how to write resume

6
MUHAMMAD JAVAID House # F-22 Maple leaf Cement China Colony Iskanderebad District Mainwali Cell: 0334-1760071 / 0303-0421780 [email protected] [email protected] Objective: Seeking a challenging position to utilize my education and experience in the field of electric engineering profession. To attain and strive for the position of target achievable personally and along with allowable resource. Establishment of ideal working relationship with professional staff at all levels in a team to meet company’s standards of quality and accuracy. Management of multiple tasks by setting priorities according to need, demand and urgency. Father Name : Muhammad Ramzan Date of Birth : 15-04-1972 N.I.C No : 31301-1443067-7 Passport # : AT8690671 Permanent address : Gulshan-e-usman colony near almacca petrol pump Rahim Yar Khan Road, khan Pur, Distt. Rahim Yar Khan Religion : Islam Marital Status : Married Nationality Pakistani Cell No : 0302-2071943 Personal Profile:

description

fgs

Transcript of how to write resume

Page 1: how to write resume

MUHAMMAD JAVAIDHouse # F-22 Maple leaf Cement China Colony

Iskanderebad District MainwaliCell: 0334-1760071 / 0303-0421780

[email protected]@kmlg.com

Objective:

Seeking a challenging position to utilize my education and experience in the field of electric engineering profession. To attain and strive for the position of target achievable personally and along with allowable resource. Establishment of ideal working relationship with professional staff at all levels in a team to meet company’s standards of quality and accuracy. Management of multiple tasks by setting priorities according to need, demand and urgency.

Father Name : Muhammad RamzanDate of Birth : 15-04-1972 N.I.C No : 31301-1443067-7 Passport # : AT8690671Permanent address : Gulshan-e-usman colony near almacca petrol pump Rahim Yar Khan Road, khan Pur, Distt. Rahim Yar Khan Religion : IslamMarital Status : MarriedNationality PakistaniCell No : 0302-2071943

Post Applied For : ELECTRICAL SUPERVISOR

DAE (Electrical) Govt. College of Technology Karachi from S.T.B. Karachi1991 - 2nd Division

Matric (Science) Govt. Hight School khan Pur District Rahim Yar Khan (BISE Bahawal Pur) 1988 - 2nd Division.

Personal Profile:

Qualification:

Page 2: how to write resume

Professional Experience

1-Mapel Leaf Cement Factory Limited (Cement Manufacturing Plant Iskanderabad District Mianwali)

Position: Assistant Electrical Engineer 20-04-2011 to date

Work Duties: In Power Generation Plant maintenance & operation department. My duties include:

Operating and Breakdown plan Preventive, Predictive & Annual Maintenance Following Equipment:

56W Dual Fuel Power Plant

1. Niggata Diesel 18v32clx capacity 5.96MW each x 4 sets. 24MW2. Wartsila 18V50DF capacity 16MW3. Kawasaki WHRP Steam Turbine 16MW

Have well knowledge of troubleshooting & Power System Protection, Control Relays, Electrical Power, Control Circuit faults Rectify, H.T panel (SF6 Merlin Gerin Schneider, VCB Toyo Denki, and Siemens), 132kv/6.6kv grid station capacity 50MW, 10MW also

inspection and Maintenance work, Control& power work, L.T distribution system Sivicon Siemens Technology, Maintenance & Overhauling Lt, Ht Motors (Maximum 200kw) &Transformers, Steam turbine, Waste Heat Recovery Boiler and all related electrical work & instruments, MOV calibration &all related adjustment work . Plant electrical & instrument inspection & calibration work.

Coordination with Load dispatch, Plant availability, daily coordination with MLCF grid station. Planned and executed maintenance of Wartsila 18V50DEngines for mentioned operating

Hours 26000hrs & 36000hrs.and other above equipment Synchronization of engine (Wartsila) & Turbine (Kawasaki) with grid (WAPDA) during start up and stoppage of

engine (Wartsila). We synchronize with WAPDA during our energized system and also during unenergized system.

Computer Skills: Good Knowledge of M.S Office SAP (Systematic Applicable Program) Company Software of MLCF.

2-Indus Motor Company (Formally Toyota, Daihatsu Automobile Manufacturing Company Karachi).

Position: Team Leader Electrical (Utility) in 05-11-2007 to 30-04-2011Work Duties:

Page 3: how to write resume

At plant Engineering and Maintenance Department, I worked on Operating and Breakdown plan, Preventive, Predictive & Annual Maintenance Following Equipment:

10 MW Co-Generation Power House:

1. G3516C Catter Pillar 1600KW X 3 Sets 2. D3516B Catter Pillar 1800KW 1 Set3. GPB Kawasaki 1.5KW 1 Set

760 kW Power Generation Stand By:

1. Cater Pillar 3412, 400 kW each 2Sets Total = 800 kW2. F.G Willson 80kw3. F.G Willson 40kw

Having well knowledge about troubleshooting & good knowledge of Electrical Protection, Control Relays, Electrical Power, Control Circuit faults Rectify, Communication System.

Maintenance & operation work all utility area. Maintenance Overhauling Lt, Ht Motors (Maximum 800kw) &Transformers, H.T panel (Siemens) control &

power work, L.T distribution system & Rectify Faults of LT, HT System. Oil free air Compressor (Screw Type), Oil Injected Air Compressor Screw Reciprocating Types. All types of cooling Towers (Balty More), Soft water plant, Raw Water and Fire Fighting (fukada).

Computer Skills:M.S Office, SAP (Systematic Applicable Program), Company Software of IMC.

3- Anoud Power GenerationClient of National oil Refinery, Kesc, Enar Petro Tech Service, P.S.O.

Position: Electrical Supervisor02-06-2000 to 02-11-2007

Work Duties:

Provide 10MW Kesc Korangi grid station .At Bengali camp near bilal chorangi Karachi. I worked in maintenance and operation department

24MW Power Generation Korangi Industrial Area Karachi:Niggata Diesel 18v32clx capacity 5.96MW each x 4 sets.

Good knowledge of Electrical Protection, control relays & rectification faults. Having well knowledge about troubleshooting & maintenance of all auxiliary such as viscosity controller,

Exhaust gas boiler (Clayton Belgium), Water treatment plant, maintenance of Vacuum circuit Breaker, LT Air circuit breaker, Adjustment of Temperature switch, Pressure Switch & Flow Switch

Maintenance of transformer, generator, Lt, H.t, motors .H.T Cable jointing work, Earth system & Battery bank acts.

Anoud Power Plant (Site Noori Abad)

Page 4: how to write resume

Capacity, 900KW X 4SETS =3.6MW Waukesha Lt 5794

I took part in erection of Anoud power generation Ltd. All electrical installation and commissioning completed under my supervision. I performed duty for six month (during commissioning) .

4- Descon Engineering Ltd . Client of Pak Arab oil refinery (PARCO) Muzafargarh (During commissioning)

Position: Electrician 05-04-1999 to 23-05-2000

Work Duties:

Worked at control & power instruments, cable termination , loop testing & commissioning work , H.T. cable testing work, L.T testing work, temperature, pressure, flow, level switch adjustment & calibration work.

Testing of H.T, L.T Motor testing, Transformer and substation panels and Meggering,

5- Swanmet (Malaysia) Sdn Bhd. Ferious non-Ferious foundry

Position: Senior Electrical Technician 27-01-1997 to 20-09-1998

Work Duties:

Operation & maintenance of kone crane, Damage crane 20ton, Mould mixer machine, Angle grinder high frequency 200Hz, Furnace (pillar

company) 1100KW, All types of H.T, L.T motors, generators and transformers. H.T, L.T Power distribution System

6- Gulistan Power Generation Ltd. 12MW Power Generation Shekhepura Faisalabad- Niggata diesel 8v32clx 3 x 3.94each sets.

Position: Electrical Technician (Maintenance & Operation)01-02-1994 to 20-01-1997

Work Duties:

Troubleshooting & maintenance of: all auxiliary such as H.F.O & L.O purifier, viscosity controller, exhaust gas boiler and water treatment plant H.T, L.T maintenance work, H.T circuit breaker, Air circuit breaker, Thermocouple, Pt 100, Temperature,

Pressure, Flow, Level Switch. Maintenance of transformer, generator etc L.T motors, Earthing system, Battery bank etc