Hu Atraco Catalog

81

description

Huatraco scaffold

Transcript of Hu Atraco Catalog

Page 1: Hu Atraco Catalog
Page 2: Hu Atraco Catalog

ContentsIntroduction

Huatraco® Formwork System

Huatraco® C60 Tableform(Crab® 60 Tableform)

Huatraco® C60 Shoring System(Crab® 60 Shoring System)

Huatraco® C25 Modular System(Crab® 25 Modular System)

NATFORM® Screen System(Self-Climbing Screen System)

Huatraco® Steel Frame Scaffolding & Steel Props

Huatraco® Tubular Scaffolding

Cuplock System & All-Round System

1

3

11

23

43

61

67

73

76

Specialist Solutions in Scaffolding & Formwork Engineering

All Copyrights Reserved by:HUATRACO SCAFFOLD SDN. BHD.

HUATRACO CONTRACTS SDN. BHD.

Specification provided in this catalogue reproduced from publications made available to us.The company shall not be responsible for any liability whatsoever resulting from the use of this catalogue.

©2012

Huatraco®

Page 3: Hu Atraco Catalog

1

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco Scaffold Sdn Bhd, a member of public-listed company Hiap Teck Venture Bhd,

was incorporated in 1992 as a manufacturer of a wide range of quality steel products in

Malaysia. Its main products, scaffolding and formwork, are distributed under the trade

mark of Huatraco®.

Over the years, the company has expanded its product range by investing in the production

of heavy shoring and modular systems from France. Recently, it has signed a licence

agreement with an Australian company for the manufacturing and marketing of another

new product, the Perimeter Safety Screens. This product is highly technical and shall be

used as access platform for the construction of new buildings.

Besides supplying numerous types of scaffolding and formwork products on hire or sale,

the company renders services in design drawings, technical advice and support, on-

site assistance, stock delivery planning and contracting. Together with its subsidiaries,

namely Huatraco Contracts Sdn Bhd and Huatraco Singapore Pte Ltd, the company

provides customers throughout Southeast Asia with cost effective specialist solutions in

scaffolding & formwork engineering.

H T V B

HUATRACO

crab

Introduction

Specialist Solutions in Scaffolding & Formwork Engineering

Page 4: Hu Atraco Catalog

2

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Pipe Mill

G. I. Pipe

Scaffolding Frame

Robotic Welding Machine

Manufacturing Process

Page 5: Hu Atraco Catalog

3

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Formwork System

Huatraco®

Page 6: Hu Atraco Catalog

4

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco® Formwork SystemJumpform

Huatraco® Jumpform system is versatile

safe & fast to form tall structure and

drastically reduces construction time.

Structure wall is concreated two floors or

more ahead of the floor slab. This allows

the floor slab to progress smoothly.

Page 7: Hu Atraco Catalog

5

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco® Formwork SystemJumpform

Liftcore Jumpform Section

Page 8: Hu Atraco Catalog

6

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco® Formwork SystemColumn Form

Huatraco® Square or Rectangular Column Form System can be easily formed with panels of the Huatraco® modular formwork.

Page 9: Hu Atraco Catalog

7

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco® Formwork SystemColumn Form

Page 10: Hu Atraco Catalog

8

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco® Formwork SystemWallform

Huatraco® modular formwork consists of extremely high quality surface material, well protected by steel frame. Quality controlled manufacturing standards guarantee soundly construction components with a long life span.

Huatraco® modular formwork panels are ideally sized to permit use in an infinite variety of height and length.

Page 11: Hu Atraco Catalog

9

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Wallform

Wallform Layout Plan

Wallform Section

Isometric View of Crane Handle Wallform System

Huatraco® Formwork System

Page 12: Hu Atraco Catalog

10

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco® Formwork System

• Optimized Design

• Ease of Assembly

• Efficient Operation

• Quality and Reliability

Huatraco® Formwork SystemWallform

Page 13: Hu Atraco Catalog

11

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco® C60 Tableform

Huatraco® C60 Tableform is a multipurpose formwork System for building construction, provides cost-effectiveness and efficient solutions for large area slab projects.

Efficiencies :

• Easy and practical to handle

• Versatile and safe

• Reduce labour costs

• Durable

(Crab® 60 Tableform)

Page 14: Hu Atraco Catalog

12

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Office building, Cyberjaya, Malaysia

Huatraco® C60 Tableform (Crab® 60 Tableform)

Projects - Building Construction

Page 15: Hu Atraco Catalog

13

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco® C60 Tableform (Crab® 60 Tableform)

Projects - Building Construction

Hotel Building,Kuala Lumpur,Malaysia

Condominium Building, Melaka, Malaysia

Page 16: Hu Atraco Catalog

14

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Condominium building, Singapore

Huatraco® C60 Tableform (Crab® 60 Tableform)

Projects - Building Construction

Page 17: Hu Atraco Catalog

15

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco® C60 Tableform (Crab® 60 Tableform)

Projects - Building Construction

Shopping Mall, Kuala Lumpur, Malaysia

Airport Construction, Selangor, Malaysia

Projects - Building Construction

Page 18: Hu Atraco Catalog

16

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Method of Lifting (1) - Flying Method

Huatraco® C60 Tableform (Crab® 60 Tableform)

Page 19: Hu Atraco Catalog

17

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Method of Lifting (1) - Flying Method

Huatraco® C60 Tableform (Crab® 60 Tableform)

Page 20: Hu Atraco Catalog

18

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Method of Lifting (2) - Vertical Lifting Method

Huatraco® C60 Tableform (Crab® 60 Tableform)

Page 21: Hu Atraco Catalog

19

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Method of Lifting (3) - Lifting Truss Method

Huatraco® C60 Tableform (Crab® 60 Tableform)

Page 22: Hu Atraco Catalog

20

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Telescopic Standard C60

It enables the tableform to be adjusted up to 1m.

Crab® S-Pin C60

It is S-shaped and secures the tower for lifting.

Crab® Standard C60 0.3m, 0.5m, 0.75m, 1m and 2m

They are used in conjunction with triangle to erect narrow rows. They can be coupled to a tower in case of load concentrations. Also, they are used for height adjustment.

Crab® U-Head C60 / 600

It is designed to accomodate primary, secondary, etc...

Adjustable C60 Standard

It enables fine adjustment tableform.

Crab® Jack Base C60 / 1450

It enables the tableform to be adjusted up to 1m.

Crab® Basic Standard C60

It facilitates the erection, the tower levelling and the general lay out.

Crab® U-Head C60 / TF

It is designed to accomodate primary, secondary, etc...

Components

0.35m

0.50m

0.70m

1.00m

1.50m

1.80m

2.00m

2.50m

3.00m

Crab® Ledger

It is made of tube ø 48 and is provided at both ends with a wedge-clamp.

H2xL0.7m l=2.09m

H2xL1.0m l=2.19m

H2xL1.5m l=2.45m

H2xL1.8m l=2.63m

H2xL2.0m l=2.76m

H2xL2.5m l=3.13m

H2xL3.0m l=3.53m

H1xL0.7m l=1.17m

H1xL1.0m l=1.35m

H1xL1.5m l=1.73m

H1xL1.8m l=1.98m

H1xL2.0m l=2.15m

H1xL2.5m l=2.61m

H1xL3.0m l=3.08m

Crab® Brace

It consists in a tube ø 38 provided at the both ends with a wedge-locking bolt. It ensures the structure vertical bracing. Its size is determined by the braced bay height (H) and length (L)

Huatraco® C60 Tableform (Crab® 60 Tableform)

Page 23: Hu Atraco Catalog

21

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Tableform Trolley

It enables the tableform to be adjusted up / down to 1m high and to be moved freely.

Base Hook

It secure the Jack Bases / U-Heads for lifting.

Lifting Truss

It enables the tableform to lift and fly.

Universal Clamp

It secure the secondary to primary.

Displacement Frame C/W Castor Wheel

It enables the tableform or shoring structre to be adjusted up / down and to be moved freely.

T-Clamp

It secure the primary to the U-Heads.

Primary & Secondary

HT Beam.

Primary & Secondary

HT waler, HT Bearer & HT Runner.

0.30 x 0.70m

0.30 x 1.00m

0.30 x 1.50m

0.30 x 1.80m

0.30 x 2.00m

0.30 x 2.50m

0.30 x 3.00m

0.20 x 0.70m

0.20 x 1.00m

0.20 x 1.50m

0.20 x 1.80m

0.20 x 2.00m

0.20 x 2.50m

0.20 x 3.00m

Crab® Walking Board

It is metal platform made of galvanized steel perforated sheet. Fixation by 4 U-shaped hooks with locking and anti-upheaval device.

Crab® Stair

Components

Huatraco® C60 Tableform (Crab® 60 Tableform)

Page 24: Hu Atraco Catalog

22

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

1

3

5

2

4

6

7 8

Position the jack bases at the intervals determined by the ledgers. Fix the basic standards into the jack bases.

Clamp the 1st level of ledgers.

• Insert the standards into the basic standards.• Clamp the 2nd level of the ledgers.• Check the structure is level.

Fix the diagonal braces.

Position temporary platforms. • Insert the standards for upper lift.• Insert S-pins / bolts in between the standards.

Clamp the 3rd level of ledgers, fix the diagonal braces and insert the U-heads.

Placed the primary & secondary of soffit formwork and secured plywood / panels on the secondary.

Erection Procedures

Huatraco® C60 Tableform (Crab® 60 Tableform)

Page 25: Hu Atraco Catalog

23

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco® C60 Shoring System

Huatraco® C60 Shoring System is a multi-directional & multi-level heavy duty shoring equipment to support all types of heavy structures, and is manufactured to comply with British Standard BS 5975 and BS EN 12812.

Efficiencies :

• Quick installation and dismantling

• Multilevelled and Multi-directional

• Interchangeable and Flexible

• Mistake Free

• Durable

(Crab® 60 Shoring System)

Page 26: Hu Atraco Catalog

24

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Condominium Buiding, Kuala Lumpur,Malaysia

Condominium Building, Kuala Lumpur, Malaysia

Huatraco® C60 Shoring System (Crab® 60 Shoring System)

Projects - Building Construction

Office Building, Putrajaya, Malaysia

Page 27: Hu Atraco Catalog

25

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Condominium Buiding, Kuala Lumpur,Malaysia

Hotel Buiding, Kuala Lumpur, Malaysia

Huatraco® C60 Shoring System (Crab® 60 Shoring System)

Projects - Building Construction

Office Building, Kuala Lumpur,

Malaysia

Page 28: Hu Atraco Catalog

26

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Demolition of Building, Selangor, Malaysia

Power Plant, Port Dickson, Malaysia

Huatraco® C60 Shoring System (Crab® 60 Shoring System)

Projects - Building Construction

Condominium Buiding, Singapore

Page 29: Hu Atraco Catalog

27

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Convention Centre, Putrajaya, Malaysia

Huatraco® C60 Shoring System (Crab® 60 Shoring System)

Projects - Building Construction

Office Building, Kuala Lumpur, Malaysia

Page 30: Hu Atraco Catalog

28

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Airport, Sepang,Malaysia

Airport, Sarawak, Malaysia

Huatraco® C60 Shoring System (Crab® 60 Shoring System)

Projects - Building Construction

Page 31: Hu Atraco Catalog

29

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Commercial Building, Singapore

School Building, Singapore

Office Building, Singapore

Condominium Building, Singapore

Huatraco® C60 Shoring System (Crab® 60 Shoring System)

Projects - Building Construction

Page 32: Hu Atraco Catalog

30

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

LRT Terminal, Putrajaya, Malaysia

LRT, Kuala Lumpur, Malaysia

Komuter & LRT Terminal, Kuala Lumpur, Malaysia

Huatraco® C60 Shoring System (Crab® 60 Shoring System)

Projects LRT & MRT Construction

Page 33: Hu Atraco Catalog

31

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

MRT, Singapore

LRT, Singapore

Huatraco® C60 Shoring System (Crab® 60 Shoring System)

Projects LRT & MRT Construction

Page 34: Hu Atraco Catalog

32

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

MRT, Dubai UAE

LRT, Manila, Philippines

Projects - LRT & MRT Construction

Huatraco® C60 Shoring System (Crab® 60 Shoring System)

Page 35: Hu Atraco Catalog

33

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco® C60 Shoring System (Crab® 60 Shoring System)

Sungai Johor Bridge,Senai-Pasir Gudang-Desaru

Highway, Malaysia

Projects - Bridge Construction

Page 36: Hu Atraco Catalog

34

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Cable Stayed Bridge, Putrajaya, Malaysia

Projects - Bridge Construction

Huatraco® C60 Shoring System (Crab® 60 Shoring System)

Page 37: Hu Atraco Catalog

35

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

New Pantai Highway, Kuala Lumpur, Malaysia

Projects - Bridge Construction

Huatraco® C60 Shoring System (Crab® 60 Shoring System)

Page 38: Hu Atraco Catalog

36

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Kuala Lumpur, Putrajaya Highway, Malaysia

Projects - Bridge Construction

Huatraco® C60 Shoring System (Crab® 60 Shoring System)

Page 39: Hu Atraco Catalog

37

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

EDL Expressway, Johor Bahru, Johor, Malaysia

Besraya Eastern Extension, Kuala Lumpur, Malaysia

Projects - Bridge Construction

Huatraco® C60 Shoring System (Crab® 60 Shoring System)

Bridge Over Railway Track

Sunway Directional Ramp Lebuhraya Damansara Puchong Package 2, Malaysia

Page 40: Hu Atraco Catalog

38

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Projects - Tank & Roof Construction

Huatraco® C60 Shoring System (Crab® 60 Shoring System)

Elevated Water Tank, Kuala Lumpur, Malaysia

Roof Construction, Penang,Malaysia

Treatment Plant, Kuala Lumpur, Malaysia

Page 41: Hu Atraco Catalog

39

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Crab® Triangle 0.7m and 1.5m

Four adjacent triangle enable to form a 1.00m high lift of a tower. The vertical member is equipped with 3 crab stirrups, One end of the horizontal tube is provided with a wedge-clamp.

Crab® S-Pin C60

It is S-shaped and secures the tower for lifting.

Crab® Standard C60 0.3m, 0.5m, 0.75m, 1m and 2m

They are used in conjunction with triangle to erect narrow rows. They can be coupled to a tower in case of load concentrations. Also, they are used for height adjustment.

Crab® U-Head C60 / 600

It is designed to accomodate primary, secondary, etc...

Crab® Plan Brace

It is used ensure the squareness of tower.

Crab® Jack Base C60 / 600

It enables to compensate the ground unevennesses.

Crab® Basic Standard C60

It facilitates the erection, the tower levelling and the general layout.

Components

Huatraco® C60 Shoring System (Crab® 60 Shoring System)

Page 42: Hu Atraco Catalog

40

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

0.35m

0.50m

0.70m

1.00m

1.50m

1.80m

2.00m

2.50m

3.00m

0.30 x 0.70m

0.30 x 1.00m

0.30 x 1.50m

0.30 x 1.80m

0.30 x 2.00m

0.30 x 2.50m

0.30 x 3.00m

0.20 x 0.70m

0.20 x 1.00m

0.20 x 1.50m

0.20 x 1.80m

0.20 x 2.00m

0.20 x 2.50m

0.20 x 3.00m

H2xL0.7m l=2.09m

H2xL1.0m l=2.19m

H2xL1.5m l=2.45m

H2xL1.8m l=2.63m

H2xL2.0m l=2.76m

H2xL2.5m l=3.13m

H2xL3.0m l=3.53m

H1xL0.7m l=1.17m

H1xL1.0m l=1.35m

H1xL1.5m l=1.73m

H1xL1.8m l=1.98m

H1xL2.0m l=2.15m

H1xL2.5m l=2.61m

H1xL3.0m l=3.08m

Crab® Walking Board

It is metal platform made of galvanized steel perforated sheet. Fixation by 4 U-shaped hooks with locking and anti-upheaval device.

Crab® Ledger

It is made of tube ø 48 and is provided at both ends with a wedge-clamp.

Crab® Displacement Frame C/W Castor Wheel

It enable the tableform or shoring structure to be adjusted up / down and to be moved freely.

Crab® Brace

It consists in a tube ø 38 provided at the both ends with a wedge-locking bolt. It ensures the structure vertical bracing. Its size is determined by the braced bay height (H) and length (L)

Crab® Stair

Components

Huatraco® C60 Shoring System (Crab® 60 Shoring System)

Page 43: Hu Atraco Catalog

41

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Position the jack bases at the intervals determined by the ledgers. Fit the basis standards into the jack bases. Fit the first plan braces, rings downwards.

Clamp the 1st level of ledgers. Insert and lock the first lift of triangle. Check the structure is level.

Fit the second lift of the triangle, reverse the direction of triangle.

Erection must be carried out from inside the towers. Fit the triangle at lift 3, observing the safety regulations, protected by the triangle of the lower lift. The temporary platforms from lift 1 are moved to lift 2.

Position temporary platforms, check the contact of vertical posts/standards using the sighting device provided on each triangle sleeve. The upper and lower tubes should be in contact at each leg.

Fit triangle at lift 4, still working safety from second platform. Reverse the direction of the triangle.

3

1

5

2

4

2

6

Link up the standard with the ledgers. Insert the U-heads into the vertical posts/standards.

Complete the service platform for fitting girders, joists, wall pieces and formwork panels. This platform should remain in position to allow for inspection, levelling and removing of formwork.

7 8

Erection Procedures

Huatraco® C60 Shoring System (Crab® 60 Shoring System)

Page 44: Hu Atraco Catalog

42

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

1

3

5

2

4

6

7 8

Position the jack bases at the intervals determined by the ledgers. Fix the basic standards into the jack bases.

Clamp the 1st level of ledgers.

• Insert the upper standards into the basic standards.• Clamp the 2nd level of the ledgers.• Check the structure is level.

Fix the diagonal braces.

Position temporary platforms. • Insert the standards for upper lift.• Insert S-pins / bolts in between the standards.

Clamp the 3rd level of ledgers, fix the diagonal braces and insert the U-heads.

Placed the primary & secondary of soffit formwork and secured plywood / panels on the secondary.

Erection Procedures

Huatraco® C60 Shoring System (Crab® 60 Shoring System)

Page 45: Hu Atraco Catalog

43Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco®

(Crab® 25 Modular System)

Huatraco® C25 Modular System

Huatraco® C25 Modular System is manufactured and complied with British Standard BS1139 : Part 5 and BS EN 12810 -1&2. This system is approved by the Department of Occupational Safety and Health, Malaysia.

Efficiencies :

• Quick installation and dismantling

• Multilevelled and Multi-directional

• Interchangeble and Flexible

• Mistake Free

• Durable

Page 46: Hu Atraco Catalog

44 Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco®

Crab® Multi-Directional System

Connection at 20 Directions and more.....

Introduction

Joint at every 500mm vertically

Crab® Multi- Levelled System

Huatraco® C25 Modular System (Crab® 25 Modular System)

Page 47: Hu Atraco Catalog

45Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco®

Certifications

Huatraco® C25 Modular System (Crab® 25 Modular System)

Page 48: Hu Atraco Catalog

46 Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco®

Cable Stayed Bridge, Putrajaya, Malaysia.

Projects - Construction

Huatraco® C25 Modular System (Crab® 25 Modular System)

Page 49: Hu Atraco Catalog

47Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco®

Shopping Mall, Putrajaya, Malaysia.

Projects - Construction

Huatraco® C25 Modular System (Crab® 25 Modular System)

Page 50: Hu Atraco Catalog

48 Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco®

Shopping Mall, Putrajaya, Malaysia.

Projects - Construction

Huatraco® C25 Modular System (Crab® 25 Modular System)

Page 51: Hu Atraco Catalog

49Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco®

Huatraco® C25 Modular System (Crab® 25 Modular System)

KL Sentral, Malaysia. (Scaffold over LRT track)

Tunnel Construction

Monorail Kuala Lumpur, Malaysia

Projects - Construction

Page 52: Hu Atraco Catalog

50 Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco®

Office Building, Putrajaya, Malaysia

Mosque, Putrajaya, Malaysia

Power Plant, Sri Manjung, Malaysia

Projects - Construction

Huatraco® C25 Modular System (Crab® 25 Modular System)

Elevated Water Tank

Page 53: Hu Atraco Catalog

51Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco®

Mobil Tower

Shopping Complex

Stair Access Tower

Projects - Construction

Huatraco® C25 Modular System (Crab® 25 Modular System)

Page 54: Hu Atraco Catalog

52 Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco®

Pylon Acess Tower, Penang

Bridge, Malaysia

Projects - Maintenance

Huatraco® C25 Modular System (Crab® 25 Modular System)

Page 55: Hu Atraco Catalog

53Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco®

Huatraco® C25 Modular System (Crab® 25 Modular System)

Oil & Gas Offshore Platform

Projects - Industrial Works

Page 56: Hu Atraco Catalog

54 Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco®

Oil & Gas Industries

Projects - Industrial Works

Huatraco® C25 Modular System (Crab® 25 Modular System)

Page 57: Hu Atraco Catalog

55Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco®

Projects - Industrial Works

Huatraco® C25 Modular System (Crab® 25 Modular System)

Petro-chemical

Ammonia Tank

Oil & Gas Industries

Page 58: Hu Atraco Catalog

56 Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco®

Air Craft

Shipyard

Projects - Industrial Works

Huatraco® C25 Modular System (Crab® 25 Modular System)

Page 59: Hu Atraco Catalog

57Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco®

Wall Climbing

Projects - Events

30 Meter Span Structure at F1 Sepang Internation Circuit, Malaysia

Self-standing Tower

The Mines Resort, Malaysia

Huatraco® C25 Modular System (Crab® 25 Modular System)

Page 60: Hu Atraco Catalog

58 Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco®

Crab® Standard C25

It consist a tube ø 48 with four stirrups welded at 90° at 0.50m intervals. One end forms a spigot to centre the standards and avoid any disconnection. They can be pinned together.

Crab® Jack Base C25 / 500

It enables to compensate the ground unevennesses.

Crab® Brace

It consists in a tube ø 38 provided at the both ends with a wedge-locking bolt. It ensures the structure vertical bracing; when doubled, it enables to get large working areas on brackets. Its size is determined by the braced bay height(H) and length(L)

Crab® Socket base C25

When used with a castor wheel, it enables to erect mobile structures.

Crab® Ledger

It is made of tube ø 48 and is provided at both ends with a wedge-clamp.

Crab® U-Head C25 / 500

It is designed to accomodate primary, secondary, etc

Crab® Board Bearer

It cuts the span of the boards which constitute the working or access areas.

Crab® Caster Wheel

Crab® Reinforced Ledger

It enables to increase the platform working load.

0.35m

0.50m

0.70m

1.00m

1.50m

1.80m

2.00m

2.50m

3.00m

Standard 3.00m

Standard 2.00m

Standard 1.00m

Basic Standard

0.70m

1.00m

1.50m

1.80m

2.00m

2.50m

3.00m

2.50m

3.00m

H2.00xL0.70 l=2.09

H2.00xL1.00 l=2.19

H2.00xL1.50 l=2.45

H2.00xL1.80 l=2.63

H2.00xL2.00 l=2.76

H2.00xL2.50 l=3.13

H2.00xL3.00 l=3.53

(l) = locking bolt distance between axis

Components

Huatraco® C25 Modular System (Crab® 25 Modular System)

Page 61: Hu Atraco Catalog

59Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco®

Crab® Reinforced Board Bearer

It cuts the too important spans of the boards. It cannot be disconnected by the wind effects under the platform.

Crab® Ladder Beam 4m or 5m

They are used bridge passages. In the middle of the upper boom, they comprise a spigot for positioning a standard.

Crab® Walking Board

It is metal platform made of galvanized steel perforated sheet. Fixation by 4 U-shaped hooks with locking and anti-upheaval device.

Crab® Small Post

Equipped with a wedge-coupler, it is used at the end of the bracket, as a guard-rail post, or onto the horizontal members, in order to cut the span of storage or circulation areas.

Crab® Stair

Crab® S-Pin C25

It is S-shaped and firmly secures the standards together.

Crab® Toe - Board

It is 150mm high in compliance with the regulations. It is secured by mere housing into the stirrups of the standards.

0.30 x 0.70m

0.30 x 1.00m

0.30 x 1.50m

0.30 x 1.80m

0.30 x 2.00m

0.30 x 2.50m

0.30 x 3.00m

0.20 x 0.70m

0.20 x 1.00m

0.20 x 1.50m

0.20 x 1.80m

0.20 x 2.00m

0.20 x 2.50m

0.20 x 3.00m

0.70m

1.00m

1.50m

1.80m

2.00m

2.50m

3.00m

Components

Huatraco® C25 Modular System (Crab® 25 Modular System)

Page 62: Hu Atraco Catalog

60 Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco®

Position the jack base, spaced according to the lengths of the lingitudinal and transverse horizontal members.

Fit the basic standards or standard into the jack base.Fit the horizontal members.Check the structure is level.

Fit the first working platform to ease the erection.Erect the complete working platform in the access bay.

Build the first lift.Fit the horizontal members.

Fit the access trapoor platform in the access bay.Lower the ladder.Check continuosly that the structure is level.

Fit the platform in each cell of the first stage.Stablilise the structure longitudinally by fitting diagonal braces at the side away from the working area (inset).

1

3

5

2

4

6

Erection Procedures

Huatraco® C25 Modular System (Crab® 25 Modular System)

Page 63: Hu Atraco Catalog

61

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

(Self-Climbing Screen System)Natform® Screen System

Natform® Screen System is a self-climbing safety protection panel system for building construction industry. It offers the industry savings in time and labour without compromising site safety.

Efficiencies :

• Fast installation, removal and easy to handle

• Self-climbing

• Working platform positions are flexible

• Less manpower

• Increase the construction speed and program time

Page 64: Hu Atraco Catalog

62

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Natform® Screen System (Self-Climbing Screen System)

Page 65: Hu Atraco Catalog

63

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Natform® Screen System (Self-Climbing Screen System)

Page 66: Hu Atraco Catalog

64

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Natform® Screen System (Self-Climbing Screen System)

Page 67: Hu Atraco Catalog

65

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Natform® Screen System (Self-Climbing Screen System)

Page 68: Hu Atraco Catalog

66

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Self-Climbing By Hydralic Jack Device

Typical Section of Natform Screen System

Natform® Screen System (Self-Climbing Screen System)

Page 69: Hu Atraco Catalog

67

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Steel Frame Scaffolding& Steel Props

Huatraco®

Page 70: Hu Atraco Catalog

68

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Steel Frame ScaffoldingProjects

Condominium

Page 71: Hu Atraco Catalog

69

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Steel Frame ScaffoldingBasics Of Assembling External Scaffolding

1. Lay wooden planks in horizontal position and install jack bases.

2. Insert vertical frames into jack base as per drawing.

3. Insert arm locks to ensure stability and safety.

4. Fix the cross braces to the frames.

5. Fix the lock into walking frame. It is recommended that walking frame be installed in alternate 3 -5 stories.

6. Insert joint pins into each ends of the frame and repeat the above process for greater heights.

1. HT 202 Walking Frame

2. HT 102 Vertical Frame

3. HT 301 Cross Brace

4. HT 801 Arm Lock

5. HT 701 Joint Pin

6. HT 205 Walking Board

7. HT 601 Jack Base

8. HT 514 Stair

9. HT 201 Walking Frame

10. HT 901 Hand Rail Pole

11. HT 902 Hand Rail

The above shows components required and erecting method for external scaffolding.

Whenever special features persist causing problems in erection of external scaffolding, the above methods are preferred.

Page 72: Hu Atraco Catalog

70

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

CODE

HT 104

HT104A

HT 104B

HT 104C

HT 104D

HT 104E

A

762

762

762

762

762

762

B

1700

1524

1219

914

490

2000

C

1219

1219

914

610

280

1219

D

329

153

153

152

58

629

HT 107 Ladder Type Frame HT 108 Ladder Type Frame

Scaffolding Components List

Steel Frame Scaffolding

Page 73: Hu Atraco Catalog

71

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Steel Frame Scaffolding

Scaffolding Components List

HT 205 Walking Board HT 514 Stair

HT 601 Jack Base HT 602 U - Head

HT 486GI Pipe

HT 701 Joint Pin HT 801 Arm Lock HT 603 Caster HT 604 Base Plate

HT 901 Hand Rail Pole HT 902 Hand Rail HT 902 A Hand Rail HT 486 S/F Clamp

1829

CODE

HT 486 A GI

HT 486 B GI

HT 486 C GI

Size

48.6mm

48.6mm

48.3mm

Thickness

2.0mm

2.4mm

4.0mm

Length

6m

6m (STK 500)

6m (BS 1139)

CODE

HT 514B

HT 514D

A

1829

1829

B

1725

1955

450

Note : Special size can be make upon customer request. Unit : mm

Page 74: Hu Atraco Catalog

72

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Steel Props

Steel Props are made of pipes of high quality material attached with accessories. They replace timber props in contruction as they are easy to assemble, economical to use and time saving.

1. Easy to assemble a) Extend tube to required height. b) Set pin through hole of inner tube. c) Obtain exact height by sliding the screw position for minor adjustment. 2. Economical to use Steel props take more weight than timber props. They can be placed up to 2 metres apart depending on circumstances and less numbers are used making it economical. 3. Time Saving Fewer props means less labour involved and ease of assembling also saves time.

Description HT - 50 HT - 65 HT - 75 HT - 90

Max. length (mm) 2,030 3,200 3,500 3,900

Min. length (mm) 1,220 1,740 1,900 2,200

Available in other sizes

Set the pin into the hole of inner tube.

Adjust the height by sliding the screw

position.

TOP PLATE

G PIN

LOWER TUBE60 ø mm

UPPER TUBE48 ø mm

COLLAR

ADJUSTABLE HOLE

HANDLE

BASE PLATE

Page 75: Hu Atraco Catalog

73

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Tubular Scaffolding

Huatraco®

Page 76: Hu Atraco Catalog

74

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Tubular ScaffoldingComponents (BS 1139, BS EN 39 & BS EN 74)

SWIVEL COUPLER

BEam CLamP /

GIRDER COUPLER

SInGLE COUPLER

DOUBLE COUPLER

PUtLOG

SLEEVE COUPLER JOInt PIn

BS1139BS SCaFFOLD PIPEø48.3 X 4.0mm OR 3.2mm(HOt-DIPPED GaLV.)

Page 77: Hu Atraco Catalog

75

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Huatraco® Metal Deck

Width (W) 210, 240, 250

Length (L) 1,500, 2,000, 3,000 4,000

Sizes available in milimeter

Page 78: Hu Atraco Catalog

76

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Cuplock System & All-Round System

Page 79: Hu Atraco Catalog

77

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

Standard

Length = 1.0m, 1.3m, 1.5m, 1.8m, 2.0m, 2.3m, 2.5m, 3m

Length =

0.6m, 0.9m, 1.0m, 1.2m, 1.3m,1.6m, 1.8m, 2.5m

Intermediate Transom

Forkhead Universal Jack Socket Base Spigot & Bolt

Length = 760, 860mm

Length =

0.6m, 0.9m, 1.0m, 1.2m, 1.3m,1.6m, 1.8m, 2.5m

Ledger

Cuplock System

Page 80: Hu Atraco Catalog

78

Huatraco®

Specialist Solutions in Scaffolding & Formwork Engineering

All-Round System

Standard

Length = 0.5m, 1.0m, 1.5m, 2.0m, 2.5m, 3.0m

Ledger

Length =

0.5m, 0.7m, 1.0m, 1.5m, 1.8m, 2.0m, 2.5m, 3.0m,1.219m, 1.829m, 2.438m, 3.048m

Length =

0.5m, 0.7m, 1.0m, 1.5m, 1.8m, 2.0m, 2.5m, 3.0m,1.219m, 1.829m, 2.438m, 3.048m

Length =

H2.0m x L0.7m, 1.0m, 1.5m, 1.8m, 2.0m, 2.5m, 3.0m,1.219m, 1.829m, 2.438m, 3.048m

Brace

Intermediate Transom

U-Head 500 Jack Base 500 Socket Base Base Post

Length = 500mm Length = 500mm