Http:// DORII: Training for Pilot Application Evaluation Paolo Gamba Matteo Lanati.
-
Upload
trent-eastman -
Category
Documents
-
view
218 -
download
0
Transcript of Http:// DORII: Training for Pilot Application Evaluation Paolo Gamba Matteo Lanati.
http://www.dorii.eu/
DORII: Training for Pilot Application Evaluation
Paolo GambaMatteo Lanati
Components
Computing element
Sto
rage elem
ent
Virtual organisation
Coordinated and secure sharing
Components (2)
Computing element
Sto
rage elem
ent
Virtual organisation
Information serviceBDII (Berkeley Database Information Index)
Broker / WMF
Metad
ata and
file catalo
g
Instrument element
Workload Management System
Instrument Element: requirements
Control and monitoring of up to 104 nodesWeb accessRTT like human reaction timeMaximum response timeFast collection timeReliable message deliveryReach a single point of storageOnline diagnostic and recovery
Instrument Element: definition & architecture
the term Instrument Element describes a set of services that provide the needed interfaces and implementation enabling the remote control and monitoring of physical instruments.
Set of interfaces
Virtual instrument grid services
Virtual ControlRoom
interaction
Instrument Element:control manager
Instrument Element:what we need
Instrument manager definition
XML file containing
state definitioncommands for state transitionattributes (subscribe, lock, ...)
Java file containingclass describing commands
User(VCR installed)
Grid Network Sensing Unit( IE + IM deployed )
SensorArduino Board
Use case
General framework
VCR
Workflow
Monitor
WF managsystem
CESE IE WFM LFC
tunnel
gEclipseclient
Multipurpose virtual
laboratory
Middleware
DORII applications
Deployment Of Remote Instrumentation Infrastructure
Two proposals:network-centric seismic simulations (pseudo-dynamic tests)eartquake early warning system (vulnerability curves)
Consortium decided the priority:Pilot applications (1st release in 1 year): simulations + oceanic and costal observation by gliders (OGS) and images (UC)Non Pilot applications: EEWS + on line tomography data analysis (Elettra)
What is expected by Eucentre
Accessibility to the infrastructure
Support for adaptation to the grid
A close look to NCSS
Actuators (controllers)
PDE solver (TREMURI)
Sensors (gyroscopes)
Measurements (sensors)
Sensors (video)
PDE solutions (TREMURI)
Detailed task list for Developers /Scientists
1.Registration
2.Login
3.Credential Management
4.Select Eucentre's IE element
Detailed task list for Developers /Scientists
1.Apply the force to the specimen using hydraulic valve IM
2.Check the force using the load cell IM
Detailed task list for Developers /Scientists
1.Start the synchronous acquisition
2.Repeat 5 – 6 until completing the cycle test
Detailed task list for Developers /Scientists
1.Possible interaction with other users
2.Stop the acquisition
3.Data movement, if needed
4.Launch the job (filtering and computation)
5.Collect data
6.Log out
Detailed task list for Technicians
1.Registration
2.Login
3.Credential Management
4.Select Eucentre's IE element
5.Select load cell
6.Check data for safety reason
7.Possible interaction with other users
8.Launch filtering job
9.Data collection
10.Log out
Thank you for your attentionand …
Let's start