How to Design a Corrosion Pipe Loop Study
Transcript of How to Design a Corrosion Pipe Loop Study
![Page 1: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/1.jpg)
Emily Tummons, PhD, PEBlack & Veatch
OAWWA Virtual Education SummitSeptember 29, 2020
How to Design a Corrosion Pipe Loop Study
![Page 2: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/2.jpg)
Black &Veatch
Agenda
• Purpose of Pipe Loop Testing • Harvesting Materials & Conditioning • Pipe Loop Case Studies
• Batch Systems (2)• Online Chemical Feed Systems• Multiple Pipe Loops Throughout a
System• Conclusions
![Page 3: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/3.jpg)
Black &Veatch
Purpose of Pipe Loop Testing
3
![Page 4: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/4.jpg)
Black &Veatch
• Captures hydraulic effects; reflects full-scale conditions
• Longer testing period, can capture seasonal results
• Can use new or harvested materials
• Increase confidence of the outcomes
EPA’s proposed LCR states that pipe loop testing would be required before changing corrosion control treatment
4
Purpose of Pipe Loop Testing
![Page 5: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/5.jpg)
Black &Veatch
• Considering change in corrosion control treatment
• Changing coagulants, disinfectants, or other processes
• Optimize chemical use
• Adding a new source water
• Changing source waters
5
Reasons for Pipe Loop Testing
![Page 6: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/6.jpg)
Black &Veatch
Harvesting Materials for Testing & Conditioning
6
![Page 7: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/7.jpg)
Black &Veatch
• Benefit of examining impact on existing pipe scale
• Analysis of scale could highlight analytes to test for
• Notes:• Limit disturbances to pipe
• Mark direction of flow
• Prepare for conditioning time
• Best to harvest and then install in pipe loop
Harvesting materials best mimics full-scale conditions
7
Harvesting Materials
![Page 8: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/8.jpg)
Black &Veatch
• Pipe scale needs to equilibrate after harvesting
• Expose the pipes to the same water quality
• Stagnation and flowing periods (same as testing plan)
• Collect baseline samples
• Build pipe loop before harvesting materials to decrease conditioning
Conditioning length depends on care taken during harvestingTypically 1-3 months
8
Conditioning is Critical
![Page 9: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/9.jpg)
Black &Veatch
Poll Question 1
9
![Page 10: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/10.jpg)
Black &Veatch
Case Study 1 – Batch Pipe Loop
10
![Page 11: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/11.jpg)
Black &Veatch
• Two water sources (only one available at pipe loop location)
• Examined impact of:• Seasonally switching sources
• Raising pH
• 4 replicate loops
• 3 months of conditioning
• 6 months of testing
11
Case Study 1 – Batch Pipe Loop
![Page 12: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/12.jpg)
Black &Veatch
• Materials (triplicate):• Harvested ¾-inch galvanized iron
• Harvested brass meters (pre-2014)
• New ¾-inch copper pipe
• Timer controls created flowing & stagnation periods
• Weekly samples• Forward flow after materials
12
Case Study 1 – Batch Pipe LoopBrass Meter
Copper Pipe
Galvanized Iron
![Page 13: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/13.jpg)
Black &Veatch
• 4 treatment conditions• 2 sources
• 2 sources with increased pH
• Water chemistry adjusted 2x/week• Target pH and Cl2
• Flowrate = 1 gpm
• Once through flow design
13
Case Study 1 – Batch Pipe Loop
![Page 14: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/14.jpg)
Black &Veatch 14
Pipe Loop Testing Results
BBS = Control
Switching sources resulted in a 45% increase in copper
Increasing pH:• Mitigated source switch• Decreased copper
![Page 15: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/15.jpg)
Black &Veatch
Case Study 2 – Batch Pipe Loop
15
![Page 16: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/16.jpg)
Black &Veatch
• Adding new source & evaluating changes in chemistry
• New water not available at site• Examined impact of:
• Changing pH and calcium• Reversal of flow• Switching sources
• 2 sets of 4 replicate pipe loops• 3 months of conditioning • 6 months of testing
16
Case Study 2 – Batch Pipe Loop
![Page 17: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/17.jpg)
Black &Veatch
• Materials (triplicate):• Harvested 2-inch galvanized iron• new ½-inch copper pipe with lead
solder
• Once through flow design
17
Case Study 2 – Batch Pipe Loop
![Page 18: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/18.jpg)
Black &Veatch
• Materials (duplicate):• Harvested 6-inch cast iron (20 ft)
• Tested reversal of flow• Recirculated flow
• Limited water volume
18
Case Study 2 – Batch Pipe Loop
![Page 19: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/19.jpg)
Black &Veatch
Poll Question 2
19
![Page 20: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/20.jpg)
Black &Veatch
Case Study 3 – Online Chemical Dosing Pipe Loop
20
![Page 21: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/21.jpg)
Black &Veatch
• Evaluating changes in treatment at WTP (only source)• Online chemical dosing improved consistency of water quality
• Examined impact of:• Changing pH and adding polyphosphate
• 2 replicate pipe loops• 2 months of conditioning • 8 months of testing
21
Case Study 3 – Online Chemical Dosing Pipe Loop
![Page 22: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/22.jpg)
Black &Veatch
• Materials (triplicate):• Harvested ¾-inch galvanized iron• new ½-inch copper pipe with lead solder
• Weekly samples • Aesthetics and metals release
• Once through flow design
22
Case Study 3 – Online Chemical Dosing Pipe Loop
Galvanized Iron
Copper Pipe with Lead
Solder
![Page 23: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/23.jpg)
Black &Veatch
• Online Chemical Feed System• Chemical Storage Tanks• Metering Pumps• Sample Ports
• Requires calibration and frequent monitoring
• Throttling valves minimized changes in flow
23
Case Study 3 – Online Chemical Dosing Pipe Loop
![Page 24: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/24.jpg)
Black &Veatch 24
Pipe Loop Testing Results
Control• Fluctuations in
pH – increased copper
Increasing pH decreased copper
![Page 25: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/25.jpg)
Black &Veatch
Case Study 4 – Pipe Loops Throughout A Water System
25
![Page 26: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/26.jpg)
Black &Veatch
• 2 test materials (triplicate)• Copper pipe with lead solder
• Brass meter (harvested) and copper pipe
• No changes to water quality at pipe loops
• Evaluating impact of water age & reaction with pipe materials
• Captures seasonal results• 1 year testing period
26
Case Study 4 – Pipe Loops Throughout A Water System
Brass Meter with Copper Pipe
Copper Pipe with Lead
Solder
![Page 27: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/27.jpg)
Black &Veatch
• Water Treatment Plant (WTP)
• Gezon Pump Station (Gezon)
• Clean Water Plant (CWP)
27
3 Pipe Loop Locations
• Evaluate WQ changes throughout the system
• Same design and materials at each location
![Page 28: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/28.jpg)
Black &Veatch
• pH stable throughout distribution system
• Consistent pH through 6 months of testing
• Source water is Lake Michigan – prone to changes in pH
28
pH at Pipe Loop Testing Locations
Preliminary Data
![Page 29: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/29.jpg)
Black &Veatch
Conclusions
29
![Page 30: How to Design a Corrosion Pipe Loop Study](https://reader030.fdocuments.net/reader030/viewer/2022012019/61687eedd394e9041f6ff1b8/html5/thumbnails/30.jpg)
Black &Veatch
• Pipe loop testing increases confidence for full-scale implementation
• Harvesting materials provides ability to understand impacts on existing pipe scale
• Conditioning phase is critical to getting valuable results
• Online chemical dosing is preferable if water is available at site
• Analyte testing frequency should be more frequent around changes in treatment
• Replicate pipes allows for ability to identify outliers
30
Conclusions