAN ACTIVITY
| 25HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
NW FLANDERS ST
NW 12
TH AV
E HOTEL
RESIDENTIAL
AMENITY
BACK OF HOUSE
HOTEL LOBBY
HOST
CAFERESTAURANT
SERVICE/LOADING
FOOD PREP
RESIDENTIAL LOBBY
HOTEL LOBBY
HOST
CAFERESTAURANT
SERVICE/LOADING
FOOD PREP
RESIDENTIAL LOBBY
0' 8' 16' 32'16’ 32’ 64’SITE PLANSCALE: 1/32” = 1’-0”01
FLOOR PLANS
| 26HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
HOTEL LOBBY
HOST
CAFERESTAURANT
SERVICE/LOADING
FOOD PREP
RESIDENTIAL LOBBY
0' 8' 16' 32'
FLOOR PLANS
LEVEL 01 - PLANSCALE: 1/16” = 1’-0”01
HOTEL LOBBY
HOST
CAFERESTAURANT
SERVICE/LOADING
FOOD PREP
RESIDENTIAL LOBBY
0' 8' 16' 32'
HOTEL
RESIDENTIAL
AMENITY
BACK OF HOUSE
| 27HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
FLOOR PLANS
1 2 3 4 5 6 7 8
9
10
11
12
13
14
15 16 17BOH
LEVELS 02 - 11 - PLANSCALE: 1/16” = 1’-0”01
HOTEL LOBBY
HOST
CAFERESTAURANT
SERVICE/LOADING
FOOD PREP
RESIDENTIAL LOBBY
0' 8' 16' 32'
HOTEL
RESIDENTIAL
AMENITY
BACK OF HOUSE
| 28HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
FLOOR PLANS
LEVELS 12 - 22 - PLANSCALE: 1/16” = 1’-0”01
1BD 1BD 1BD 1BD
1BD
1BD
1BD S
S
BOH
1BD
HOTEL LOBBY
HOST
CAFERESTAURANT
SERVICE/LOADING
FOOD PREP
RESIDENTIAL LOBBY
0' 8' 16' 32'
HOTEL
RESIDENTIAL
AMENITY
BACK OF HOUSE
| 29HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
1BD
1BD
1BD
FITNESS
KITCHEN LOUNGE
BOH
OUTDOOR TERRACE
LOUNGE
RR RR
RR
RR
LEVELS 23 - PLANSCALE: 1/16” = 1’-0”01
HOTEL LOBBY
HOST
CAFERESTAURANT
SERVICE/LOADING
FOOD PREP
RESIDENTIAL LOBBY
0' 8' 16' 32'
HOTEL
RESIDENTIAL
AMENITY
BACK OF HOUSE
| 30HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
ELEVATIONS
250’
- 0” M
AX H
EIGH
T
106’
- 4”
13’ -
6”22
’ - 0”
14’ -
0”96
’ - 8”
11 LE
VELS
RES
IDEN
TIAL
@ 9’
- 8”
EA
AMEN
ITY
LOBB
Y/AM
ENIT
YBA
SE-
MENT
10 LE
VELS
HOT
EL @
9’ -
8” E
A
0’ 8’ 16’ 32’16’ 32’ 64’ELEVATION - WESTSCALE: 1/32” = 1’-0”01
ELEVATION - NORTHSCALE: 1/32” = 1’-0”01
| 31HYATT PLACE | DESIGN ADVICE REQUEST | AUGUST 7, 2018 | PROJECT 18177 | EA 18-181375
ELEVATIONS
250’
- 0” M
AX H
EIGH
T
13’ -
6”22
’ - 0”
14’ -
0”96
’ - 8”
11 LE
VELS
RES
IDEN
TIAL
@ 9’
- 8”
EA
AMEN
ITY
LOBB
Y/AM
ENIT
YBA
SE-
MENT
10 LE
VELS
HOT
EL @
9’ -
8” E
A10
6’ - 4
”
0’ 8’ 16’ 32’16’ 32’ 64’ELEVATION - EASTSCALE: 1/32” = 1’-0”01
ELEVATION - SOUTHSCALE: 1/32” = 1’-0”01