BOUGAINVILLEA
Philko Ubins LTD
Product Name:
Contractor's Company:
Site Name:
PLDT OSP MSAN FTK PROJECT
Official Project Name
REMINDERS:
1. DO NOT MAKE FABRICATED PICTURES ON YOUR PRESENTATION TO
AVOID (SCAR) PENALTY.
2. PUT N/A IF THE INSTALLATION IS NOT APPLICABLE TO YOUR SCOPE
OF WORK.
3. HANDWRITTEN LABELS ARE UNACCEPTABLE.
4. CABINET/S, 19" RACK/S, BOARD/S, SUBRACK/S, PANEL/S, CIRCUIT
BREAKERS AND SIGNAL/POWER/GROUNDING CABLES SHOULD HAVE
PRINTED LABEL.
5. TERMINATION OF ALL GROUNDING CABLES TO THE BUSBAR SHOULD
BE FIRMED.
6. USE PROPER CRIMPING TOOLS AND SHRINKABLE TUBE TO FIX ALL
TERMINAL LUGS.
7. ALL NEWLY INSTALLED CABINET AND RACK/S SHOULD HAVE
GROUNDING & INSULATION PLATES.
8. SHOW 4-PICTURES OF YOUR WORKING AREA
I. PICTURE OF POLE MOUNTED CABINET:
II. PICTURE OF BRICK STRIP:II. PICTURE OF BRICK STRIP:
III. PICTURE BRICK STRIP INSTALLATION
IV. PICTURE OF GUYING:
U-GUARD
CERAMIC INSULATOR 506
V. PICTURE OF MESSENGER WIRE AND LASHING:
VI. PICTURE OF DISTRIBUTION POINT AND CLOSURE:
MESSENGER WIRE
VI. PICTURE OF DISTRIBUTION POINT AND CLOSURE:
3M SLIC CLOSURE
PLDT DP
3M SLIC CLOSURE
MESSENGER WIRE
CLAMP
PLDT YELLOW TIE
STAINLESS STRAPS
DISTRIBUTION
CABLE HOLDER
VII. PICTURES OF COPPER SPLICING AND SPLICE POINTS
SPLICING POINTS
VIII. PICTURES OF GROUDING:
GROUND CLAMP
GROUND ROD
GROUNDING CLIP